Bharat Electronics Limited (500049) Earnings Call Transcript
November 3, 2026
Earnings Call Speaker Segments
Ladies and gentlemen, good day, and welcome to BELl Q2 FY '27 Earnings Conference Call, hosted by ICICI Securities Limited. [Operator Instructions] Please note that this conference is being recorded. I now hand the conference over to Mr. Vikash Singh. Thank you, and over to you, sir.
Thank you. Good evening, everyone. A very warm welcome on Bharat Electronics Q2 FY '27 Results concert. On behalf of ICICI Securities, I would like to thank the management for giving us the opportunity to host them. From the management side, we have with us Mr. Manoj Jain, Chairman and Managing Director; Mr. Damodar Bhattad, as Director, Finance and CFO; and Mr. S. Sreenivas, Company Secretary. Without taking any much time, I'll hand over to Manoj sir for his opening remark. Over to you, sir.
Thank you. So I will just briefly summarize our financial highlights for H1, Q1 plus Q2 combined for the year '26, '27. The revenue from operations increased to INR 12,824 crores up to Q2, as compared to INR 1,180 crores, with a growth of 25.97%. The profit before tax has also increased to INR 3,467 crores up to Q2 as compared to INR 3,023 crores, with a growth of 14.6%. The profit after tax is increased to INR 2,589 crores up to Q2 as compared to INR 2,255 crores previous year up to the same time with a growth of 14.80%. The EBITDA to Q2 is 27.43%. The earnings per share has increased to INR 3.54 up to Q2 as compared to INR 3.09. The order book position as on [ 110-2026 ] is INR 16,717 crores, and orders acquired until [ 110-2026 in ] this financial year till now is INR 7,334 crore. So that is a brief financial highlights of H1, which includes Q1 and Q2 combined. That is a brief from my side.
[Operator Instructions] The first question is from the line of Amit Dixit from Goldman Sachs.
First of all, congratulations for a very good set of numbers. Sir, two questions from my side. The first one is with respect -- if you can mention when can we expect to get this order? And recently, one of the companies in their con call mentioned that there is a chance of QRSAM being allotted to private companies. So any thoughts on whether our share that we have been mentioning around INR 250 billion, would see a decline because of that. So that is the first question, sir.
Yes. So as you know, QRSAM was developed jointly by BEL and DRDO, which is a nominated production agency, and we invested during design phase also. So a lot of learnings have gone in the last 10-plus years. I think roughly, it started in 2014. And then we have submitted our bid based on [indiscernible] issue to us. So as such and based on our inputs also, order is expected on us very shortly. Hopefully, in next to CCS, they more clear. They are clearing one by one, all the big projects. So fully, we may get very, very soon, this order. Private company [indiscernible] I think that was mainly because there was one statement somewhere that all the missile orders will be now open to private sector also. But QRSAM is not missile alone. It is actually a complex missile system, where missile is only one portion of the total project, but it is a complete area defense system. It is an air defense system, consisting of different type of radars, launches, communication systems, interconnection of this and connecting this to the backbone. So overall, it is a complex system of system, I should say, and for which the expertise are acquired over a period of time by BEL right now. So I don't think at this point that private wala thing is possible, technically may not be definitely because it is a period of 10 to 12 years of cumulative experience of this type of a complex system of system, which we have developed over a period of time. Of course, our guru is DRDO, jointly with them only, but we had put our R&D teams from day 1 in this program. So this program, as of now and more than 99%, I am confident it is coming to us very soon. But yes, in future, if government decides and if private sector comes up to that level, definitely, there will be chances of getting different type of orders for them and may start with some missiles as told in some of public statements. And later on, migrate to complex systems also. If private sector comes up, it will be a real win-win over a period of time. I hope I have answered your question.
The next question is from the line of Umesh Raut from Nomura India Limited.
This is Umesh Raut here from Nomura. Congrats for a very strong operating performance in second quarter FY '27. My first question is pertaining to [indiscernible] given that the contract was now signed with the [indiscernible], how soon we can expect a subsystem level awarding for advanced sort of refer sensors and [indiscernible] for you? And whether that awarding will happen on a competitive route or a nomination base? And given that, I think now total ordering contract size has increased from about INR 38,000 crores to the INR 53,000 crore. Do we anticipate incremental changes in terms of ordering sizes for us?
Yes. So at least one good news was out of the 3 big programs, which I think last quarter, ConCall, we discussed the NGC [indiscernible], and QRSAM and all the 3 have some good states of well. So at least NGC is clear, and it was signed also by the parent PSUs, GSL and GRS. We are in touch with them. We already were in touch with them for items which BEL has to supply to both of them because those items, as it was told was developed over a period of time. And now it is technically called buyer nominated equipment, but it has gone through all the processes of multi-vendor and then capability and then functionality, adding not only based on the commonality, it was decided to become so-called B&E. So via nominated equipment is also a very, very long grant process. So in this project, yes, there are so many buyer nominated equipments. And those equipment, we had given already our B2 at that time to both the SPRs. But the formal order from them will now start formally that may take, let me tell you, 1 day to 6 months. That is a variation because there are different dividend line items. For different different line items, there will be different type of so-called negotiation or terms and condition finalization, et cetera. So I can't tell you exactly when I will have last order of NGC. But technically, it may start even tomorrow also the first order may come on tomorrow also, which is -- which will be very small value, but a small value to big value. Total I'm expecting within 6 months. Before the financial year closure, all these orders from both the shipyards will be there with us. So tentatively, we had, I think, indicated around INR 20,000 crores worth of order. We are sticking to the same value only. Based on our estimate, our discussions with these 2 shipyards, I think we may get order this tune only, around INR 20,000 crores to be worth of orders. We are expecting in a staggered way, but all of them, 99% will come in this financial year. As of now, it looks like there will be no slipping off 1 or 2 line items. But again, we hope that even for QRSAM also last year, we may get by much, but some slippages because of procedural terms, conditions, some discussion happens, et cetera, happen. So maybe 1 or 2 line item may slip. But as on today, it looks like all the line items of where you see we may get order before March. Understood, sir.
My second question is pertaining to execution growth. Given that we have mentioned in annual report that we will grow at about 15% to 20% in FY '27 at top line. And given we have achieved 26% growth in H1 FY '27, would there be any upgrade in guidance for FY '27 in terms of revenue and even the margin level?
No. Let me tell you, the thing is although the growth looks 20-plus percent overall until H1, but that is based on our strategy of making as much uniform our production as possible across quarters. You all may be knowing generally last quarter, we generally performed better. We not only we, in all other our partners, MSME partners, and other partner also, that January to March productivity a bit more than other quarters. But we are trying to correct it so that we give efforts and our supply chain part also give full efforts for each quarter by quarter. So definitely, we have done that type of efforts to see that our -- all the 4 quarters are more even. So because of that, it looks 25% and 26% looks very good. But overall, we are planning as of now, between 15% to 30% at more than 15% growth. That only we are expecting. If something more comes, it will be a positive surprise for us also. But as of now, we are planning that only.
Understood, sir. And sir, if you can give color beyond FY '27 as well in terms of execution growth, how one should look at especially given that QRSAM contract now got detailed by almost 7, 8 months vis-a-vis our early expectation. So do we anticipate early recognition from the program in anticipation of this program, have you started any work and so that we can reduce time line to recognize revenues and we can probably FY '28 itself some part of execution from QRSAM. So and color on execution beyond FY '27?
Definitely, generally, these types of discussions, we do in April concall because there, we will tell with more quantification about next 3 years, what is our projections. But yes, we review our yearly plans of next 3 years at every quarter also. But the more concrete data we have at that time. But anyway, once you have asked this question on QRSAM, let me tell you, we have started proactively, good work on QRSAM, QT and FOPM realization-related activities. Knowing the sensitivity of the program and geopolitical situation around. So we are confident that once we get the order, we will try to squeeze a few months definitely right. As of now, it looks like at least a few months, we will escalate ourselves. So a few months we may get. But overall, how much it will impact our yearly targets today, it may be too early to tell that. But definitely, we are very, very serious on this QRSAM program execution.
The next question is from the line of Dipen Vakil, Phillip Capital Limited.
Congratulations on great execution and margins. Sir, my first question is on the lines of your current order book. So can you help us with the breakup or so slightly detailed breakup of your order book project-wise?
Actually, again, as already told, we have around 300-plus projects in -- for execution. But only some major projects only, I will say ...
Top projects, which I tell you. Electronic pieces is about INR 4,200 crores. LCM-mark1 is INR 3,200 crores. [indiscernible] INR 2,900 crores. BMP-2 upgrade is INR 2,600 crores. [indiscernible]electronic RPA for [indiscernible], and on export order is there, which is for INR 1,700 crores. These are orders on 1st October.
Got it, sir. Sir, my second question is on the lines of order inflows. So in the first half, the order inflow has been roughly more than INR 7,000 crores. So how do you expect second half in terms of ordering to happen and which could be the major projects that you are expecting apart from QRSAM and [indiscernible] which could help us sustain our order inflow about, say, INR 20,000 crores to INR 25,000 crores?
Yes. Definitely, we are fully confident that our guidance we have given to you at year start, we are going to meet or exceed that and NGC has come anyway as a big project, but some 3, 4 more projects which are there in pipeline. [indiscernible] files have moved conservatively well. And we hope to get both the orders one by one before March. And MRL also, hopefully, we may get before March. So these 3 orders are confident to get. Some other orders are there, which are smaller value. But P75, I also, I am not sure right now whether it will also be cleared. So P75, maybe as for my guess work MGC was the first, second were QRSAM maybe P75. So maybe P75-I may slip to next year. I'm not fully sure. But if it comes in this year, it will be a diligent surprise for us also because we have -- again, there are also a lot of many line items are from BEL. But that is brief from my side.
So right now the major orders remains QRSAM, NGC, P75 maybe next year. And without that also, we are like we are looking at INR 1,500 crores to INR 2,000 crores order win?
Yes, yes, yes. So total INR 25,000 crores without QRSAM and with QRSAM INR 55,000 crores, which was our guidance, we are sticking to that.
The next question is from the line of Harshit Patel from Equitas Securities.
Just on the first question, just a bit of a clarification. This INR 20,000 crores that you mentioned for MDC, this would include MRSAM as well, right, or this is only the electronics portion?
The electronic portion is radar also. There is MFA, that is also part of this not the missile, the missile is excluded all the electronics and electronics wins communication equipment, EW equipment and Radar. So all put together the number which I have shared with you on INR 320,000-plus crores, we are expecting orders.
Understood, sir. Sir, secondly, on competitive building and the nomination share. I believe roughly 90% of the order book right now is on the nomination basis. but we have seen a lot of private players, including Adani Defense also getting active across radar, electronic warfare systems as well as missiles as you also mentioned, would you be able to tell us how much of the FY '28 and FY '29 pipeline, will be competitively? And how pricing and margins in those bids would compare with the nomination-based orders?
Let me tell you whether it is nomination or competition, more or less similar margins will be there, okay? In nomination, we don't get higher margins. So how we will win or how we win is based on uniqueness of our product and the indigenization content, which has developed over a period of time, in our technology. And that only differentiates us from others. And let me again tell you whatever nomination you see today, it was actually started with multi-vendor competition. and we became L1, then only when the product was good for the next ship or next order, they go for B&E, by nominated our nomination happens. So hardly any nomination on this domain has happened because of other reasons. So it was based on the capability developed over a period of time and indigenization and other benefits, which we passed on to our customer also because of that only, we are still retaining some of the focal nomination status. But definitely, the uniqueness is because of our and our indigenization. The unique solutions for their customized needs, which we have understood over a period of time. That definitely is a unique selling point for us. And with that, we will be competitive and we will have similar margins. Let me assure you.
The next question is from the line of Amit Anwani from PL Capital Limited.
So just one clarification. You said -- so currently, we have roughly about INR 8,000 crore inflow and this year based order, including [indiscernible] and HAM, we are expecting INR 20,000 crores, INR 25,000 crores. So this NGC INR 20,000 crores is over and above the base orders, which we are expecting? And will it be in phases?
No, no, no. NGC order was included in this INR 25,000 crores because in the start of the year, also we clearly told, including QRSAM, we will have INR 55,000 crores, excluding QRSAM, INR 25,000 crores. And in this INR 25,000 crores, yes, major portion will be NGC. As I told, if we get all of the NGC orders before March, then definitely, we will give a positive surprise to all of you. But as of now, we may -- that I told us 6 months. So from November, December, January, February, March, some order may slip to April also, That is our estimation. So if that is -- even then we are comfortable with our other orders in hand, we are definitely going to cross INR 25,000 crores. But if NGC, all the orders are converged before March, then definitely, we are going to cross INR 25,000 crores, excluding QRSAM. So that's why we are retaining our guidance and we are confident and we are putting all our efforts to convert on all these line items, including NGC different 8 to 10 line items. So we are confident, but a guidance point of view, we still want to stick to INR 25,000 crores and INR 55,000 crores only.
Right. So if this happens, then you'll be crossing by large margins if NGC orders come in the next 4 months?
Certainly.
And sir, in terms of time line, so what will be the time line for NGC for you, your execution? And also time line for the few large orders, which you highlighted, which are part of the order book, including the Fuses, NCA, BNP, that will be helpful.
Except fuse, fuse is only now remaining, I think, 6 to 7 years more. Remaining all orders are next 3 years, typically, 3, 3.5 years only. So all other orders, we are going to execute within that time. And NGC, also, I think it is around 4-plus years, which we will take to execute after getting this order. So depending upon the ship construction plan, actually. So it depends upon GRC and GSL. And I hope they are taking help of so many MSME and other vendors to speed up their so-called production and integration of all this Electronic Systems. So they may ask us to prepone. So in that case, we may have to supply next 3 to 4 years, but we are not finding any challenge in production of these line items, because these are line items are well in our production pipeline. So there are no surprises. So in case they want to prepone it, we can definitely execute it. But that all depends upon the next few months when we get the confirmed order. With that order only, we will know the exact delivery dates, what they have negotiated with their principal customer and how much they want to pass on to us time line. But hopefully, 3, 3.5 to 4 years is a maximum execution time line for my NGC orders.
All right. Second, sir, on drones. So there's been a lot of talks about very strong pipeline. So where are we in terms of -- I think you also talked about working towards contra drone systems. Just wanted to understand how Bharat Electronics is shaping up in terms of the drone-related products like [indiscernible] or counter drones. So if you could be on the drone side and any prospective pipeline we are looking on the drone?
Yes. As you rightly told, this is one of the big business growth area for any company, including BEL. So many other private sector companies, start-ups are there in this particular thing, but there is a scope for each one of us because type of drones requirement, you might have seen also in the recent conflicts how much and different, different type of drones are required, surveillance related drone [indiscernible], 1,000-plus kilometer drone, 2,000-plus kilometer drone. So those type of things are there, drone over drone, drone catching drone. So like that, there are hundreds of use cases, including logistic drones like that. So the hundreds of [indiscernible] are there. And in the market, there are very good so-called initial products, I should say. But those initial products have to convert into a reliable supply chain-based product with enough hardening. So BEL is working with a lot many start-ups as well as has its own in-house programs to see that we give reliable trust over the solutions, which can test the forward area jamming area type of environment also. So we are working very, very closely with the 6 to 8 start-ups right now. And they will come up with that [indiscernible] great technology, of course. But this type of a realization are making it more and more robust, we are doing, and we started bidding also. Few orders we have got this year also, but that orders are of the order of INR 50 crores, INR 100 crores type of things. So I am looking at some bigger orders in next 1 year, 2-year time frame of the order, which we can tell in investors call also. INR 50 crore, INR 100 crores of orders, we don't want to even discuss in the investors call, and you also may not be interested in those of things. But definitely, I hope next year, we may get at least 1 or 2 big orders in this based on our 6 to 8 big leads and big tie-ups, which we have done with the start-up community. So I'm confident this will yield us very, very good business in years to come. And same thing is about counter drone. Counter drone, luckily last 3 to 4 years, we have established ourselves as a reliable supplier of high-end counter-drone systems. So high end wins, which is having hard kill options also. In that hard kill option, now we are adding microwave DEW based on our own in-house efforts as well as our DRD efforts. So that we are adding. We have got very good leads for some of the foreign countries also. We have successfully demonstrated our counter drone solutions, which are quite, quite unique at world level also and very, very cost effective. So we are hopeful to get good export orders very soon because very good development. The very good trials were concluded. So we are hoping we may get a good counter drone solutions for exports. The overall drone and counter drone definitely is one of the most focused area after our missile, arms and ammunition, the second most focused area for us is drone and counter drone. And we may give you a very good pleasant surprise during [indiscernible], we may launch a few products at that time. Let me assure you.
The next question is from the line of Pinakin Parekh from HSBC Bank Limited.
My first question, again, going back to the QRSAM. So of that INR 30,000 crore order, sir, what will be the value in your estimate for the core missile manufacturing, which possibly could be opened up to private sector because BEL will not be manufacturing missiles, right? It will be manufacturing the systems around the missiles?
Yes, definitely, right now, we are not manufacturing big mills, but a few missiles, we have started manufacturing also, but not [indiscernible] tell you. QRSAM was developed by DRDO jointly with BDL. So this question, actually, you should refer to BDL that how they will take this challenge. But let -- based on the enable information and public domain, I think their QRSAM missile was not there. They have done some 4, 5 missiles names that these miles the IDO is opening up for private sector, which may take private sector also some time to absorb. But I don't think QRSAM missile was there in that list. But anyway, that question, you specifically asked to because as I told for us, [indiscernible] of system with large complex radars, communication system, interconnection of all these launches and missiles. So as of now, is the design partner for DRDO for QRSAM missile. In case DRDO changes their plan or something happens, I don't know as on today. So then that missile capabilities, if others will develop, -- it may be split it to them. But definitely at that time, BEL also will come and pitch in because BEL also has, over a period of time, acquired enough knowledge, enough infrastructure for the manufacturing missiles. And let me again assure you reasonably good infrastructure there even for QRSAM missiles, if government decides, we are capable of manufacturing QRSAM missiles also. But right now, our official LCM and [indiscernible], we are the DCPP partner for DRDO, and we expect some orders in future for these 2 missiles. And then there are some 3, 4 more missile programs, which are strategic in nature. So we are just involving ourselves with design agencies for those. But these 2 anyway had come to public domain also, where we are the formal DCPP partner. So definitely, we are putting missiles also as one of our focused area of development because missiles you may be knowing, actually, 60% to 70% of missiles is electronics. The cost of missiles, 60% to 70% goes in missiles electronics, remaining only goes into other 2 major components. So the biggest component, I should say, of missile is electronics. -- and where we have proved our strengths now, Okay?
Got it, sir. Just continuing with the QRSAM program. You mentioned in the beginning of the call that you do not see the private sector, at least in this first INR 30,000 crore order to be part of it, maybe going forward. So sir, do you see the QRSAM program or variance of this come through again and again over the next few years as India builds out its air defense system beyond what it is going to be an offer?
Definitely, yes. We told earlier also, this is a first order what where we are going to get will be the first order. Like our Akash System, you just see the history, the first order, I think, around 20 years back, roughly, we got -- and after that, we are going to get multiple cities orders. We already got some 3, 4 series and 2, 3 more are there. Because with every 3 to 4 years or 5 years, some technology refresh happens, some extra announcement happens for the same technology. And there will be -- based on the political and geopolitical -- sorry, geopolitical situations. There will be requirements for strengthening more and more. And you all have seen the recent conflicts, the two hot things in the market, which are required by everybody in the world is drone/counter-drone and missiles. So for these 2 markets, definitely very, very big markets are there for these 2 segments. And we are also working seriously to capture as much as we can in these 2 domains.
The next question is from the line of Subramaniam Yadav from SBI Life Insurance.
Sir, if you can update us on the [indiscernible] project, I believe the big submission gate was in terms of October. So if you can give us some color on that?
Yes. Why not [indiscernible] is one of the prestigious project for us. And as we have told earlier also, we have done a bid jointly with L&T, being front ending and we are giving them full support in a 50%, 50% consortium basis. We have already submitted a bit? And as per our internal estimate, it is very, very competitive. So we are hopeful to be L1 after technical evaluation and then the bid will be open, and we are hopeful we'll be land that way, we will jointly with team is a private sector, it will be a really good model of public private partnership we are really working for this program and many more future programs. [indiscernible] also are now aligned our risk to this type of public private partnership. You can ask L&T how their experience is in their investors call. I don't have any issue. But our experience of working with L&T is really great and very, very accommodative, both sides sat together multiple times. And I hope we have given a very, very optimum solution or optimum bid to the agencies, and we are confident we are going to win.
So can we expect the outcome of these?
Can you repeat?
When can we expect the outcome from this?
Again, it is a guesswork only because that is the other side, the DRDO has to decide on that. Because as you know, ADAs the agency who had floated this RFP for selecting one of the partners. Typically, again, it is my guess. It may take 2 to 3 months of technical evaluation because it's still -- we have given a lot of detailed technical details for us than we have given all 3 of us different consortium. So because it is a big project, so 2 to 3 months of technical evaluations. And then they may open the price bid. Hopefully, before March and we may get a positive surprise.
The next question is from the line of Jyoti Gupta from Ashika Institutional Equities Limited.
I have a couple of questions. One, that following the approval of 8 next-generation cohorts, how much of the estimated INR 70,000 crores to INR 75,000 crore program opportunity could actually accrue to be combat management systems, radar, electronic warfare suits and communication equipment? When should we expect the [indiscernible] to materialize? And what would be the likely time line? Second is what -- we know that there are a lot of work which is happening in terms of fixed [indiscernible] so what is BEL's role in the Indian Air Force high altitude so satellite program, particularly in communications, surveillance poles because it looks like this is going to be the most important technology in the future. My third question is that in small platforms or contracts that we have received, specifically on the low-level light weighted order, which is INR 770 crores from the Army, does this radar have additional export potential? And could the program lead to follow-on orders for deployment across additional army formations? And last, the INR 1,251 crores ground-based mobile linsystem with the well secured from the Indian Army game, is this a stand-alone deployment or part of a larger network electronic intelligence program? And could there be additional order for similar systems?
Yes. Although you were supposed to ask only 2 questions, but anyway -- but other my objective. Your first question actually is a repeat question, I should say. I had answered it that NGC different different line items, you also mentioned all items beautifully. So it may take 1 day to 6 months. Other time, I can't tell right now because we are in discussion with both the GSL and GRSE. And some similar discussion we already had done in March itself. Actually, in the month of March, we thought we may get order. So quite good on work is done. Based on that only, I'm telling it may take 1 day to 6 months of different different line items to convert into confirm the PO on us. Now second question about HEPS. Yes, HEPS is a very good program. Multiple usage will be there. But as per my understanding, it is still maturing. It is not a mature solution, it is maturing. So when it is maturing, and there are multiple technologies. One is even the DRDO developing. One is even a CSI lab is developing, then there are some Indian companies also are there in the race who claimed that they have this capability, but we are closely watching all of them, let me tell you. Because I feel still -- we don't have matured products. This is our assessment. Maybe we are wrong but our assessment is still maturing. So we are careful in selecting a right partner so that my development risks are minimal and my winning probability is more in that program. So we are in that process of selecting a right partner for HEPS. Okay. Regarding the [indiscernible] project. That project we are going to execute quickly only. This is technically -- there was similar order earlier also. So based on that experience all we are confident we can execute this. We strategically don't disclose whether we are going to export any product by name until we get the order. So my side, no comments about whether this radar I can export or not. Okay. I hope you understand that. Same thing about GBMES for Army, we have got the order, a very good order. It is very much strategically required. But again, it's deployment is kept confidential as in this type of [indiscernible] but let me tell you the products which we give are generally very agile can make different type of Terren or other requirements. And always nowadays, we are giving solutions which are network cable. That is our basic thing. Like every product should have an AI and every product should have a networkable feature. It can be that system. -- these which are I think for last 5 years [indiscernible] programs we are developing at least these features are there in any program because without this today's war scenario, nobody would like our equipment to be [indiscernible] -- so these 2 features are always there in our thing. How it will be exploited or not exploited will be depending upon end user and that it will be definitely a strategic answer, which finally end user only keeps with them. They will want to disclose to us also. How they are effectively using in operation depends upon them. We don't dictate or we can't want to control that. Let me assure you. [indiscernible] On all 4 questions.
2's I just want to ask, could there be an additional order for this because right now...
[indiscernible] all EW also, actually EW related projects you might be seeing now very, very increased requirement because overall, the environment, EW also is very, very hostile. And [indiscernible] changed so much in the last 5 years also. You might have been 3G, 4G, 4G to 5G, 5G to 6, that is only about communications. Same thing is in Radars technology is changing so fast. And as for Radar and communication systems, an mainly. Okay. So once that technology has changed, requirement of these type of EW systems is ever increasing now.
I just want to know, are these agile in hostile like technologies, agile enough to interpret or let's say withstand the changing hostile environment. Or does it like it is a stand-alone or the [Foreign Language]
Again, you are asking a strategic question which I will answer projects, but I will again tell you, in general, all projects which we are supplying. In general, they are highly agile, highly networkable and highly deployable in different, different areas.
The next question is from the line of Ajinkya Jadhav from Crush Portfolio.
My first question is regarding MMO that BEL has signed with [indiscernible] and BMS for advance ring and control system for a heavily combat vehicle. So what status on this program? And has it moved from the development stage to the [indiscernible]
This was a very, very challenging futuristic project, let me tell you. developing this type of a critical technology, where our position was mainly electronics. Midhani portion was mainly materials and [indiscernible] portion was mainly the basic so-called engine control. So we had on our first level study and found that we are capable of developing this as a technology. But this technology requires much more larger investments. And that investments are possible with some investment from our side and some in the form of grants. So we are just sitting together all the 3 companies and how to fund this project, because when the large investments are there, although technology has to be developed, but we are looking at some technology development funds or some other funds from government of India for developing this critical technologies. Right now, it is in that phase of fining but technology understanding, complexity and what type of investments are required, that homework jointly, we have completed.
Got it. And my second question is regarding the in the generation of the metals that we require. So are there any special alloys or steel that we still import that can be indigenized with the help of [indiscernible], the local players? So is there any scope we can increase the percentage of indigenization with help of local players for the RM equipment part?
Understood. Understood your point. But again, this point is more related to AI and other companies, even shipyards because they actually use these materials much more -- for us, electronic material is more important than the so-called mechanical materials like steel or alloys, et cetera. Hardly in our product, 1%-odd percent is the material cost of these type of things, because ours is mainly electronics. So -- but what's our small requirements which we have always it is shared with Midhani and most of this is shared on the [indiscernible] portal also so that indigenization can be for that. But because our volumes are not much. So I don't know whether what priority private sector is doing for that. But as such, this is not very, very critical. For electronic system, this mechanical subsystems are not that critical, there are multiple alternates available for us. But like for [indiscernible] engine material requirements are much, much tougher than local my electronic packaging material. For me, mechanical items are more of packaging or system-in related role they play. But in an engine or in an aircraft design, their role is 10x more. So the challenges for this material indigenization right now is a shift for us is electronics materialization. And remaining, we have left to Midhani and private sector through [indiscernible] portal.
Got it. And one more, if I can, is on the NDC, what will be the new suit of a sensor versus the earlier core that we will be supplying in terms of [indiscernible], if you can throw some light on that? -- new so that we will be sitting in.
Let me tell you for every new program, some delta changes always happen as technology is in electronics defense, electronics technology changes so fast, that some delta changes will be there. So product name looks the same for you. But within that, there is a technological upgradation or some extra value addition, which keeps being done. So we can't say it was the previous order, same only we are manufacturing? No. There are some delta changes based on the requirements and that is our continual activity. So -- and all type of AW sensors, radar sensors, the communication equipment are there as part of every ship. Here also, it is there. So type of equipment look same. But technology-wise, there is continual upgradation from program to program.
The next question is from the line of Mohit Pandey from Citi Research Limited.
The first question is on QRSAM. Sir, given there has been a delay, is it possible that the actual size of the order could be greater than INR 30,000 crores because I understand the INR 30,000 crore number was first spoken more than a year back and costs have increased in the interim. Is that -- how it may play out?
Generally, we also wish like that, that they gave us escalations after the conclusion of price. But typically, as a government process, 1 year, one and have escalations they don't give until because of various regions, the project delays too much. and we have to absorb that. So mostly, we may not get any escalation, maybe barring if we are lucky, maybe some 6 months aspiration is there. Clear, very good. That will be a positive news for you and me. But as of now, I'm expecting INR 30,000 crore order to come to us.
Understood, sir. Sir, second question is around the missiles that you mentioned earlier in the call. So I understand you are having an old MOU with Tamilnadu Industrial [indiscernible] and MIL as well. So are there enter into [indiscernible] &A share or exposes also for the missile?
Yes, yes. We have formally declared ourselves as it is coming in our annual report also. The Tamil Nadu Explosives Limited is now owned by BEL For the next 30 years, at least it is there with well. So we have already done good investment there. And some of the missile integration activity we have started there also. So -- and definitely, we have a very good understanding with MIL also, of course, so that some of the support for ammunition because in Tamil Nadu Explosives Limited, we have only a hot integration facility, not the ammunition. We are having integration capabilities right now. Ammunition making facility, we don't have as of now. And for that, we are depending on MIL and solar and for many other companies have come up now, 2, 3 more companies have come up in private sector also. -- who can give ammunition to us, and we are having a very good understanding with a few of them. So emission per se, we are right now not there. But if strategically it is required and business demands are there. we can develop that expertise because reasonably, we have some knowledge on that also. But as of now, our main focus is hot integration, ammunition integrating within missiles. That is all is great technology and a lot of safety and other security features and infrastructure is required for it. So presently, we are more focusing on that instead of developing ammunition perfect.
Understood, sir. And sir, last question is on the execution. 26% revenue growth despite a tough base. Any particular reason that has led to such a fast execution despite the order book being order backlog being down Y-o-Y yes, that would be the last question there.
Okay. Then in order book, we are not worried of now because as we have INR 68 crores plus INR 1,000 crores, we are having and hopefully INR 55 plus INR 1,000 crores, we are going to get before year-end. So our book, we wanted to execute as much as we can. And let me tell you some of the -- we have now started our on-time delivery score. We are improving a lot. And [indiscernible], we had committed to our own users we are prefunding by another 1 month, 2 months type of thing. And that's why you have seen this thing. And secondly, which I told earlier, we wanted to correct ourselves to give more uniform output across each quarter. So that correction also we wanted to do instead of loading ourselves in the last quarter and then having suspenses for all of you also, we wanted to make it more uniform -- so it is more of a correction of that as well as our fast execution speed. We don't want to delay now. What our delivery commitments are there. We wanted to extend 1 or 2 months this side only. We don't want to go to other side and we are putting all our efforts to see that our execution track record closes to 100% as early as possible.
The next question is from the line of Atul Tiwari from JP Morgan.
Just one very quick question. I don't know whether it has been discussed. QRSAM obviously has been delayed multi-times now. any color on what has caused the delay? And are we still on track to get it over the next couple of months before this financial project?
No, delay is not that much we were optimistic last year we told if we are highly optimistic that we may get by March. But we know in the month of January, February is the type of complexity of the documents itself. -- which is very huge, it may be lower. But at CMD, I was optimistic and as I'm always. But the thing is, internally, we also know it may minimum August, September only. So it has not slipped that much. But yes, I was expecting in the NDC order, we may get QRSAM also. Anyway, when big big orders are there, it takes its own time for the decision makers also. So they have to fit together for each project one by one. So, we are hopeful in next 3 years, we may get positive price. So we are not alarmed by the delays right now. And anyway, as I told, we are compensating some of the delay by doing some advanced action for the FOPM realization, for which we have done some good proactive investments related to QT and related to realizing this with our supply chain partners also. Actually, let me tell you, in this particular project, we have got very, very good support from our supply chain partners. Whether they are from public sector or whether they are from private sectors, whether they are big private sell like or a small MSME vendor. They all are investing on their side itself so that the FOPM realization, the first of production model realization is done ahead of time. So that is a very, very good news for all of us that yes, in this program, so it is, again, a good model of a public-private partnership where in this -- the private sector, maybe around 200-plus MSME partners will be there. And roughly around 70% of the orders which we are getting will be distributed across this 200-plus MSM partners. And right now, they have done reasonably good investment from their side also. So based on this good ecosystem and good confidence they have on all of us, I am hopeful that this few months delay in acquiring order will not translate into execution. The execution we will be even faster than the expectations of users.
The next question is from the line of Sahil Karia from Wideband Investment Management.
Could you just give us some color on the rope order that is going to come like what are the time lines and for amount of what are you expecting?
Yes. Again, this order we have got as a development order only right now. Production orders will take time because I think overall sanctions proving a radar in an aircraft is really a good challenge, let me tell you. And that challenge is not only for Indian companies like HL or LRD, it is equally applicable for even foreign companies also. So toughest, let me tell you, because I'm also R&D engineer. [indiscernible] airborne platform from qualification of any technology. And Radar, which is a very, very, very critical sensor for airborne platform of 30 or LCA type, it takes its own time. So right now, we are just executing that development order and giving our AAA to LRD. And then integration and other things will be done by them. So overall time lines are being decided by LRD for this program. And we are confident maybe around '28, '29, we may get production orders for this radar.
And the next question is on the midsize [indiscernible] that we manufacture and develop. So could you just give us the list of all the missiles for [indiscernible] are being supplied by BEL because I believe for some key messages like Brammo and all, BEL doesn't supply the [indiscernible] -- and also for the ATGMs that we manufacture indigenously in India. So could you just give us some color on that? And what is the quantum of orders that we can expect going forward?
Yes. [indiscernible] are of 2 types, mainly. One is RF and one is IR. So we are in IR and RF both type of seekers, let me tell you. But as you had observed, right, that we are not there till date in [indiscernible] figure. We are there in some other missile seeker programs like Akash, Astra and others, but not promos but we know the technology for [indiscernible] also. So proactively, we had started developing that figure also. Because they are different band different sizes, different specs are there for each and every seeker program. So -- but we have now capability to develop ourselves the seekers because you may be knowing genseekers were actually designed by -- they were our guru. But system engineering and some of the critical components in bids mode was developed by BEL. But over a period of time, we have developed good confidence to have these type of see end-to-end by us. So we are doing. If I'm not wrong, ATMs, typically have IRCs. So IR beakers are again used for various applications. And we have very good strength in designing IR figure, although, of course, our first hire peakers are again from DRDO, but we are developing strength for developing our own IRC [indiscernible] also. And we have a very good manufacturing setup for these IR [indiscernible] at our new factory in [indiscernible]. So there, we have created a very good state of that I-4.0 compliant infrastructure for these IR tickers manufacturing. So overall, we are increasing our role for different type of missile programs, the both type of seekers, the DRDO design they are designed and upgraded and our own design. All these 3 things, we are there. And let me tell you seekers also mostly in many of the missile programs have 20% to 30% of the cost of the missile is actually see, very, very critical, most costly component. So we are having a high business volume. You may be knowing for missiles and drones, as I told use requirements are there in India and even abroad also. And each missile nowadays will have seeker. So [indiscernible] also, if you have missile business, if you estimate typically 2, 2.3x will be the seeker business within that. That was only I can tell you.
So just to follow up on that. So like what could be our capacity of [indiscernible] like how many [indiscernible] can we manufacture at our facilities in a year? If you could just give us a ...
Combined IR and RF 1,000-plus we can make easily right now. And if need arises, we can scale it up, if required, to 2 to 3x more because the knowing seekers are like an RF [indiscernible] like Radar, Seker is like my IR camera. Technically, technology is more or less similar. So we have a good technological understanding of the subject. And because we have a large infrastructure for Radar and for IR-based sensors, which can be converted very quickly to the [indiscernible] requirement. So as such, infrastructure-wise, we are not having any bottleneck for both type of seekers program. But as and when need arises for scaling up, we are ready for that. We don't see any challenge, but [indiscernible] combined the strength of 1,000-plus we definitely have.
Okay, sir. Okay. And just if I could squeak one more question. Like do we expect any good amount of orders in the EOIR segment for the drones and as well as like for the direct energy bases that we are developing.
Yes. [indiscernible] also is always a very strategic and good technology to be there. And we have developed over a period of time, a very good stance for IR. As I told no, these are required for seekers. It is required for cameras, it is required for drones. It is required for multiple places. So we have various programs how to increase our presence in this EOIR segment, critical technologies in our control, except detectors. The basic detector still is not totally in our control, which jointly with -- do we are working. Very good progress has been done for the basic detector. But barring the detector, all other subsystems, signal processing, optics, we have very, very good strength. So we can make multiple type of solutions based on this so-called critical technological components. So I don't see any challenge in that. But yes, a detector there are challenges, which we are overcoming jointly with DRDO.
Answer on the BAW reasons, like Rent IFB like HPM high high-power microwave appends or ethereal which type of an [indiscernible] for the directing?
Both. Both type of weapons we are developing microwave as well as laser was laser the regional technologies from DRDO and microwave also, right now the technology is from RAD-only -- but we are exploring other options, including our own in-house options for developing different type of DW weapons. because, again, it is a changing field. Every 6 months, some new technology comes. So we thought, although we are supporting our DRDO friends very well but why not develop some in-house strengths also. So some of the proactive R&Ds we have taken both the domains with our own in-house teams as well as we have seen some of the good startups also have come up in these 2 leased technology domain. So we are working jointly with them also. So we have all the 3 approaches, and we are confident that some good solutions we will immediately offer to our customers other than what we have already offered to them.
Why don't we take up the last question, please?
The next question is from the line of Umesh Raut from Nomura India Limited.
Sir, my question is pertaining to more of a strategy that probably the Indian Forces can adopt, given that probably in future or currently as well, we are seeing multiple cybersecurity set and other sectors. We have supplied very large installed base of defense electronics products historically to all [indiscernible]. So how do you see this opportunity in medium to longer term kind of planning for BEL? And at the same time, probably if you can also give us color on possible upgradation of ICC system that Indian Air Force is looking for and expansion of IS further notes as well?
You told, you will ask one question, but actually I asked 3 questions. And I will try to answer as much as possible because it is the last question. Cybersecurity, as you have rightly told, it is need of the hour. But as the technology, we understood this at least 25 years back. And we opened a basic research on cybersecurity at our central research liability 25 years back. we have created group, and they started developing leach technology, which are underlying ology for this domain. Today, also C4I solutions, which are in field. The cybersecurity component of that is developed in-house by bell. Let me assure you that. But there is a good, good requirement of the cybersecurity solutions for nondefense also. So defense, let me tell, we have very good solutions, which are already in place. But nondefense because the technology is changing because the networks are evolving for nondefense critical infrastructure, so many. So there now, we are focusing as an extra focus or as an extra business opportunity. And that's why we created this new SBU itself, network and cybersecurity as a separate SV in our Bangalore complex, some 2 years back, now 2.5 years back. And they started giving very good results in so-called civilian domain also cyber curity related things. We have got good orders. I think right now, also, we are executing something like INR 400 crores to INR 500 crores worth of orders in the cybersecurity domain. And opportunities are good leads, which may convert into a good business of thousands of crores is in the pipeline. So we know the importance of cybersecurity power civilian domain. And defense domain it doesn't go as a line item, but it goes as an inbuilt package for our C4I solution as part of our Tipsolution. So we are definitely in that domain. And definitely, there is a good growth projects for that. ISCS next version, I want to wide the answer because it is strategic in nature. That's why -- but let me tell you what sure our users are expecting for future ISCS, we have developed those critical technologies already. I hope I have answered.
As there are no further questions from the participants, I now hand the conference over to the management for closing comments.
Yes. Our closing comment is the same as our starting comments of the year. We are going to meet our guidance given at the start of the year, we're working for that revenue growth of 15-plus percent although there may be some positive surprises as you have predicted. But right now, we are confident we will have 15% plus EBITDA margins of around 28%. The order inflow of INR 25,000 crores minimum excluding QRSAM and including QRSAM INR 50,000-plus crores. R&D investment of INR 2,200 crores, CapEx of around INR 1,200 crores and Defense to Nondefense business, typically [ 90 to 10 ]. So we are going to make this guidance which was given. We are confident to meet that guidance. Thank you from my side and my team of Director Finance and our Company Secretary.
Thank you. On behalf of ICICI Securities Limited, that concludes this conference. Thank you for joining us, and you may now disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Bharat Electronics Limited transcript - plus 261,000+ transcripts from 13,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Bharat Electronics Limited earnings transcripts and 261,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $145 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.