Bharat Electronics Limited (500049) Earnings Call Transcript

November 3, 2026

BSE Limited IN Industrials Aerospace and Defense earnings 70 min

Earnings Call Speaker Segments

Operator operator
#1

Good day, ladies and gentlemen, and welcome to the BEL Q2 FY '27 Earnings Conference Call, which ICICI Securities Limited is hosting. <<operator_script>> Please be aware that this conference is being recorded. At this point, I hand the conference over to Mr. Vikash Singh. Thank you, and over to you, sir.

Vikash Singh analyst
#2

Thanks very much, and good evening to all of you. It's a real pleasure to welcome everyone to this call covering Bharat Electronics' Q2 FY '27 results. ICICI Securities is grateful to the management team for letting us host them today. Joining us from the management are Mr. Manoj Jain, Chairman and Managing Director; Mr. Damodar Bhattad, Director, Finance and CFO; and Mr. S. Sreenivas, Company Secretary. So, without spending too much time, I'll pass things over to Manoj sir for his opening remarks. The floor is yours, sir.

Manoj Jain executive
#3

Thank you. Let me give you a quick rundown of our financial highlights for H1 — that's Q1 and Q2 combined — for the year '26, '27. Revenue from operations rose to INR 12,824 crores through Q2, compared with INR 1,180 crores, a growth of 25.97%. Profit before tax also climbed to INR 3,467 crores through Q2 versus INR 3,023 crores, reflecting growth of 14.6%. Profit after tax increased to INR 2,589 crores through Q2 against INR 2,255 crores in the prior year over the same period, a growth of 14.80%. EBITDA through Q2 stands at 27.43%. Earnings per share rose to INR 3.54 through Q2, compared with INR 3.09. As of 110-2026, our order book position is INR 16,717 crores, and orders acquired so far in this financial year up to 110-2026 in total INR 7,334 crore. So that's a brief look at the financial highlights for H1, covering Q1 and Q2 together. That's my brief update.

Operator operator
#4

We'll take our first question from Amit Dixit at Goldman Sachs.

Amit Dixit analyst
#5

To start with, nice work on a really strong set of numbers. I have two questions, sir. The first is about timing — could you say when we might expect that order to come through? Also, on a recent earnings call, one company noted that QRSAM could potentially be given to private firms. So do you have any view on whether our share — the roughly INR 250 billion we've been citing — might shrink as a result? That's my first question, sir.

Manoj Jain executive
#6

Right, so QRSAM, as you're aware, was a joint development effort between BEL and DRDO — DRDO being the nominated production agency — and we put in investment during the design phase as well. A great deal of learning has accumulated over the last 10-plus years. It began, I believe, roughly in 2014. After that, we submitted our bid on the basis of the <<inaudible>> issued to us. So given that, and drawing on our own inputs too, we anticipate receiving the order quite soon. Hopefully, at the next CCS, things will become clearer — they're clearing all the major projects one at a time. So we may receive this order very, very soon — in full. Regarding the private company <<inaudible>>, I think that was largely down to a statement made somewhere that all missile orders would now be open to the private sector as well. But QRSAM isn't just a missile. It's actually a complex missile system, in which the missile forms only one part of the overall project — it is a complete area defense system. It's an air defense system made up of various kinds of radars, launchers, communication systems, the interconnection among these, and linking all of it to the backbone. So on the whole, I would describe it as a complex system of systems, and the expertise for it has been built up by BEL over a period of time, as things stand now.

Manoj Jain executive
#7

At this point, I don't believe that private-sector arrangement is feasible—technically it may not be, and the reason is that it takes 10 to 12 years of accumulated experience with this kind of complex system of systems, which we have built up over time. Naturally, DRDO is our guru, and it is only jointly with them, but we placed our R&D teams in this program from day 1. So as things stand now, more than 99%, I am confident this program is coming to us very soon. But yes, in the future, if the government decides and if the private sector rises to that level, there will definitely be opportunities for them to receive different types of orders, and it may begin with some missiles, as mentioned in some public statements. And afterward, move on to complex systems as well. If the private sector comes up, it will truly be a win-win over a period of time. I hope I have answered your question.

Operator operator
#8

Umesh Raut from Nomura India Limited has the next question on the line.

Umesh Raut analyst
#9

Umesh Raut from Nomura speaking. Congratulations on the very strong operating performance you delivered in the second quarter of FY '27. My first question relates to <<inaudible>>, given that the contract has now been signed with the <<inaudible>>: how soon can we expect a subsystem-level award for advanced types of refer sensors and <<inaudible>> in your case? Also, will that award come through a competitive route or on a nomination basis? And on that point, I believe the total ordering contract size has now grown to INR 53,000 crore from roughly INR 38,000 crores. Do we expect any incremental changes when it comes to ordering sizes for us?

Manoj Jain executive
#10

Yes. So at least one bit of encouraging news came from the 3 big programs — I believe during last quarter's ConCall we talked about the NGC <<inaudible>> and QRSAM, and all 3 are in some good shape. So at least NGC is settled, and it was also signed by the parent PSUs, GSL and GRS. We are in contact with them. We were already in touch with them regarding the items BEL has to supply to both of them, because those items, as was stated, were developed over a period of time. And now, technically, it is called buyer nominated equipment, but it has been through all the processes — multi-vendor, then capability, then functionality — and adding not only on the basis of commonality, it was decided to become what is called B&E. So via nominated equipment is also a very, very lengthy approval process. So in this project, yes, there are so many buyer nominated equipments. And for those equipment, we had already given our B2 at that time to both the SPRs. But the formal order from them will now begin formally — that may take, let me tell you, 1 day to 6 months. That is a variation because there are different dividend line items.

Manoj Jain executive
#11

Depending on which line item you look at, the kind of negotiation involved and how terms and conditions get finalized will differ. So I can’t give you an exact date for when we’ll receive the last order for NGC. That said, technically it could begin as early as tomorrow — the first order might even arrive tomorrow, and it would be quite small in value, though we move from small value up to big value. In total, I expect everything within 6 months. Before the financial year closes, we should have all these orders from both shipyards with us. Tentatively, I think we had indicated roughly INR 20,000 crores worth of orders. We’re holding to that same figure. Going by our estimate and our talks with these 2 shipyards, I think the orders we get may land at that same level — approximately INR 20,000 crores in value. We expect them in a staggered way, but 99% of them will come within this financial year. Right now, it appears there won’t be any slipping of 1 or 2 line items. Still, we hope that — even for QRSAM last year, we thought we might get it much sooner — some slippage occurs because of procedural terms, conditions, and various discussions that come up.

Manoj Jain executive
#12

So perhaps 1 or 2 line items could slip. But as of today, it appears that for all the line items where you see we might receive the order before March. Understood, sir.

Umesh Raut analyst
#13

Moving to my second question, it's about execution growth. Since our annual report states that top line will expand roughly 15% to 20% in FY '27, and considering we delivered 26% growth in H1 FY '27, might there be any upward revision to the FY '27 guidance on revenue as well as on the margin level?

Manoj Jain executive
#14

No. Let me explain — the thing is, even though growth appears to be over 20% overall through H1, that stems from our approach of keeping production as even as we can across quarters. You probably know that in the last quarter we usually did better. Not just us — all our other partners, the MSME partners, and other partners too — productivity from January through March tends to run a bit higher than in other quarters. But we're working to fix that, so that our efforts and our supply chain side also put in full effort quarter by quarter. So yes, we've made those kinds of efforts to make all 4 quarters more even. Because of that, 25% and 26% look very good. But overall, as of now, we're planning for between 15% and 30%, a growth of more than 15%. That's what we're expecting. If something more comes, it'll be a positive surprise for us as well. But as of now, that's what we're planning for.

Umesh Raut analyst
#15

Noted, sir. And sir, if you could also provide some color past FY '27 regarding execution growth — how should one view it, especially since the QRSAM contract has now been detailed by roughly 7, 8 months compared with what we initially expected? So do we expect early recognition from this program, and in anticipation of it, has any work begun so that we can shorten the timeline for recognizing revenues and perhaps see some portion of QRSAM execution already in FY '28 itself? And color on execution beyond FY '27?

Manoj Jain executive
#16

Sure — so normally, we hold these kinds of discussions during the April concall, since that's when we'll be able to give you more quantified detail on the next 3 years and what our projections look like. That said, we do go over our yearly plans for the next 3 years every quarter as well. It's just that we have more concrete data at that point. In any case, since you've raised the question about QRSAM, let me say this: we've already begun proactively doing solid work on QRSAM, QT, and FOPM realization-related activities. Given how sensitive the program is and the geopolitical situation around it, we're confident that once the order comes in, we'll definitely try to squeeze out a few months. As things stand now, it looks like we'll be able to pull ourselves forward by at least a few months. So a few months we may gain. But how much that will ultimately affect our yearly targets — today, it may be too early to say. Still, we are very, very serious about executing the QRSAM program.

Operator operator
#17

Our following question comes from Dipen Vakil at Phillip Capital Limited.

Dipen Vakil analyst
#18

Nice work on the execution and the margins. Sir, my first question concerns your present order book. Could you give us a breakdown — perhaps a somewhat more detailed project-by-project split of that order book?

Manoj Jain executive
#19

As I mentioned earlier, we actually have roughly 300-plus projects for execution. But I'll just say only a few major projects ...

Executive executive
#20

The top projects, as I mentioned to you, are these. Electronic pieces comes to roughly INR 4,200 crores. LCM-mark1 stands at INR 3,200 crores. <<inaudible>> is INR 2,900 crores. The BMP-2 upgrade amounts to INR 2,600 crores. <<inaudible>> electronic RPA for <<inaudible>>, and there's also an export order, which is worth INR 1,700 crores. Those are the orders as of 1st October.

Dipen Vakil analyst
#21

Understood, sir. Sir, my second question relates to order inflows. During the first half, order inflow came in at roughly over INR 7,000 crores. So, how do you see the second half playing out where ordering is concerned, and besides QRSAM and <<inaudible>>, which major projects are you expecting that could help us keep order inflow at around, say, INR 20,000 crores to INR 25,000 crores?

Manoj Jain executive
#22

Yes. Absolutely, we have complete confidence that the guidance we provided at the start of the year will be met or exceeded, and NGC has anyway arrived as a major project, but there are some 3, 4 additional projects sitting in the pipeline. The <<inaudible>> files have progressed conservatively well. And we are hoping to receive both of those orders, one by one, before March. And MRL as well, hopefully we may secure it before March. So we are confident of getting these 3 orders. There are some other orders too, which carry smaller value. But regarding P75, right now I am not sure whether it will also be cleared. So P75, perhaps just as my guess work, MGC came first, QRSAM was second, maybe P75 after that. So P75-I may slip into next year. I am not entirely sure. But should it come within this year, it would be a pleasant surprise for us as well, because we have -- again, many line items there are also from BEL. But that is my brief update.

Dipen Vakil analyst
#23

At present, the main orders still consist of QRSAM, NGC, and P75, the last perhaps coming next year. And even leaving that aside, are we looking at order wins somewhere between INR 1,500 crores and INR 2,000 crores?

Manoj Jain executive
#24

Yes, that's right. So INR 25,000 crores in total excluding QRSAM, and including QRSAM, INR 55,000 crores, which was the guidance we gave — we're standing by that.

Operator operator
#25

Moving on, our next question comes from Harshit Patel at Equitas Securities.

Harshit Patel analyst
#26

To clarify that first question a little: the INR 20,000 crores you cited for MDC — does that figure also take in MRSAM, or does it cover just the electronics portion?

Manoj Jain executive
#27

Radar also falls under the electronic side. MFA is included there as well — though not the missile itself; the missile is excluded, while all the electronics are in, electronics wins covers communication equipment, EW equipment and radar. So taking everything together, the figure I've already given you of more than INR 320,000 crores is what we expect in orders.

Harshit Patel analyst
#28

Got it, sir. Sir, the second thing — competitive building and the nomination share. My understanding is that around 90% of the order book at present sits on a nomination basis. However, we've observed a significant number of private players, Adani Defense included, becoming quite active in radar, electronic warfare systems and missiles too, as you pointed out. Could you tell us what portion of the FY '28 and FY '29 pipeline will come through competitive routes? And in those bids, how would pricing and margins stack up against orders awarded on nomination?

Manoj Jain executive
#29

Let me address whether it's nomination or competition — the margins will be more or less similar either way, okay? With nomination, we don't earn higher margins. So the way we win, or how we do win, comes down to how unique our product is and the indigenization content that has been built up over a period of time in our technology. That is the one thing that sets us apart from the rest. And let me repeat: whatever nomination you see today actually began as a multi-vendor competition, and we became L1, and only then, when the product proved good for the next ship or the next order, do they go for B&E, and our nomination happens through that route. So hardly any nomination in this domain has come about for other reasons. So it rested on the capability built up over a period of time plus indigenization and the other benefits, which we passed on to our customer as well — and because of that only, we still retain some of the focal nomination status. But definitely, the uniqueness stems from ours and our indigenization. The unique solutions for their customized needs, which we have come to understand over a period of time. That definitely is a unique selling point for us. And with that, we will be competitive and we will have similar margins.

Manoj Jain executive
#30

I want to make one thing clear to everyone.

Operator operator
#31

Our following question comes from Amit Anwani at PL Capital Limited.

Amit Anwani analyst
#32

Just to clarify one thing. You mentioned that right now we have an inflow of roughly about INR 8,000 crore, and for this year, based on orders — including <<inaudible>> and HAM — we're expecting INR 20,000 crores, INR 25,000 crores. So is this NGC INR 20,000 crores on top of the base orders that we're expecting? And will it come in phases?

Manoj Jain executive
#33

No, no, no — the NGC order was part of that INR 25,000 crores. At the beginning of the year we said this clearly as well: with QRSAM included we'd have INR 55,000 crores, and without QRSAM, INR 25,000 crores. And within that INR 25,000 crores, yes, the bulk of it will be NGC. As I mentioned, if every NGC order comes in before March, then we will certainly deliver a positive surprise to all of you. But right now, we may — as I said, 6 months. So from November, December, January, February, March, a few orders might slip into April as well; that's our estimate. So even if that happens, we're comfortable with the other orders we hold, and we will definitely exceed INR 25,000 crores. But if all the NGC orders are converged before March, then we will definitely go past INR 25,000 crores, excluding QRSAM. That's the reason we're retaining our guidance, we're confident, and we're putting in every effort to convert all these line items, including the different 8 to 10 NGC line items. So we're confident, but from a guidance standpoint, we still want to stick to INR 25,000 crores and INR 55,000 crores only.

Amit Anwani analyst
#34

Okay, so suppose that plays out — then if NGC orders land within the next 4 months, you'd be clearing those thresholds by sizable margins, correct?

Manoj Jain executive
#35

Of course.

Amit Anwani analyst
#36

And sir, on timing, what would the timeline be for NGC on your side, for execution? And also the timeline for those few large orders you mentioned that sit in the order book, including Fuses, NCA, and BNP — that would be helpful.

Manoj Jain executive
#37

With the exception of fuse — fuse is the only item still outstanding, with roughly 6 to 7 years left, I believe. All the remaining orders fall within the next 3 years — typically just 3, 3.5 years. So every other order will be executed inside that window. And NGC, too, I think that's around 4-plus years, which we'll take to execute once we receive this order. So it really hinges on the ship construction plan. So it depends on GRC and GSL. And I hope they're drawing on help from so many MSME and other vendors to speed up their so-called production and integration of all this Electronic Systems. So they may ask us to prepone. So in that case, we may have to supply over the next 3 to 4 years, but we don't see any challenge in producing these line items, because these line items are well within our production pipeline. So there are no surprises. So if they do want to prepone it, we can definitely execute it. But that all depends on the next few months, when we get the confirmed order. Only with that order will we know the exact delivery dates, what they've negotiated with their principal customer, and how much of that timeline they want to pass on to us.

Manoj Jain executive
#38

With any luck, though, my NGC orders will take no more than 3 to 3.5 to 4 years to execute.

Amit Anwani analyst
#39

Okay. Next, sir, regarding drones. There has been considerable discussion about a very strong pipeline. So where do we stand on that — I believe you also mentioned efforts toward counter-drone systems. I just wanted to get a sense of how Bharat Electronics is progressing on drone-related offerings such as <<inaudible>> or counter-drone systems. So if you could address the drone side and any potential pipeline we are looking at on drones?

Manoj Jain executive
#40

Right. As you correctly mentioned, this is among the major growth areas for any company, and that includes BEL. There are plenty of private-sector firms and start-ups operating in this space, yet room exists for all of us, since the kinds of drone requirements vary — you may have noticed in recent conflicts just how many different types of drones are needed: surveillance-related drones <<inaudible>>, drones with ranges beyond 1,000 kilometers, drones beyond 2,000 kilometers. So those kinds of things exist — drone over drone, drone catching drone. Along those lines, there are hundreds of use cases, including logistics drones and the like. So hundreds of <<inaudible>> exist. And in the market, there are quite good so-called initial products, I should say. But those initial products must be turned into a reliable, supply-chain-based product with sufficient hardening. So BEL is engaged with a great many start-ups and also has its own in-house programs, so that we deliver reliable, trusted solutions that can also be tested in forward-area, jamming-area kinds of environments. So we are working very, very closely with 6 to 8 start-ups at present. And they will come up with that <<inaudible>> great technology, of course.

Manoj Jain executive
#41

But this kind of realization is making it more and more robust, what we're doing, and we've also started bidding. We've received a few orders this year as well, but those orders are in the range of INR 50 crores, INR 100 crores sort of things. So I'm looking at some bigger orders over the next 1 year, 2-year time frame of the order, which we can mention on the investors call too. INR 50 crore, INR 100 crores of orders, we don't even want to discuss those on the investors call, and you also may not be interested in those things. But definitely, I hope next year, we may get at least 1 or 2 big orders in this based on our 6 to 8 big leads and big tie-ups, which we have done with the start-up community. So I'm confident this will yield us very, very good business in years to come. And the same thing is about counter drone. Counter drone, luckily over the last 3 to 4 years, we have established ourselves as a reliable supplier of high-end counter-drone systems. So high end wins, which is having hard kill options also. In that hard kill option, now we are adding microwave DEW based on our own in-house efforts as well as our DRD efforts.

Manoj Jain executive
#42

So that's what we're adding. We've also secured very solid leads in a few foreign countries. Our counter-drone solutions have been successfully demonstrated — they're quite unique on a global scale and very cost-effective. So we're hopeful of securing good export orders soon, since the development has gone very well. The trials concluded with very good results. So we're hoping we may land a good counter-drone solutions deal for exports. Overall, drone and counter-drone is definitely one of our most focused areas — after our missile, arms and ammunition, drone and counter-drone is the second most focused area for us. And we may give you a very pleasant surprise during <<inaudible>>; we may launch a few products at that time. Let me assure you.

Operator operator
#43

Our next question comes from Pinakin Parekh at HSBC Bank Limited.

Pinakin Parekh analyst
#44

Let me start again with the QRSAM. Out of that INR 30,000 crore order, sir, in your estimate what portion would be the value of the core missile manufacturing, which could possibly be opened up to the private sector, since BEL won't be manufacturing missiles, right? It will be manufacturing the systems around the missiles?

Manoj Jain executive
#45

Yes, absolutely — at this moment we aren't producing large mills, though we've begun making a handful of missiles as well, but not <<inaudible>> to tell you. QRSAM was created by DRDO together with BDL. So on that question, you really ought to direct it to BDL regarding how they'll handle this challenge. But let me say — going by the available information and what's in the public domain, I believe their QRSAM missile wasn't on it. They've listed some 4, 5 missile names that the IDO is opening up to the private sector, which might take the private sector a while to absorb too. Still, I don't think the QRSAM missile appeared on that list. In any case, that question you asked specifically because, as I said, for us it's <<inaudible>> of a system involving large, complex radars, communication systems, and the interconnection of all those launchers and missiles. So at present, <<inaudible>> is the design partner for DRDO on the QRSAM missile. Should DRDO alter their plan or something come up, I don't know as of today. So those missile capabilities, if others develop them, may get split to them. But certainly at that point BEL will also step in and contribute, since BEL too, over a period of time, has gained sufficient knowledge and sufficient infrastructure for manufacturing missiles.

Manoj Jain executive
#46

And I want to reassure you once more that the infrastructure there is reasonably solid, even for QRSAM missiles — if the government makes that decision, we have the capability to manufacture QRSAM missiles as well. But as of now, with our official LCM and <<inaudible>>, we serve as the DCPP partner for DRDO, and we anticipate receiving some orders down the road for these 2 missiles. Beyond that, there are another 3, 4 missile programs that are strategic in nature, so we are engaging with design agencies on those. But these 2 have already entered the public domain, where we are the formal DCPP partner. So missiles are definitely something we are placing as one of our focused development areas, because — as you may be aware — actually 60% to 70% of a missile is electronics. Of the cost of missiles, 60% to 70% goes into missile electronics, and the remainder goes only into the other 2 major components. So the biggest component of a missile, I would say, is electronics — and that is where we have now demonstrated our strengths, okay?

Pinakin Parekh analyst
#47

Understood, sir. I’ll just keep going on the QRSAM program. Early in this call, you said that at least for this first INR 30,000 crore order, you don’t expect the private sector to be involved — perhaps later on. So, sir, do you expect the QRSAM program, or variants of it, to keep coming up repeatedly over the next few years as India expands its air defense system beyond what is going to be an offer?

Manoj Jain executive
#48

Absolutely, yes. We said this before as well — what we're about to secure will be the first order. Take our Akash System: if you look at the history, the first order came roughly 20 years ago, I believe, and following that, orders from multiple cities started coming in. We've already received something like 3 or 4 series, and 2 or 3 additional ones are in the pipeline. That's because every 3 to 4 years, or 5 years, a technology refresh takes place, or some extra announcement is made regarding the same technology. And there will be — depending on political and geopolitical — sorry, geopolitical conditions — there will be growing requirements for strengthening further and further. You've all witnessed the recent conflicts; the two hot items in the market that everybody across the world needs are drone/counter-drone and missiles. So for these 2 markets, there are definitely very, very large markets for these 2 segments. And we are working seriously as well to capture as much as we can in these 2 domains.

Operator operator
#49

Subramaniam Yadav from SBI Life Insurance has the next question.

Subramaniam Yadav analyst
#50

Sir, could you bring us up to date on the <<inaudible>> project? As I understand it, the major submission deadline fell around October. So could you shed some light on where that stands?

Manoj Jain executive
#51

Yes. Why not <<inaudible>> is one of the prestigious project for us. And as we have told earlier also, we have done a bid jointly with L&T, being front ending and we are giving them full support in a 50%, 50% consortium basis. We have already submitted a bit? And as per our internal estimate, it is very, very competitive. So we are hopeful to be L1 after technical evaluation and then the bid will be open, and we are hopeful we'll be land that way, we will jointly with team is a private sector, it will be a really good model of public private partnership we are really working for this program and many more future programs. <<inaudible>> also are now aligned our risk to this type of public private partnership. You can ask L&T how their experience is in their investors call. I don't have any issue. But our experience of working with L&T is really great and very, very accommodative, both sides sat together multiple times. And I hope we have given a very, very optimum solution or optimum bid to the agencies, and we are confident we are going to win.

Analyst analyst
#52

So can we expect to see how these turn out?

Manoj Jain executive
#53

Could you say that again?

Analyst analyst
#54

At what point should we expect to hear the result?

Manoj Jain executive
#55

Once more, this is only speculation, since that decision rests with the other party — DRDO has to make that call. Because, as you're aware, ADA is the agency that floated this RFP to choose one of the partners. Again, typically, this is just my guess. Technical evaluation could take 2 to 3 months, because it's still — we have supplied far more detailed technical information than all 3 of us, the different consortiums, have provided. So, since it is a big project, 2 to 3 months of technical evaluation. After that, they may open the price bid. Hopefully, before March, and we may get a positive surprise.

Operator operator
#56

Up next, we have a question from Jyoti Gupta, who is calling in from Ashika Institutional Equities Limited.

Jyoti Gupta analyst
#57

I've got a few questions here. First, now that 8 next-generation cohorts have been approved, of that estimated INR 70,000 crores to INR 75,000 crore program opportunity, how much could realistically come through as combat management systems, radar, electronic warfare suits and communication equipment? At what point should we expect the <<inaudible>> to show up? And what kind of time line are we probably looking at? Second — we're aware there's a lot of work underway when it comes to fixed <<inaudible>>, so what role does BEL play in the Indian Air Force high altitude satellite program, especially on communications and surveillance poles, since this seems set to become the most important technology going forward? My third question: on the small platforms or contracts we've won, in particular the low-level light weighted order worth INR 770 crores from the Army, does this radar carry extra export potential? And might that program generate follow-on orders for deployment across more army formations? And finally, the INR 1,251 crores ground-based mobile linsystem secured with the Indian Army — is that a stand-alone deployment, or does it sit within a bigger network electronic intelligence program? And could more orders for similar systems come through?

Manoj Jain executive
#58

Yes. Even though you were meant to ask just 2 questions — but anyway, that's beside my main point. Your first question is really a repeat, I have to say. I already gave an answer on that: NGC has various separate line items, and you listed all of them nicely as well. So it could take anywhere from 1 day to 6 months. Beyond that, I can't say at this moment, since talks are underway with both GSL and GRSE. And we had already held some similar discussions back in March itself. In fact, during March we believed an order might come our way. So the work is in fairly good shape. It's on that basis that I'm saying different line items may need 1 day to 6 months to turn into a confirmed PO issued to us. Now, on your second question about HEPS. Yes, HEPS is a really strong program. There will be multiple uses for it. But from what I understand, it is still maturing. It isn't a mature solution yet — it's maturing. So while it's maturing, there are multiple technologies involved. One is being developed even by DRDO. One is being developed even by a CSI lab, and then there are some Indian companies too in the race that claim they have this capability, but let me tell you, we are watching all of them closely.

Manoj Jain executive
#59

Since I still feel that we don't yet have mature products — that's our own assessment; perhaps it's wrong, but in our view they're still maturing — we're being careful about picking the right partner, so that my development risks stay minimal and my probability of winning is higher on that program. So we're in the process of choosing a suitable partner for HEPS. Okay. On the <<inaudible>> project: that one we will execute quickly. Technically, a similar order came earlier too, so drawing on that experience, we're all confident we can carry it out. As a matter of strategy, we don't reveal by name whether any product will be exported until the order is in hand. So on my side, no comment on whether this radar can be exported or not. Okay, I hope that's understood. Same situation with GBMES for Army — we've received the order, a very good order. It's very much needed strategically. But once again, its deployment is kept confidential, as with this type of <<inaudible>>, yet let me tell you the products we supply are generally very agile and can handle different kinds of terrain or other requirements. And these days we always provide solutions that are network cable.

Manoj Jain executive
#60

That's essentially our core principle: each product ought to include AI, and each product ought to include a feature that lets it connect to a network. It can serve as that kind of system. These capabilities—I think over the past 5 years, through the <<inaudible>> programs we've been developing—are present in at least some form in every program, since absent these, in today's war scenario, nobody would want our equipment to be <<inaudible>>—so these 2 features are always present in what we offer. Whether they get exploited or not will rest with the end user, and that will definitely be a strategic answer that, in the end, only the end user retains. They will want to disclose it to us as well. The way they effectively employ it in operations is up to them. We don't dictate, nor can we wish to control that. Let me assure you. <<inaudible>> On all 4 questions.

Jyoti Gupta analyst
#61

I just wanted to ask, is there a chance we could get one more order for this, since at the moment...

Manoj Jain executive
#62

<<inaudible>> all EW too — and in fact, EW-related projects are probably something you're seeing right now with requirements rising very, very sharply, because overall the environment for EW is also extremely hostile. And <<inaudible>> has shifted so much over the last 5 years as well. You might have gone 3G, 4G, 4G to 5G, 5G to 6 — that's only on the communications side. The same holds in Radars: technology is evolving at such a fast pace. And that applies mainly to Radar and communication systems. Okay. So once that technology has changed, the need for these kinds of EW systems keeps growing all the time now.

Jyoti Gupta analyst
#63

I just want to ask this: in hostile environments, are these technologies agile enough to interpret—or, let's say, withstand—the shifting conditions of a hostile setting? Or is it, like, a stand-alone thing, or the <<foreign_lang>>?

Manoj Jain executive
#64

Once more, you're putting a strategic question to me, and I'll respond in terms of projects, but I'll say it again: broadly speaking, every project we supply. Broadly, they're extremely agile, extremely networkable, and extremely deployable across different, different areas.

Operator operator
#65

Our next question comes from Ajinkya Jadhav, who is calling in on the Crush Portfolio line.

Ajinkya Jadhav analyst
#66

First question from me concerns the MMO agreement BEL signed with <<inaudible>> and BMS covering an advanced ring and control system for a heavily armored combat vehicle. So where does that program stand? And has it progressed out of the development stage into the <<inaudible>>

Manoj Jain executive
#67

This was an extremely, extremely tough futuristic undertaking, I can tell you. Creating this kind of critical technology — where our role was primarily electronics — with Midhani's part being mostly materials and the <<inaudible>> part being essentially the basic engine control. So we did a first-level study and determined that we are capable of developing this as a technology. But this technology calls for far bigger investments. And those investments can happen with some funding from our side and some coming as grants. So all 3 companies are simply sitting together on how to fund this project, because when large investments are involved, even though the technology has to be developed, we are looking at some technology development funds or other funds from government of India for developing these critical technologies. At this moment, it is in that phase of fining, but the technology understanding, the complexity and what type of investments are needed — that homework, jointly, we have completed.

Ajinkya Jadhav analyst
#68

Understood. My second question concerns the production of the metals we need. Are there any special alloys or steel that we still bring in from abroad which could be made locally with the help of <<inaudible>>, the domestic players? Is there any room for us to raise the indigenization percentage with the assistance of local players for the RM equipment portion?

Manoj Jain executive
#69

I hear you, and I take your point. That said, this issue really concerns AI and other firms — shipyards too, since they consume these materials far more heavily. In our case, electronic material matters more to us than what you might call mechanical materials, things like steel or alloys and so on. In our product, the material cost tied to those kinds of items is barely 1%-odd percent, since ours is mostly electronics. That said, whatever small requirements we have have always been shared with Midhani, and most of it is also shared on the <<inaudible>> portal, so indigenization can happen for that. But our volumes aren't much. So I can't say what priority the private sector is giving it. As such, though, this isn't very, very critical. For an electronic system, these mechanical subsystems aren't that critical — we have multiple alternates available. But for, say, <<inaudible>> engine material requirements, those are much, much tougher than my local electronic packaging material. For me, mechanical items play more of a packaging or system-in related role. But in an engine or in an aircraft design, their role is 10x more. So the challenge for material indigenization right now — the shift for us — is electronics materialization.

Manoj Jain executive
#70

And what's left after that goes to Midhani and the private sector via the <<inaudible>> portal.

Ajinkya Jadhav analyst
#71

Understood. If I may ask one more thing about the NDC, what will the new sensor suite be compared with the earlier core that we'll be supplying, in terms of <<inaudible>> — if you could shed some light on that? — new, so that we will be sitting in.

Manoj Jain executive
#72

I'll tell you that with any new program, there are always some delta changes, because technology in electronics defense—electronics technology moves so quickly—means some delta changes are going to be there. So from your perspective the product name appears identical. But inside it, there's a technological upgrade or some added value that keeps getting done. So can we say it was the previous order, that we're manufacturing the same thing only? No. There are some delta changes driven by the requirements, and that is our continual activity. So — and all types of AW sensors, radar sensors, the communication equipment are part of every ship. Here too, it is there. So the equipment types look the same. But technology-wise, there is continual upgrading from one program to the next.

Operator operator
#73

Our next question comes from Mohit Pandey with Citi Research Limited.

Mohit Pandey analyst
#74

Starting with QRSAM: since this has slipped, could the order actually end up bigger than INR 30,000 crores? My understanding is that the INR 30,000 crore figure was first mentioned over a year ago, and costs have risen since then. Is that how it might play out?

Manoj Jain executive
#75

Broadly speaking, that’s what we’d want too — for escalations to be granted once pricing is settled. But in a government process, typically it runs 1 year, and escalations aren’t provided until later because, across various regions, the project gets delayed too much, and we end up absorbing that. So for the most part we may receive no escalation — perhaps, if we’re lucky, there’s some 6 months aspiration in there. Clear, very good. That would be positive news for you and me. But as things stand right now, I’m expecting an INR 30,000 crore order to come our way.

Mohit Pandey analyst
#76

Got it, sir. Sir, my second question concerns those missiles you brought up earlier during this call. From what I gather, you already have an older MOU in place with Tamilnadu Industrial <<inaudible>> as well as with MIL. So will those arrangements also involve entering into <<inaudible>> &A share, or exposures, for the missile?

Manoj Jain executive
#77

Yes, yes. We've also formally declared this, and it's coming in our annual report as well. Tamil Nadu Explosives Limited is now owned by BEL — for at least the next 30 years, it's there with us, well. So we've already made a good investment there. And some of the missile integration activity we've also started there. So — and definitely, we have a very good understanding with MIL too, of course, so that some of the support for ammunition — because at Tamil Nadu Explosives Limited, we have only a hot integration facility, not the ammunition. We are having integration capabilities right now. An ammunition making facility, we don't have as of now. And for that, we are depending on MIL and solar, and many other companies have come up now — 2, 3 more companies have come up in the private sector also — who can give ammunition to us, and we are having a very good understanding with a few of them. So emission per se, we are right now not there. But if strategically it is required and business demands are there, we can develop that expertise, because reasonably, we have some knowledge on that also. But as of now, our main focus is hot integration, ammunition integrating within missiles.

Manoj Jain executive
#78

That is all excellent technology, and it demands considerable safety plus other security features and infrastructure. So at present, our focus is more on that rather than on developing ammunition perfect.

Mohit Pandey analyst
#79

Got it, sir. And sir, the final question concerns execution. Revenue grew 26% even with a difficult base. Is there any specific reason execution has been so fast even though the order book — the order backlog — is down Y-o-Y? Yes, that would be the last question.

Manoj Jain executive
#80

Alright. So on the order book side, at this point we aren't concerned, since we hold INR 68 crores plus INR 1,000 crores, and hopefully before year-end we will secure INR 55 plus INR 1,000 crores. So as for our book, we want to execute as much as possible. And let me share something — we've now launched our on-time delivery score. We're making big improvements. And <<inaudible>>, we had promised our own users that we're prefunding by another 1 month, 2 months or so. That's why you've observed this. And second, as I mentioned earlier, we wanted to fix things so we deliver more uniform output in every quarter. So that correction was also something we wanted to carry out, rather than loading everything into the last quarter and then leaving suspenses for all of you too — we wanted it more uniform — so it's largely a correction of that plus our rapid execution speed. We don't want delays now. Whatever our delivery commitments are, we wanted to extend 1 or 2 months on this side only. We don't want to shift to the other side, and we're making every effort so that our execution track record gets close to 100% as early as possible.

Operator operator
#81

Our next question comes from Atul Tiwari at JP Morgan.

Atul Tiwari analyst
#82

Just one quick question, and I’m not sure if this has already been covered. QRSAM has clearly slipped multiple times at this point. Could you give any color on what’s behind the delay? And are we still on track to get it over the next 2 months, before this financial project?

Manoj Jain executive
#83

No, the delay isn't really that big. Last year we were optimistic — we said that if things went very well, we might get it by March. But we know that in January and February, the documents themselves are complex — that's a huge amount of work, so it could be later. At CMD, though, I was optimistic, as I always am. The thing is, internally we also know it might realistically only be August or September. So it hasn't slipped that much. But yes, I was hoping that within the NDC order we might also get QRSAM. In any case, when you have big, big orders, the decision makers need their own time. They have to fit everything together, project by project. So we're hopeful that within the next 3 years we may get a positive price. We're not alarmed by the delays at this point. And as I said, we're offsetting some of the delay by taking some advance action toward FOPM realization, for which we've made some solid proactive investments related to QT and to realizing this together with our supply chain partners as well. Actually, let me tell you, on this particular project we've had very, very good support from our supply chain partners.

Manoj Jain executive
#84

Regardless of whether they come from the public sector or private sectors, whether they're a large private seller or a small MSME vendor. All of them are putting in investment on their own end so that the FOPM realization, the first of production model realization, happens ahead of schedule. So that's very, very good news for all of us that yes, in this program, so it is, again, a good model of a public-private partnership in which — the private sector, maybe around 200-plus MSME partners will be involved. And roughly around 70% of the orders which we are receiving will be spread across these 200-plus MSM partners. And at present, they have made reasonably good investment from their side as well. So given this good ecosystem and the good confidence they have in all of us, I am hopeful that this few months delay in acquiring order will not turn into execution. The execution we will be even faster than what users expect.

Operator operator
#85

Sahil Karia from Wideband Investment Management has the next question.

Sahil Karia analyst
#86

Could you give us a bit more detail on the rope order — like what the timelines look like, and what amount are you expecting?

Manoj Jain executive
#87

Yeah. Once more, what we have in hand at present is strictly a development order. It will take a while before production orders come through, since proving a radar on an aircraft while overall sanctions are in place is genuinely a tough job, I can tell you. And that difficulty isn't limited to Indian firms such as HL or LRD — it applies just as much to foreign companies. So it's the hardest part, honestly, because I'm an R&D engineer myself. <<inaudible>> an airborne platform, starting from qualifying any technology. And radar, which is an extremely, extremely, extremely vital sensor for an airborne platform of the 30 or LCA type, needs its own time. So as of now, we are simply carrying out that development order and extending our AAA to LRD. Integration and the rest will then be handled by them. So the overall timelines for this program are being set by LRD. And we are confident that perhaps around '28, '29, we might receive production orders for this radar.

Analyst analyst
#88

The following question concerns the midsize <<inaudible>> that our company develops and produces. Could you provide a complete list of the missiles for <<inaudible>> that BEL is supplying? My understanding is that for certain key messages such as Brammo and others, BEL does not supply the <<inaudible>> — and the same applies to the ATGMs we produce indigenously within India. So could you give us some detail on that? Also, what order quantum should we anticipate going forward?

Manoj Jain executive
#89

Yes. The <<inaudible>> come in 2 main types. One type is RF and the other is IR. So let me tell you, we work in both IR and RF kinds of seekers. But as you noted, right, up to now we haven't reached the <<inaudible>> figure. We are present in certain other missile seeker programs such as Akash, Astra and others, though not promos, but we do know the technology for <<inaudible>> as well. So we proactively began developing that figure too. Because each and every seeker program has different bands, different sizes and different specs. So -- but we now have the capability to develop seekers on our own, because you may know that genseekers were in fact designed by -- they were our guru. However, system engineering and some of the critical components in bids mode were developed by BEL. But over a period of time, we have built good confidence to have these kinds of see end-to-end done by us. So we are doing it. If I'm not wrong, ATMs typically have IRCs. So IR beakers are again used for various applications. And we have very good strength in designing IR figure, although, of course, our first hire peakers are again from DRDO, but we are building strength for developing our own IRC <<inaudible>> as well.

Manoj Jain executive
#90

And we've got a really solid manufacturing setup for these IR <<inaudible>> at our new plant in <<inaudible>>. So what we've done there is build a very strong, I-4.0 compliant infrastructure for producing these IR seekers. So on the whole, we're expanding our part across various missile programs — both kinds of seekers, the DRDO-designed ones that get designed and upgraded, plus our own design. All 3 of those, we're involved in. And let me also mention that in many missile programs, seekers typically account for 20% to 30% of the missile's cost — that's actually a very, very critical and most costly component. So we carry a high business volume. You might be aware that for missiles and drones, as I said, there's demand in India and even abroad as well. And every missile these days will have a seeker. So <<inaudible>> too, if you've got a missile business, typically you'd estimate 2, 2.3x of that will be the seeker business within it. That's all I can tell you.

Analyst analyst
#91

Just to build on that point, what would our capacity be for <<inaudible>> — as in, how many <<inaudible>> are we able to produce at our facilities within a year? If you could just give us a ...

Manoj Jain executive
#92

At present, combining IR and RF, we can easily produce more than 1,000. Should the need come up, we're able to increase that capacity, if necessary, to 2 to 3x more, since the seekers that know — an RF <<inaudible>> such as Radar, while Seker is comparable to my IR camera. From a technical standpoint, the technologies are more or less alike. That means we possess a solid technological grasp of the subject. And since we have substantial infrastructure for Radar and for sensors based on IR, which can be switched over very rapidly to meet the <<inaudible>> requirement, infrastructure-wise we face no bottleneck of any kind for programs involving both kinds of seekers. Yet whenever a need for scaling up does arise, we are prepared for it. No challenge do we foresee, but <<inaudible>> a combined strength of more than 1,000 we certainly do have.

Analyst analyst
#93

Alright, sir. Alright. And if I might squeeze in one more question: should we anticipate a decent volume of orders in the EOIR segment, both for the drones and for the directed energy bases that we're working on?

Manoj Jain executive
#94

Yes. <<inaudible>> is also always a very strategic and effective technology to have in place. And over a period of time, we have built a very solid position in IR. As I said, these are needed for seekers. They're needed for cameras, needed for drones, needed in multiple places. So we have various programs for how to grow our presence in this EOIR segment, with critical technologies under our control, except detectors. The basic detector is still not entirely under our control, and jointly with — we are working on that. Very good progress has been made on the basic detector. But barring the detector, all the other subsystems, signal processing, optics, we have very, very strong capability. So we can produce multiple kinds of solutions built on these so-called critical technological components. So I don't see any challenge there. But yes, with the detector there are challenges, which we are overcoming jointly with DRDO.

Analyst analyst
#95

On the BAW reasons, for instance Rent IFB, like HPM, high high-power microwave appends, or ethereal, which type of an <<inaudible>> is it for the directing?

Manoj Jain executive
#96

Both. We're developing both kinds of weapons — microwave and laser. The laser is the regional technology from DRDO, and microwave as well. Right now the technology comes from RAD-only, but we're looking at other options, including our own in-house options for developing different types of DW weapons. Because, again, it's a changing field. Every 6 months, some new technology comes along. So we thought, although we're supporting our DRDO friends very well, why not build some in-house strengths too. So some proactive R&D we've taken up in both domains with our own in-house teams, and we've also seen some good startups come up in these 2 leased technology domains. So we're working jointly with them as well. So we have all 3 approaches, and we're confident that some good solutions we will immediately offer to our customers, other than what we've already offered them.

Executive executive
#97

Let's go ahead and handle the final question, if we could.

Operator operator
#98

Umesh Raut from Nomura India Limited has the next question.

Umesh Raut analyst
#99

Sir, my question is really about a strategy the Indian Forces could probably adopt, since in the future, or even right now, we are seeing multiple cybersecurity sets and other sectors. Historically we have supplied a very large installed base of defense electronics products to all <<inaudible>>. So how do you view this opportunity in BEL's medium- to longer-term kind of planning? And at the same time, if you could also give us some color on the possible upgradation of the ICC system that the Indian Air Force is looking for, and on expansion of IS further notes as well?

Manoj Jain executive
#100

You said you'd ask one question, but in fact I put 3 to you. Since this is the final question, I'll do my best to cover as much as I can. Cybersecurity, as you correctly noted, is the need of the hour. Yet where technology is concerned, we grasped this at least 25 years ago. At our central research facility, we launched basic research on cybersecurity 25 years back. We set up a group, and they began building leach technology, which forms the underlying ology for this domain. Even today, the C4I solutions deployed in the field have their cybersecurity component developed in-house by bell. Let me assure you of that. However, there is a strong, strong need for cybersecurity solutions in nondefense areas as well. On defense, let me state, we already have very solid solutions in place. But in nondefense, the technology keeps shifting because networks are evolving across nondefense critical infrastructure, of which there are so many. So right now, we are treating this as an added focus, or an added business opportunity. That is precisely why we set up this new SBU, network and cybersecurity, as a separate SV within our Bangalore complex, some 2 years ago — 2.5 years back now.

Manoj Jain executive
#101

And those began producing really solid outcomes in what people call the civilian sector too, including work tied to cybersecurity. We've secured solid orders there. As things stand today, we're carrying out contracts in the cybersecurity space valued at roughly INR 400 crores to INR 500 crores. The pipeline also holds promising leads and opportunities that could turn into substantial business worth thousands of crores. So we recognize how much cybersecurity matters in the civilian arena. On the defense side, it isn't billed as a separate line item; instead it's embedded as part of the package within our C4I offering under our Tipsolution. So that space is definitely one we operate in. And there are certainly solid growth projects there. On the next version of ISCS, I'd like to keep my answer broad, since the matter is strategic in nature. That said, let me tell you this much: our users' expectations for the future ISCS are clear to us, and we've already built those critical technologies. I hope that covers your question.

Operator operator
#102

Since no one else has questions from the participants, I'll now pass the conference to management for their closing remarks.

Manoj Jain executive
#103

Yes. What we said at the close matches what we said at the outset of the year. The guidance we issued at the beginning of the year will be met; we are striving toward that revenue growth of 15-plus percent, though some positive surprises could arise, as you have predicted. That said, at this moment we have confidence that EBITDA margins will be 15% plus, at roughly 28%. Order inflow will be a minimum of INR 25,000 crores excluding QRSAM, and INR 50,000-plus crores with QRSAM included. R&D investment stands at INR 2,200 crores, CapEx at approximately INR 1,200 crores, and the Defense to Nondefense business split is typically 90 to 10. So this guidance that was given, we are going to make it. We are confident of meeting that guidance. Thank you from my side, and from my team of Director Finance and our Company Secretary.

Operator operator
#104

Thanks. That brings this conference to a close on behalf of ICICI Securities Limited. We appreciate your participation, and you can disconnect your lines at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Bharat Electronics Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Bharat Electronics Limited earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.