In Q4 FY '26, Bharat Electronics Limited reported a revenue of INR 27,480 crores, up 16% YoY, and a profit after tax of INR 6,048 crores, reflecting a 14% increase. The company maintained its guidance for FY '27, projecting revenue growth of over 15% and EBITDA margins exceeding 28%. The management highlighted a robust order inflow expectation of over INR 55,000 crores, including significant contributions from the QRSAM program, which is anticipated to be finalized soon.

What topics did Bharat Electronics Limited cover?

What were Bharat Electronics Limited's May 20, 2026 results?

Bharat Electronics' strong financial performance and robust order pipeline position it well for continued growth. The focus on indigenization and technological advancements is likely to enhance profitability. Investors should monitor the execution of key contracts and the impact of external factors on supply chains as potential risks.

Earnings Call Speaker Segments

Operator operator
#1

Good day, ladies and gentlemen, and welcome to the Q4FY26 earnings conference call for Bharat Electronic Limited, hosted by ICICI Securities Limited. This call may include certain forward-looking statements regarding the company, and those are based on the beliefs, opinions, and expectations of the company as of the date of this call. Such statements do not guarantee future performance and carry risks and uncertainties that are hard to predict. As a reminder, all participants will be in listen-only mode, and you will have an opportunity to ask questions once the presentation concludes. If you need assistance during the call, please signal an operator by pressing star then zero on your touchtone phone. I now hand the conference over to Mr. Vikas Singh from ICICI Securities Limited. Thank you. And over to you, sir.

Vikash Singh analyst
#2

Thanks, Rhea. Good evening, everyone, and welcome to today’s Q4FY26 Bharat Electronics call. On the management side, joining us are Mr. Manoj Jain, Chairman and Managing Director; Mr. Damodar Bhattadas, Bhakta Sanant and CFO; and Mr. S. Nivas, Company Secretary. So without spending much time, I’ll turn things over to Chairman sir for his opening remarks. Over to you, sir.

Manoj Jain executive
#3

Thank you. Manoj Jain, CMD of Bell, is here at this site, so first I'll go through the financial highlights for financial year 2526. Revenue from operations rose to rupees 27,480 crore in 2526, compared with Rs. 23,658 crore the prior year, a growth of 16%. Profit before tax climbed to Rs. 8,075 crore in 2526 versus Rs. 7,090 crore the year before, a growth of 14%. Profit after tax went up to rupees 6,048 crore in 2526 from rupees 5,288 crore in the previous year, a growth of 14 percent. EBITDA rose to 30% in 2526 compared with 29% in 2425. Earnings per share also increased to rupees 8.27 in 2526 from Rupees 7.23 in year 2425. The order book position as of the 1st 4th 2026 stands at rupees 73,882 crores. And orders acquired up to 31st March 2026 in the previous year were rupees 30,045 crore. That's a brief financial highlight for financial year 25, 26. As we said at the start of the year regarding guidance, we have met all the guidance parameters in the last financial year. Thank you. That's all from my side.

Manoj Jain executive
#4

To kick things off,

Operator operator
#5

Shall we start the Q&A portion? Thanks so much. The question and answer session is starting now. If you'd like to pose a question, just press star and one on your touch-tone phone. Should you want to drop out of the question queue, press star and two; we ask participants to use a handset when asking a question. Ladies and gentlemen, we'll pause briefly while the queue is put together. Our first question comes from Mr. Amit Dixit at GS — please go ahead.

Amit Dixit analyst
#6

Good evening, everyone, and thank you for the chance to speak. Congrats on a solid set of numbers. Sir, I have a couple of questions. The first one is basically about the new orders we're seeing in defense electronics, especially those focused on emerging technologies—quantum computing, drones, and so on. How do you see Bell building up capabilities for that? Are we nurturing a setup of startups, sort of collaborating with them to make sure we capture those technologies, or are we engaging with our ecosystem of other subcontractors—established ones, the unlisted or listed companies in this area? I just wanted to get a sense of your thinking on it, the sort of capex that would be involved, and how you're developing capabilities for these kinds of orders that are expected to come in.

Operator operator
#7

That means we aren't able to hear you.

Amit Dixit analyst
#8

Huh? Hello? Can you hear me?

Operator operator
#9

Yes, sir. Sir, on the management side, we can’t hear you. Oh,

Amit Dixit analyst
#10

All right, all right.

Operator operator
#11

Ladies and gentlemen, we're disconnecting the management line now. Please hold for a month. I figured I'd been speaking late. All right, Rip up. Ladies and gentlemen, the management line is reconnected. Mr. Amit Dixit, would you mind repeating your question?

Amit Dixit analyst
#12

Yes, certainly, I will. So sir, my question was this: given the recent orders and developments in the defense electronics area, especially some of the orders we've also received in drones, electronics, the new-age technologies, and quantum computing, I just wanted to understand how we are building capabilities for that — whether through, you know, in-house training, or whether you are nurturing a system of startups, nurturing those kinds of companies that work in new technologies, or is it via the tried and tested route, the subcontractors we already have, and the kind of capex that would be involved. So I just want to understand your broad thought process around this. That is the first question.

Manoj Jain executive
#13

Right, yes, I've got your question clearly now. So when it comes to these advanced technologies, they need to be developed together with all of our collaboration partners. For us, those partners are DRDO, startups, academia, and our own in-house capabilities. So whether we're talking drone electronics, drone technology, or quantum technologies — be that QKD or quantum safe communication, and so on — we're pursuing all four of these development pillars, and we've built up solid hands-on experience in these technologies. A few PoCs have also been delivered to our defense users. So across all four of these streams of work, we're fully geared up to tap into all of these technologies. I hope that answers your question.

Amit Dixit analyst
#14

Yeah, only partly. I just wanted to get a sense of whether that would mean additional capex on our side, and whether—given that we're dealing with quite a few stakeholders—it could have an effect on our margins down the road.

Manoj Jain executive
#15

First off, let me say that margins ought to improve only once new technologies arrive, since new technology translates into greater value addition. So when this technology reaches the field, there will certainly be more value addition from our side. That is why margins will be higher only on that account. At present, though, no big-ticket projects or CAPEX projects are coming on that front. Now turning to the capex infrastructure built by Bell, we have definitely developed solid infrastructure, because these technologies demand strong computing infrastructure. The reason is that the underlying technology there is AI, and AI needs very good computing infrastructure, whether CPU or GPUs. So we have invested heavily — at minimum 100 plus crores over the last two years we have put in — and at least around 100 plus, 100 to 200 crore worth of investments sit at various stages of approval. So that is the primary capex required; the building and other infrastructure — testing, infrastructure integration, infrastructure — is definitely much smaller compared with the compute infrastructure, and that too we are setting up at three to four locations, including our CRL Ghazi Awad, our CRL Bangalore, our bstc, our unmanned system, our network and cyber security SBU, and our Balasamudram facilities.

Manoj Jain executive
#16

So across these 5 sites, we're putting money into capital or other kinds of infrastructure. However, when it comes to CPU, the GPU infrastructure has in fact already been built at our CRL Ghaziabad, CRL Bangalore, and software as View and PDIC — at those 4 locations, that work is already complete. During the last year, we carried out some upgrading of that infrastructure, and now, very soon, we're going to set up one separate high computing, high performance computing infrastructure.

Amit Dixit analyst
#17

Great, sir — the second question is basically about semiconductors. So if you could highlight what portion of our total COGS comes from semiconductors, and with the recent rise in semiconductor prices, whether we're able to pass that along or have to absorb it.

Manoj Jain executive
#18

Okay, so right now every semiconductor is brought in from abroad, since that infrastructure is only just being built up here in India. But even though semiconductors are a really, really key component for us, there are also other systems, subsystems, and other technology components, such as compute resources and so on. So semiconductors alone account for roughly 17 to 19% of what we spend on materials. VOP. You could say value of production, so that's what it is. So if semiconductor costs go up, if they go up at all, it only hits that portion. So on the margin, overall, it may not have that big an effect on us. And naturally, we are in the middle of indigenizing some of the technology itself. That way we'll make up for this price offset.

Amit Dixit analyst
#19

Thank you, sir — I’ll rejoin the queue, and best of luck.

Manoj Jain executive
#20

Thanks.

Operator operator
#21

Thanks. Our next question comes from Umesh Raut of Nomura. Go right ahead.

Umesh Raut analyst
#22

Good evening, sir. Umesh Raut here. My first question concerns the submarine program that's being discussed between India and Europe — a European OEM — and it's probably being finalized with Muskon Dockyard at a value closer to 90,000 corrode. So for this program, what sort of opportunities in terms of flow-through orders can BEL expect?

Manoj Jain executive
#23

In every submarine program or ship-based program, for sure, the major electronics come from Bell. In this program, of course, and particularly with P75I, there will also be some foreign components, since the foreign partner works with MDL and, indirectly, works with us as well. So there will be some foreign components alongside good indigenous content. But certain components are homegrown and will be inducted as part of this. So again I can tell you that over 50 to 60% of the electronics in this program will come from Belk, and we are at a very, very advanced stage of discussion with MDL and with MDL's foreign partner for that program. So roughly six subsystems, as we call them, are part of the submarine program. Their technical names are communication suite, navigation, complex system, the combat weapon control system, combat information system, Torpedo fire control system, missile fire control system. Along those lines, some six subsystems exist that are primary, and all of them are electronics driven. So all these subsystems will be part of our bal Kitty.

Umesh Raut analyst
#24

Got it — just on that point. So when you look at it per ship or at the submarine level, what share of the total build or total value would electronics represent as a percentage cost? If you can, give me a rough ballpark figure.

Manoj Jain executive
#25

I can't give you a precise figure, but generally the electronics share tends to land somewhere around 25 to 30%. In this specific case, though, since there's also a foreign component involved, it isn't entirely homegrown or done in house. That's the reason the ratio might shift a bit — 5% plus or minus on those numbers.

Umesh Raut analyst
#26

Got it, sir. For my second question, I'd like to ask about the QRSM program. Where do things stand as far as finalization goes? On the previous call, I believe you said it would likely be March or June, and that this year you'd be signing that contract with the customer. So is there any update on that, and once we land the program, how soon could we expect execution to begin? Also, would the margins be similar to those of our existing business, or might they be lower during the initial stages and then perhaps more back-ended, with higher margins later on?

Manoj Jain executive
#27

As I mentioned previously, we were genuinely hoping that by last year—or even in the last quarter—we might secure it, or at the latest in this year's first quarter. So we remain entirely optimistic that we could receive this order before June comes to an end. There's just a 5 to 10% possibility that it slips into July. But even as of today, we're confident that we may sign this contract by the end of June. All the formalities, the other evaluations, the technical CNCs and so on—the various stages—all of those are now complete, and the process of necessary approvals is underway at different levels within the ministries. So we're confident that within the next one to one and a half months it should be done. In the worst case, it must happen by one additional month. So as of today, we aren't anticipating a delay beyond that. And as for the program, once we sign it, we're supposed to deliver the first production model within 18 months. So we've already begun ramping up the initial groundwork. We've already started on what's needed for this, so that we don't want to fall short on this first target of 18 months. We will definitely deliver our first production model within 18 months of signing the contract, and only after that will the actual bulk supplies begin.

Manoj Jain executive
#28

On the margins and so on, whether it ends up slightly above or slightly below that level, it's too soon to tell. The reason is that only after we finalize the back-to-back contract with our Tier 1 and Tier 2 suppliers will we be able to know how much that may be. But it will definitely be similar orders — there may not be too much change — though the exact quantification of the project we will come to know once we sign that contract with our Tier 1 and Tier 2 suppliers.

Umesh Raut analyst
#29

Got it. My final question is more about the accounting side. When I look at other expenses for the quarter that just passed, they rose roughly 36% compared with a year earlier. Did you make any one-off provisions during that quarter?

Manoj Jain executive
#30

Yeah, DF sir is going to tell us. Yeah, yeah.

Damodar Bhattad executive
#31

These are mostly standard provisions tied to growth in operations—performance warranty, for instance. As turnover rises, we have to set aside more for performance warranty and certain other costs that track the scale of operations. Of course, there's also some LD-related expenditure in there as well. So on the whole, given the scale of operations, this expenditure has gone up.

Umesh Raut analyst
#32

Provisionings for foliar in FY26 ended up being pretty much in line with what we saw in FY25.

Damodar Bhattad executive
#33

The total amount for provisions.

Umesh Raut analyst
#34

Yeah, provisions overall as a share of sales came in around the same level as FY25. Or did they go up at all in FY26?

Damodar Bhattad executive
#35

No. For FY26, there is definitely no increase. It stays almost the same, just following the same pattern.

Umesh Raut analyst
#36

Got it. Thanks. Thanks a lot, and wishing you all the best.

Damodar Bhattad executive
#37

I appreciate that.

Operator operator
#38

Thanks. Our following question comes from Deepen Vakil at Philip Capital. The line is yours — go ahead.

Dipen Vakil analyst
#39

Thanks so much for having me, sir, and congratulations on the strong execution and margin. Sir, my first question concerns your current order books. Could you walk us through how those existing orders break down project by project, and what timeline you expect for executing the order book as it stands today?

Manoj Jain executive
#40

Right. So that order book worth roughly 74,000 crore is made up mostly of a handful of large-ticket items. Let me just run through them. The electronic fuses, the LRFM, the LCA Mark 1 Mark 1A LRUs Tejas, the BMP upgrade spare services and miscellaneous items. Then the Ashwini radar, and the EW suite for Mi 17 V5. Those are the main projects we'll be executing over the coming two to three years. From that, I believe we're supplying all of these items next year as well. The electronic fuse, though, runs for another seven to eight years — seven years more — and the BMP2 upgrade is also for another two years. As for the rest, we'll be executing those orders over one, one and a half years.

Dipen Vakil analyst
#41

Understood. So could we put some numbers on a few of those larger items?

Manoj Jain executive
#42

Right. Electronics has roughly 4,300 crore still remaining for the US over the coming 7 years. LRCM, about 3,500 crore. LTA, roughly 3,200 crore. The VMP2 upgrade, around 2,800-plus crore. Ashwini, approximately 2,460 crore. Mi17v5, about 2,200 crore. Spares, services, and miscellaneous items, again roughly 2,500 crore. Those are a few of the main items that need to be carried out in 26 and beyond.

Dipen Vakil analyst
#43

Understood, sir. My second question concerns how your orders feed into guidance for the coming year. So, leaving QR Sam aside, what order information are you seeing for FY27?

Manoj Jain executive
#44

On that data — well, when I get to my closing remarks, I’ll go over what the guidance looks like for this year.

Dipen Vakil analyst
#45

Understood, so in that case I’ll go back to the Q.

Manoj Jain executive
#46

Yes. Thanks a lot.

Operator operator
#47

Thanks. Our following question comes from Mohit Pandey at Citi Research. You're up.

Mohit Pandey analyst
#48

Yes. Good evening, sir, and congratulations on the strong execution. Continuing on, my first question concerns the DAC approvals we witnessed last year, which came to almost 6 lakh crores. And this year we have seen base orders of almost 30,000 crores. So could there be a possibility that base orders step up next year as these orders come in — as these approvals enter the ordering chain?

Manoj Jain executive
#49

That's certainly true. In any case, during my closing remarks I'll lay out what we're looking at for this year and beyond. So please hold on for the closing remarks.

Mohit Pandey analyst
#50

Got it, sir. The next item concerns the other income line, which appears to have declined. What might account for that in this quarter is that

Damodar Bhattad executive
#51

Throughout the year, average interest rates came in lower. The average yield we received from the banks was also lower. That's a big factor behind the decline in other income.

Mohit Pandey analyst
#52

Got it, sir.

Damodar Bhattad executive
#53

That also had some impact.

Mohit Pandey analyst
#54

I apologize, sir — I didn’t catch that last part.

Damodar Bhattad executive
#55

The drop in other income comes down to those two factors: a lower average interest rate and changes in foreign exchange.

Mohit Pandey analyst
#56

Got it, sir. Sir, I also wanted to get a sense of exports — the portion of backlog coming from export orders appears to be growing. So what’s behind that?

Manoj Jain executive
#57

From an export standpoint, the order book looks healthy. Yeah. We have roughly 96 million US of orders booked for this year and the years that follow. A portion of those orders will be delivered over two to three years. But that is why, once we — I will provide guidance regarding this year. I will state what portion of this order book can be executed during this financial year. What we have planned, I will share at the end of this.

Mohit Pandey analyst
#58

Got it, sir. One question on the bookkeeping side. If you're able to share how much sits in advances. Yeah. Operating cash flow appears to have gotten better this year. So is the increase in advances what's driving that? That's what I'd like to understand.

Damodar Bhattad executive
#59

No. Across the year, cash flow has been fairly solid, more or less. As you’re able to see from the cash balance at year end, advances — since the year end — stand at roughly 12 and a half thousand crores from customers.

Mohit Pandey analyst
#60

All right. All right, sir. All right, sir. That's all. On my end. Thank you very much.

Damodar Bhattad executive
#61

Thank you.

Manoj Jain executive
#62

You.

Operator operator
#63

Thanks. Ladies and gentlemen, please keep it to 2 questions per participant. If you have a follow-up question, we ask that you rejoin the queue. The next question comes from the line of Atul Tiwari from JPMorgan. Please go ahead.

Atul Tiwari analyst
#64

Yes. Sir, my question again concerns the fact that your order book hasn’t grown this year. In fact, it has been flat for a while, because at present your annual order inflows are quite small — you know, comparable to your revenue figure. So in that situation, how long can you keep up this kind of revenue growth of 15% plus? Is maintaining that level feasible, or over the medium term do we come down to a lower level of 12, 13%?

Manoj Jain executive
#65

No, that answer is definitely right. I’ll address it at the end of this call. But let me say, I think last year we also mentioned that each year we receive a certain fixed set of orders, and every 3 to 4 years we get some big-ticket projects. Those big-ticket projects will put us in a good, healthy position on the order book and execution, and give us a good growth rate. So like this year, QRFM we are definitely going to get now anytime soon. And that way, after 2 or 3 years, we again have 1 or 2 big big-ticket items in the pipeline that are more than 20205000 crore type of one big-ticket item—definitely there will be one to recoup. Otherwise, the constant order flow will be there based on all our different types of portfolios. So with that, we are definitely going to have a very very good growth rate and that. Anyway, I’ll tell you at the end of the program, but let me again assure you there will not be any downtrend. We have seen—we are highly optimistic for at least the next 5 years, where our main main leads are. And we are confident we will have only a higher trajectory, not otherwise.

Manoj Jain executive
#66

Definitely not a trajectory that's lower.

Atul Tiwari analyst
#67

And sir, besides qrfam — which, you know, is probably coming very soon — could you also discuss a few bigger projects, say those with an order size above 50 billion rupees or 30 billion rupees, that would come to the company over the next two years?

Manoj Jain executive
#68

Yes, absolutely — so with NGC, there are numerous subsystems under the NGC next-generation Corvette program that will definitely arrive this year, and a few might slip into next year. Also, on a few subsystems — but at minimum 50% of them — we're hoping to secure those this year alone under the NGC program; for the Shatrugad and Samagat EW Solutions, we're hoping very, very soon. P75I, which I mentioned just before — there are a great many fixed subcomponents within that. So we're going to receive some orders for that this year. On the Hammer program, we expect something very soon. Shakti Phase 4 — very soon as well. The MFRX radar for naval ships is another one we expect very soon. So these are among the big-ticket items that we'll mostly secure within this year itself. A few could spill into next year, so that's 2627 and a little past that into 2728 — this is the mix of projects I've just laid out for you.

Atul Tiwari analyst
#69

All right, thanks. Thanks.

Operator operator
#70

Thanks. Our next question comes from Jatin Sangavan at Optiver. Your line is open.

Jatin Sangavan analyst
#71

Appreciate you taking the question. My first one concerns project Kusha. I came across something saying India is getting ready for the first firing trial of the AI Defense interceptor under Project Kusha by late July. So I was hoping you could shed some light on that — what part do we play, and what sort of order might come our way for this prototype?

Manoj Jain executive
#72

To reiterate, this initiative is led by drdo. For them, we rank among the biggest development and production partners. That being the case, this question really belongs with drdo. Naturally, as their DCPP partner, we're aware of whichever portion we're building for them. So those portions — various radars, various control centers, communication systems — stand at a very, very advanced stage of delivery or prototype realization. I can speak only to the portion I'm directly driving. But the overall programs, the trial directive, which missile gets tested first and in what configuration — drdo decides all of that. So this question actually relates directly to them. As for me, right now I'm only answerable for these subsystems.

Jatin Sangavan analyst
#73

Understood. Moving to the second question, which concerns data centers: we aim to go after the government data center business. What does our order pipeline look like for that business, and are we achieving any success there?

Manoj Jain executive
#74

On the data center side, there are already plenty of competitors out there, so our aim was to deliver something distinct. That distinctiveness has two aspects. First, from a security standpoint, we're offering a solution that's more cyber safe, and we've already picked up a few leads where we're incorporating our own cyber security elements. Beyond that, though, the servers and other pieces are cords. So that's one group of target customers for us, where we currently have only a few hundred crore worth of projects. The larger portion, however, is still ahead of us, where we want to offer a completely indigenous, full data center solution — with hardware and software stakes as well, and cyber security elements that are all homegrown. A few come from our own company, and a few come from our team's Indian development partner, cdac. We're at a very, very advanced stage of talks with them to provide end-to-end, fully homegrown data center solutions to a large number of customers. Once we click on that, that order, we're expecting something on the order of 2,000 to 10,000 crore. Somewhere in between — the first order will be from the few hundred crore we already have right now, but good leads are there.

Manoj Jain executive
#75

So from that first business segment, we could expect something in the range of about 1000 to 5000 crore of business. But the bigger piece of business comes through the overall homegrown data center solution, and we're looking at that as somewhat larger. So we're at an advanced stage of discussions with CDAC as well as their Tire 1 and Tire 2 suppliers.

Jatin Sangavan analyst
#76

Of course — please proceed, and thanks.

Operator operator
#77

Thanks. Our next question comes from Amit Anwani at PL Capital. Please go ahead.

Amit Anwani analyst
#78

Hello sir, and thank you for the chance to speak, plus congratulations on the strong results. Sir, my first question is about the gross profit margins that keep getting better. Looking from F24 up to now, we're at nearly 49%, so that's a meaningful gain in gross profit margin over the past two to three years. And given that you pointed out what will come from the current order book for execution, what's your view on the gross profit margin for F27?

Manoj Jain executive
#79

I'll go over all of this at the end again, even though I already know the answer to a lot of it, because frankly I didn't want to repeat myself. So I will definitely cover all these points at the end. But let me say this once more. Profit margins come down to the product mix. The mix of products shifts somewhat from one year to the next, and because of that you'll see some variations, so we forecast that at the beginning of the year, and generally we hit the mark on what we forecast. So this year, even though we've done the prediction and have that predicted value, I'll share it with you in my closing remarks.

Amit Anwani analyst
#80

Yes, sir, regarding your second question, where you mentioned that we're aiming for good growth of at least 4 to 5 years — I just wanted to get a sense of things on the capacity side. Where do we currently stand with respect to capacity utilization, and what CAPEX would be needed given the pace of growth we're anticipating? Also, how much did CAPEX come to this year, and what's the guidance for CAPEX for F27?

Manoj Jain executive
#81

As you correctly pointed out, strong growth requires solid investment plans as well. So it's not just about the projects — capacity must also be expanded, and at Bell that's an ongoing process. But given our large base today, and with a base of that size, this kind of growth — double-digit growth — calls for additional investments. That said, a solid plan is already in place for it, and last year, I believe, 900 crore rupees of capital expenditure was booked. In any case, I'll tell you at the end that it will definitely be considerably higher than that. But we have far bigger plans for the next three years. Some major projects at Palatamudram, at Chitrakut and the Vellore facility are in the pipeline for us, and beyond that, at our Ghaziabad and Bangalore sites, substantial investments are planned to upgrade the facilities for diversified products, and for a new dimension of products that we are going to enter, large capex projects are in the pipeline. So all of that together will definitely ensure that we don't face any capacity limitation when we execute the projects in the years to come,

Amit Anwani analyst
#82

Okay, so as things stand right now — something like 70%, 80% — how much more can still come out of the capacities we have today? Another year, another two years?

Analyst analyst
#83

No.

Manoj Jain executive
#84

It's not at all like having that present capacity for a single year or a couple of years, and so on. The reason is that, once again, we have a mix of products — some things we build in house, from the component level all the way up through module 10 to the system level — while certain projects we're doing involve only system integration capability. Projects tied to system integration, you know, call for far less infrastructure and far more skill at the component or subcomponent level. They also demand a substantial capital infrastructure, along with specialized infrastructure. So because of that, we can't tell you that my present capacity covers however many additional years. That means we have to invest in various locations for various kinds of infrastructure — for instance, for semiconductor component assembly and manufacturing we need SMT machines, our clean rooms, and our various MMIC-related processes for handling MMIC and so on. On the other side, we need large space for missile integration type projects. So we're putting money into both areas. Because of that, we aren't seeing any bottleneck for us over the coming few years, perhaps three to five years. So there's no bottleneck when it comes to capital infrastructure, but we keep adding continuously so that we don't run into this kind of shock over the next 10 to 15 years as well.

Amit Anwani analyst
#85

Okay, so last thing — where things stand with the MCA project. We're picking up that the land has been locked in for that 15,000 crore project. So is there anything from your end on the RFP front, or any other developments that may have come up on that side? Thank you.

Manoj Jain executive
#86

Okay, so as you probably know, we’re among the three bidders that were chosen to receive the RFP. Meetings tied to the pre-RFP stage have already taken place. At this point, we expect the formal RFP to reach us mostly this month or next month — meaning us as a consortium partner, Bell and LNT. LNT was our lead bidder. So LNT will get the RFP mostly at some point between the next 15 days and one and a half months, and after that we’ll begin responding to the RFP on development and the land acquired and so on. That part is handled by ADA, the DRDO. Because here, again, we’ll only be the DPP partner for the five prototypes. But the program is run by ADA, the Aeronautical Development Agency. So that land and that test facility are actually taken by ADA, and they’ll be used for the MCA program. So during this development we’ll also use that facility jointly with ADA. But we’re also starting to invest in our own infrastructure. Once we get the RFP and once we’re picked as the selected bidder, then of course our capital investment will go up. Right now we’ve only done the basic plans.

Manoj Jain executive
#87

We've only put together the kind of plans that cover what we'd need to do if we end up being the chosen bidder. However, the actual execution, or the actual investments, won't take place until we've been picked as the winning bidder once this RFP process concludes.

Amit Anwani analyst
#88

Thank you very much, sir, and best of luck. Thanks. Thanks.

Operator operator
#89

Thanks. The next question comes from Ankur Sharma at HDSC Life on the line. Please go ahead.

Ankur Sharma analyst
#90

Thank you. All of my questions have been addressed.

Operator operator
#91

Thanks. Our next question comes from Harshit Patel at Equis Security. Go ahead, please.

Harshit Patel analyst
#92

Thanks a lot for the chance to ask this, sir. So first, on pricing under the nomination-based contract: when the Ministry of Defense announced the new PBT norms back in FY20, the expectation was that margins would face pressure. Instead, margins have expanded not only for you but across the entire defense ecosystem. So what has made this performance possible?

Manoj Jain executive
#93

Like I mentioned last year, and I'll say it again now: it comes down to indigenization. Making critical technology, modules, systems, and subsystems indigenous has clearly been a big help to all of us. That's exactly why we're directing all our efforts toward raising that indigenization score across the board. So, as one step, through our own in-house work we've even set up a dedicated indigenization cell at Bell to keep close watch on our own development, along with the development carried out by our MSMEs, other startups, and other partners. We're tracking closely and giving support to our ecosystem partners so that indigenization goes up. The quicker we achieve indigenization, the more profitable every one of us becomes. That much I can promise you: it is solely indigenization that has genuinely benefited all of us.

Harshit Patel analyst
#94

When we indigenize a particular subsystem or module that Dido definitely knows, that the Ministry of Difference knows, that the ecosystem knows—so whenever the order placement comes, why isn't the Ministry of Defense cutting down the prices? Why are they letting PSU and the entire ecosystem make, I mean, much more margins than what they have traditionally allowed?

Manoj Jain executive
#95

First, MOD’s job is to back the industry and build a favorable setting for atmanirbharta, or indigenization. So they certainly shouldn’t sever the root itself. The point is, when they benchmark the price—there are many ways to do benchmarking. What does this item cost? If I import it, suppose that becomes a benchmark price, and after that we carry out further cost optimization and indigenization, which we can then return as our profit—and what do we evidently do with those profits? We put them back into capital or into R and D. So MODI also doesn’t want us to break this cycle. They are in fact helping us achieve greater indigenization, or more Atmanevartha, and the policy permits that to happen.

Harshit Patel analyst
#96

Finally, could you give us an update on the UTTAM radar program? Has HM finalized the quantities and scope, and when might supplies from our side be able to start? Regarding development of the subsystems — ours versus the other player also involved — where do we stand in this program?

Manoj Jain executive
#97

Once more, that question ought to be directed to HAL, and even more so to DRDO's CASDIC, since they aren't LRD. LRD is the DRDO partner that originally designed the UTTAM radar, while HAL serves as the systems integrator bringing UTTAM onto the LCA. So they are the ones who should be asked when these tests happen and at what stage they stand. From what I understand, they were at the very, very final stage of testing and certifying this radar for the LCA. But I don't know the exact position, because that question fits LRD and HAL better, and whenever they finalize things, they'll issue RFPs to us for the subsystem or components. As far as my records go, to date I have not received any inquiry from them regarding this program. That much is the status from my side. For the accurate status, though, you can get it either from LRD or from HAL.

Harshit Patel analyst
#98

Right? Thanks a lot for taking my questions.

Operator operator
#99

Thanks. The following question comes from Sumit Kishore at Axis Capital. You have the floor.

Sumit Kishore analyst
#100

Good evening, and thank you for the chance to ask. My first question concerns the net working capital cycle at the close of FY26, which appears to have risen sharply relative to FY25. Could you discuss the variances that produced this result? It also looks like receivable days have climbed by roughly 30-odd days. I'd appreciate your comments.

Damodar Bhattad executive
#101

So the current cap ratio right now stands at roughly 1.97, versus 1.76. You're correct that receivables rose this year compared with the prior year. During the previous year there were certain constraints on the customer side, and those funds came in afterwards, in April and May — that's why the figure at year end looks bigger than last year's. But that amount, which should have been collected in the previous year, has since been received in the current year.

Sumit Kishore analyst
#102

So then a more sustainable level for the receivable cycle would be roughly what — 130 or 140 days of sales, or

Damodar Bhattad executive
#103

For the last 4 or 5 years, it has stayed at roughly 140 to 150 days. My expectation is that it will remain near that range. 1.

Sumit Kishore analyst
#104

Understood. On my second question, it concerns the ratio of operating cash flow to EBITDA. In FY26, your EBITDA came to roughly 8,000 crores, while cash flow from operations, as reported in the BSE filing, stood at approximately 1490-odd crores. That works out to a conversion ratio of around 19%. In FY25, the same ratio was roughly 6.8%. And when I look at cumulative operating cash flow reported across the last four years against cumulative EBITDA reported across those same four years, the conversion factor comes to about 33%. Typically, companies in the capital goods sector, I mean, would show better conversion of EBITDA into operating cash flow. Your comments, please.

Damodar Bhattad executive
#105

Look, overall, the breakdown of operating cash flow by item has been provided. In the statement uploaded to the stock exchanges, all the details for each individual item are already there. So in that sense, rather than giving you a deeply technical answer about what the ratio is, what I can say is that the current cash position is reasonably fine for us to sustain the plans you have for the future.

Sumit Kishore analyst
#106

All right, all right. Thank you very much, and I wish each of you the best.

Operator operator
#107

Thanks. Our following question comes from Kavish Parekh at 361 Capital. The line is yours — go ahead.

Kavish Parekh analyst
#108

Hello, and thank you for the chance to address this. So, first, regarding the supply chain conditions we're seeing right now, with the macro backdrop in mind, are you seeing any disruption when it comes to sourcing or the availability of critical components and semiconductors — you touched on this earlier — but could you also tell us the main countries or regions, particularly in the Middle East, that you bring critical components in from, and whether you anticipate any effect on execution timelines or margins in the near term?

Manoj Jain executive
#109

No, the supply chain itself has definitely been hit a bit — particularly with the Middle East crisis, and some sub-components for major designs and major programs such as LRC used to come from the Middle East. So we certainly saw a delay of roughly one to one and a half months, and that is why we were looking to bring in slightly better revenues. There was a small setback, though it lasted just a few months. So on the whole, I don't see any significant impact on our turnover, revenues and so on. Looking at the year, year on year, I don't see much of a challenge. The same holds for semiconductors as well — very, very few semiconductors originate in the Middle East. Some detectors, including high-end detectors and the like, yes. Apart from that, the major semiconductor ICs and so on come from sources in Europe or the US, or partly Taiwan. So we aren't really affected to that extent. When we look at yearly targets or the yearly picture, with this Middle East crisis there are some month-to-month variations, or spillover of up to 1/4 into the next quarter and so on. These are simply part of life for us, and we plan adequately based on whatever we can anticipate, and then set our own targets — our own monthly targets and quarterly targets — and on that basis we make some minor corrections and so on.

Manoj Jain executive
#110

But in that respect, nothing major is being forced on us as a challenge.

Kavish Parekh analyst
#111

Okay, got it. Then, second, you pointed to indigenization as a major lever behind the margin improvement you've achieved over the last several years — the past few years. So where does indigenization currently stand across your product portfolio, and how has that changed in recent years? Looking ahead, what scope or headroom exists to push localization further? And to make that happen, do you see any bottlenecks — whether around access to technology, the local component ecosystem, testing cycles, or capabilities among local vendors, and so on?

Manoj Jain executive
#112

On indigenous content, as you're aware, the Government of India's policy today itself calls for a minimum of 60% across all our new projects. So for various programs, we mostly sit in the 80 to 85% range on indigenous content. It varies with the type of product and the product mix — our homegrown products or those driven by DRDO — and sometimes it reaches as high as 90%. Then there are other programs where we still rely on ToT that we took a few years ago, and there we're at around 55, 60, 65%. But overall, it will be above 80%. And the main limitation we foresee right now concerns semiconductors only, because apart from that, enough infrastructure has been created in India at the module and subsystem level, so we don't see much of a challenge there. But on semiconductors, it will take at least a few more years before we start getting semiconductor ICs from India itself. So that will slightly affect our indigenization score. But over the next two to three years, an average of between 80 to 85% indigenous content will be there for our product.

Kavish Parekh analyst
#113

Got it, sir. And last thing — on the non-defence side or in international markets, like the export fees, are there any incremental opportunities you see materialising over the next, say, 12 to 18 months?

Manoj Jain executive
#114

Both of those areas are really, really key for us to keep up this double-digit growth. So non-defense is at 8 to 10% right now. We wanted to raise it steadily to 15 to 20%. And it's the same story with export, which currently sits at 4 to 5% over a period of time. But that period is roughly 4 to 5 years. We want to lift it to more than 10% of our turnover. But in the near future, over the next one to one and a half years, the gain will perhaps be 1 or 2%, not more. But definitely, because of the increasing side only, both fronts — non-defense as well as exports — are growing. Their contribution is rising only within our overall turnover or other venues.

Kavish Parekh analyst
#115

Okay, that helps a lot. Thanks very much. Out to the West Coast now.

Operator operator
#116

Thanks. Our next question comes from Tina Virmani at Motila Loswal Financial Services. Go right ahead.

Teena Virmani analyst
#117

Thanks for taking my question. Sir, my question concerns networking capital, and part of it you've already answered. It relates to customer advances, because that figure—whether as a percentage of sales or as a number of days—has also been declining over the past two years. And how do we see it moving forward, given the new orders you're likely to get, particularly the bigger ones like QSIM and all? What kind of customer advances will be there? So how should we look into this aspect?

Damodar Bhattad executive
#118

Regarding the QSM contract, it’s still being finalized, so we’d prefer not to say much about the terms or the prices, since that process isn’t complete. As I mentioned, total advances stand at roughly 12 and a half thousand crores as of 31st March 26th. And when it comes to operating cash and cash flow, as I said, it’s good — good enough for us to support the expansion plans we’re considering over the coming years.

Teena Virmani analyst
#119

However, when it comes to the advances you receive from the effect of incremental orders — since order inflows for the company have been fairly good over the last couple of years — the customer advances aren't moving in line with those. So how do we, how do we

Damodar Bhattad executive
#120

It really comes down to what each contract's payment terms are. No two contracts look the same, and it hinges on the payment terms set out in that contract. So some contracts involve advances and stage payments, while others have terms that are a bit different. That's how the mix of contracts works.

Teena Virmani analyst
#121

Right, got it. So things aren’t the same across every project, mainly because almost all of it is coming from the Ministry of Defense.

Analyst analyst
#122

That

Damodar Bhattad executive
#123

This is the term, and this is the term, and it’s final for all the context — it is not that way.

Manoj Jain executive
#124

And whenever we run our costing, we account for that parameter as well as whatever advance or payment schedule applies to each individual program, based on that. So from our standpoint, nothing here is alarming as such. Understood.

Teena Virmani analyst
#125

And my final question concerns the larger export opportunities. Which ones do you believe could actually come through over, say, the next 1 to 2 years on the bigger platforms you're working on? Or will it be more the smaller kind of export orders that you've been handling so far?

Manoj Jain executive
#126

No, the orders are definitely smaller — much smaller than where we were — but repeat business does exist for those orders. There are also some other big ticket items we're working on right now. Communication equipment was one such project: last year itself we secured a very good order, and there are opportunities in this type of communication equipment, especially SDRS and others, plus communicate satellite communication systems. So large orders of those types are expected for these two. And after Opsindor, we've got very good leads for truncated C4I solutions, as well as customized C4I solutions for various countries. So those are also system oriented solutions. So some big ticket items, where big ticket leads exist, are related to that. But of course, whatever we received earlier over the last five years — the related repeat orders from the same customers — those are also coming up as regular business for us.

Teena Virmani analyst
#127

What's the timeline looking like for those large-ticket leads to actually come through?

Manoj Jain executive
#128

These leads fall into several categories. For instance, one of the main ones came to fruition last year, I believe around March, and this year too there are one or two sizable lead tickets in play. Yet, as you're aware, the genuine difficulty with exports lies in securing an order, given the numerous geopolitical circumstances and complications and so forth. So unless an order actually comes in, for us it remains merely a lead. We truly cannot forecast this. That I'll have it by a particular date with far greater certainty — that I can say regarding our indigenous programs or our Indian programs. In exports, though, that kind of certainty doesn't exist. That's why we gather so many leads into our pipeline and only then provide a calculated score grounded in our experience — how much we will certainly perhaps achieve during this year. Still, a trace of uncertainty always remains where export order acquisition is concerned.

Teena Virmani analyst
#129

Understood, sir. That covers everything from my end.

Operator operator
#130

Thanks. Our next question comes from Hardik Rawat at IIFL Capital. Hardik, please go ahead.

Hardik Rawat analyst
#131

Thank you for the chance to speak, sir. First, I’d like some clarification on what you said about the P75 order. You noted that electronic systems usually account for somewhere in the range of 25% to 30% of the project cost. And because a foreign player is involved here, Bell’s portion would be roughly 50% to 60%. That would imply about 15% to 18% of the total project size should come to us. Is that the right way to understand it, based on those remarks?

Manoj Jain executive
#132

At a macro level, you're correct, but at the micro level, when we get to each individual line item, there may be some minor plus or minus there. Still, for us this is definitely a big order. It will be a big order for us, but as I just mentioned, some of the items come from our foreign partners, so that's the partner-related work share.

Hardik Rawat analyst
#133

Hello? Is anyone there? Hello?

Operator operator
#134

I’m not able to hear you. Hello, sir.

Hardik Rawat analyst
#135

You mean the management, right?

Operator operator
#136

Yes, sir. Please hold for just a moment. Ladies and gentlemen, kindly remain on the line until we bring management back. It. Ladies and gentlemen, management has been reconnected. Yes, sir. Yeah,

Manoj Jain executive
#137

My apologies for that technical issue once more—it seems we got cut off because of it. So we'll take a few additional questions.

Hardik Rawat analyst
#138

Yes sir. So, hello.

Manoj Jain executive
#139

Yes, please.

Hardik Rawat analyst
#140

Your response didn't come through. Regarding the submarine order, I believe you were referring to both receiving it and executing it. Could you go into more detail on that?

Manoj Jain executive
#141

I said that your forecast or calculation is more or less correct. Still, there is a bit of a surprise factor, since for some of the foreign component items, it remains to be seen how much and which module we will make indigenous, because certain of those things may also be localized through another Indian partner. So the fine details of those foreign components have yet to be settled with them. That is why this forecast could shift by a few percent either way.

Harshit Patel analyst
#142

Understood, sir. And after we get the order, do you have any sense of how long the execution cycle would take? I mean, what should we expect once that order comes in?

Manoj Jain executive
#143

My recollection is that it's around 5 years, if I'm not mistaken. Approximately, since there are 6 submarines, MDL will certainly settle on a definite timeline for the submarine development plan. As far as producing those electronic items goes, I don't see any particular obstacle on our side. That said, it hinges on how long submarine development and manufacturing take. Only on that basis will they want my delivery schedule matched to theirs. So for that reason, I'll line up with their delivery schedule. Where the program is concerned, we face no capacity constraint or any other limitation.

Hardik Rawat analyst
#144

Professor, that's really useful. For my second question, I'd like to ask about the new products currently in development, particularly the directed energy weapon system. So if you could, you know, go into a bit more detail on that — what exactly is Bell doing here, and how are we working with DRD on this project?

Manoj Jain executive
#145

To be sure, we began collaborating with DRDO on this program. Naturally, our CRL Bangalore was also pursuing certain efforts independently, in joint work with IISC as well as drawing on our own in-house capabilities. Still, for the bulk of this DAW development, our reliance is largely on DRDO — on CHESS, which handles the laser-based DEW, and on MTRDC for the microwave-based dew. As a result, we serve as their biggest development and production partner across most of the DEW programs. That said, we have likewise begun indigenizing certain critical subsystems of these programs ourselves, so that indigenous content keeps rising and self-reliance (atmanirbharata) in these critical technology segments keeps growing. This we are pursuing through internally funded programs led by our PRN and strongly backed by our Product Development and Innovation Center. So that too sits in our pipeline. Nevertheless, at present we mainly lean on DRDO for the development of these two programs, and we are supplying certain developmental orders to them, as well as supplying in cases where programs are user driven. Thus we provide some of the DEWs to users as part of our D4 projects and so on. But for certain of the large DW programs, we are their DPP partner, and we supply them these modules built to the design they have created.

Hardik Rawat analyst
#146

Understood, and that's really useful. So to wrap up, going back to the point another participant raised earlier about our margins: if I look at them, thanks to the improvement you've seen in gross margins from indigenization, as you mentioned, they sit at a record high of roughly 29-odd percent. And congratulations, sir, because we have consistently beaten the guidance we gave. But that does raise the question that, starting in the fourth quarter of FY27, we might see some increase in provisioning because of the pay commission changes, even though that doesn't affect us directly. But I'm assuming that, thinking about last time, when the pay commission changed, our employee cost also went up by more than 20% on a YY basis. Do you expect these kinds of margins to be sustainable? At least what we've achieved in FY26 — if there is any dilution you're expecting, how severe could that dilution be, and could the higher employee cost play a part in that going forward? Assuming our gross margin profile, by virtue of the indigenization we've achieved and that we're going to achieve, should stay high.

Hardik Rawat analyst
#147

Sir, we’ll take your comments at this point, please.

Manoj Jain executive
#148

As we provide guidance, every parameter gets factored in. So right near the end, in just a few minutes, we'll be giving that guidance to you. For this year, we've definitely accounted for all the parameters, including the wage revision for our employees, which is due in 1127. So it's only in the last quarter that we might see somewhat more wage-related exposure in expenses. Keeping in mind our indigenization and our entire product mix for this year — it's on that basis alone that we've arrived at the guidance I'm going to share with you very shortly.

Hardik Rawat analyst
#149

Understood. That’s genuinely useful. Thanks very much, and best wishes.

Manoj Jain executive
#150

We have time for one final question, and after that we’ll share closing remarks along with our guidance.

Operator operator
#151

Got it. All right, then, our next question comes from Jyoti Gupta at Ashika Institutional Equities. Your line is open — please go ahead.

Jyoti Gupta analyst
#152

Good evening, sir. Those are impressive figures, Mike. I have plenty of questions, but I'll start with this one. Given the strength of your cash generation, how is Bell approaching capital allocation? Would it come through larger dividends, acquisitions, investments in technology, or expansion through inorganic means?

Manoj Jain executive
#153

Absolutely, ma'am — if we're going to achieve double-digit growth over the next five to 10 years, we need to work on every parameter. So we have our own separate plans. There's a strategic planning group led by a general manager who handles all of this, and the corporate finance group supports them well. They put together these plans covering where the allocation should go and which area should receive more investment over the coming few years. And it's certainly a sensible blend of the various parameters, or the various portfolios, that you mentioned. So that's our internal plan, which we typically don't disclose. But let me assure you again that we're taking care of things on all fronts so that our growth stays consistent.

Jyoti Gupta analyst
#154

I'm sure you will, sir. So my hope is that across the coming 5 years, you'd be focused on the top two — or top two to three — technology platforms or products where you believe you're able to meaningfully alter Bell's revenue profitability profile.

Manoj Jain executive
#155

Well, it’s not just two or three. There are at least 8 to 10 distinct high-end, technology-driven programs, and we’re putting at least 200/CR into each of those technology programs. So they span nearly all the major areas where Bell is currently a leader. So to keep being a leader, we need to invest well in those products and technologies. So that’s what’s in our technology roadmap plan. We don’t formally disclose that plan. But at various technological forums, we mention it to all of you indirectly. Maybe on a future occasion, when this kind of technical event is organized by you, we will definitely come out and give you those project details.

Jyoti Gupta analyst
#156

Excellent. As for the remaining questions, I’ll go over those with you separately. Thanks very much.

Manoj Jain executive
#157

Thanks.

Operator operator
#158

Shall

Manoj Jain executive
#159

Do we have any closing remarks, madam?

Operator operator
#160

Yes sir. That brings today’s questions to an end. At this point I’ll turn the conference back to management for their closing remarks.

Manoj Jain executive
#161

Right. So, as we shared regarding the outlook for year 2627 — after factoring in our current base, the product mix we have now, our existing order book, and so on, and keeping in mind all the other challenges and geopolitical situations — we are holding to revenue growth of more than 15%. So for 2627, we will definitely see revenue growth above 15%. EBITDA margins will exceed 28%. Order inflow for this year, we expect, will be above 55,000 crore. That of course includes QRFM, which we anticipate very soon. We have steadily raised R and D investment over the last two years to keep pace with technology and to move into new areas of business operation. So this year we have set a target of roughly 2,200 crore rupee of investment in RD. The same applies to capex, again 20 plus percent growth. So we are targeting more than 1200 crore rupee of capital investment this year. And the defense to non defense ratio will be more or less 90 to 10, maybe plus minus 1%. It could vary depending on our new plans for the non defense business. But that will.

Manoj Jain executive
#162

We'll let you know partway through the year if there's any slight change. But right now, the guidance stands at 90, raised to 10, for the defense and non-defense business. So that's my guidance for the year as a closing remark. Thank you.

Operator operator
#163

On behalf of Bharat Electronics Ltd., thank you. That brings this conference to a close. We appreciate your participation. You can disconnect your lines at this point.

Analyst analyst
#164

Thanks. Thanks.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Bharat Electronics Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Bharat Electronics Limited earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.