Home / Transcripts / Bharat Electronics Limited (500049) · October 31, 2025

Bharat Electronics Limited (500049) Earnings Call Transcript

October 31, 2025

BSE Limited IN Industrials Aerospace and Defense earnings 59 min

Earnings Call Speaker Segments

Operator operator
#1

Good day, everyone, and welcome to the Bharat Electronics Limited Q2 FY 2026 Earnings Conference Call. Please note that all participant lines will remain in listen-only mode, and you'll have a chance to ask questions once the presentation wraps up. If you require assistance at any point during this call, just signal an operator by pressing star, then zero, on a touch-tone phone. I'll now turn the conference over to Mr. Vikash Singh from ICICI Securities. Thank you, and over to you, sir.

Vikash Singh unknown
#2

Good evening, everyone. Speaking for ICICI Securities, I extend a warm welcome to all of you on this conference call covering Bharat Electronics' Q2 FY 2026 results. We are grateful to the management for the chance to host them. Representing the management, we have with us Mr. Manoj Jain, Chairman and Managing Director, along with Mr. Damodar Bhattad S., Director of Finance and CFO, and his team. So, without spending too much time, I'll pass things to Manojji for his opening remarks. The floor is yours, sir.

Manoj Jain executive
#3

Thanks. Good afternoon, everyone. Let me walk you through the financial highlights for H1 — that means through Q2 of financial year 2025 to 2026. In this H1, we achieved revenue from operations. We raised it to INR 10,180 crore, versus INR 8,782 crore through Q2 of the prior year, a growth of 15.92%. Profit before tax rose to INR 3,023 crore through Q2 of this year, compared with INR 2,488 crore in the same period last year, a growth of 21.51%. Profit after tax climbed to INR 2,255 crore through Q2, versus INR 1,867 crore through Q2 of last year, a growth of 20.77%. EBITDA went up to 30.15%, compared with 27.26% through Q2 last year. Earnings per share rose to INR 3.09 through Q2 of 2025 to 2026, versus INR 2.55 through Q2 of last year. The order book position as of 1st October 2025 stands at INR 74,453 crore, and as of today it has reached INR 75,600 crore. Orders acquired till 1st October 2025 in this financial year total INR 12,539 crore, and till today they total INR 14,750 crore.

Manoj Jain executive
#4

All told, when you look at every financial measure, we've seen solid growth, and the company intends to maintain the guidance we provided at the start of the year. That's the short version of the financial highlights for H1 2025 to 2026. Hello. That wraps up our highlights. We can now begin questions and interactions.

Operator operator
#5

Thanks so much. We'll now move into the question-and-answer portion. If you'd like to ask something, you can press star and one on your touch-tone phone. Should you want to take yourself out of the queue, press star and two. We ask that participants use handsets when posing a question. Ladies and gentlemen, we'll pause briefly while the queue is put together. Our first question comes from Dipen at PhillipCapital. Please go ahead.

Dipen Vakil analyst
#6

Hello, and thanks for taking my question—great results, congratulations. First, I'd like to ask about the order book, sir. At present, our EBITDA margin stands at roughly 28%-29%. What type of execution are we concentrating on so that this EBITDA margin stays elevated, and do we anticipate it holding at comparable levels in the future as well?

Manoj Jain executive
#7

Sure. Product mix in H1 and H2 is roughly comparable, and as we said before, even though our mix spans over 350 main equipment items — with sub-equipment and line items exceeding 1,000+ — we are fully diversified across different functional areas of defense electronics. Given that mix, we feel there may not be too many changes between H1 and H2. EBITDA margins should stay roughly similar, and the guidance we have provided — more than 27% EBITDA — we are confident of achieving by year end.

Dipen Vakil analyst
#8

Understood, sir. For my second question, I'd like to follow up on what you just said: currently, those emergency procurement orders are anticipated, and a few large product value items are expected as well in the second half. Could you give us a sense of which orders are in advanced stages of finalization that we can expect during the second half?

Manoj Jain executive
#9

Sure. As we mentioned during the previous quarter as well, we anticipated a solid volume of emergency procurement orders. To date, we have already secured 11 such orders, emergency procurement orders valued at approximately INR 1,350 crore, and roughly INR 2,000 crore of emergency procurement orders remain in the pipeline where PMCs have been finalized, and we expect most of them within the coming 2 weeks. We will receive them. That covers the emergency procurement order. Regarding our other major orders in the pipeline, we have discussed QRSAM. We remain hopeful — fully confident — that ahead of March, we could secure the QRSAM order. We have already submitted our RFP response and so on, so cost audit and other activities are proceeding according to procedure, and we are confident of accomplishing that by March. Besides QRSAM, the Shatrughat and Samaghat projects, the NGC-related Next Generation Corvette-related subsystem orders from shipyards, the additional LCA 97-number order from HAL for our avionics packages, Shakti, GBMES, Mountain Radar, HAMMER and the like — all these orders, large orders, are in the pipeline, which will certainly bring our overall score to what we committed to you: INR 27,000 crore. We are confident we will certainly achieve order receipts exceeding INR 27,000 crore during this financial year, apart from QRSAM.

Dipen Vakil analyst
#10

Understood, sir. This is the final question, sir. At present, within your order book, what portion of the current order book comes from the top 10 or top 12 large contracts? Primarily the LRSAM fuses, the Akash missile system, and similar items?

Manoj Jain executive
#11

What portion of the order book is still outstanding on those orders, or what exactly are you asking?

Dipen Vakil analyst
#12

Yes, yes. That pending order book.

Manoj Jain executive
#13

As of 1st October 2025, the order book stands at INR 11,025 crore. LRSAM accounts for roughly INR 5,000 crore. Electronic fuses come in at about INR 4,500 crore. BMP-2 upgrade is INR 3,000 crore. Akash army is INR 2,700 crore. Adding all of these together — the top seven orders we currently have listed — the total reaches approximately INR 25,000 crore. Those top seven orders make up INR 25,000 crore. Of the 1st October order, about INR 24,000 crore.

Dipen Vakil analyst
#14

Understood, sir. Thanks a lot for taking my questions, and best wishes for the second half.

Manoj Jain executive
#15

All right, thanks.

Operator operator
#16

Thanks. Our next question comes from Amit Dixit at GS. Please go ahead.

Amit Dixit analyst
#17

Good evening, everyone, and thanks for the chance to speak. Congratulations on a strong set of numbers. I have a couple of questions. The first one concerns Project Kusha or Sudarshan Chakra — where exactly do we stand on that project, how is development progressing, and when might we see some kind of order coming from it?

Operator operator
#18

Could you speak up just a bit, Mr. Dixit?

Amit Dixit analyst
#19

Right.

Manoj Jain executive
#20

I can read you fine. There was no problem — your voice came through clearly to us. Just to give you a quick recap: as we mentioned before, Kusha is a DRDO program, and for DRDO we serve as the development partner on the major subsystems of Kusha, chiefly those tied to radar and control. On the radar and control side, there are some three types of radars plus two types of control and communication centers, along with launchers, support vehicles, and so on. At present we are jointly carrying out this radar-related prototype development with LRD, which is DRDO's partner on the radar side. DRDL oversees the program as a whole. Together with DRDL, we are in discussions regarding the control center and communication system modules. Right now, these five major modules of the program sit at the prototype development stage. System integration comes after that, and only then will integrated trials be planned by DRDO, with BEL providing strong support to them. My sense is that all these trials and so forth come after prototype development, which by itself will take us another one more year, and following that comes integration, testing, trials, and after all of that it moves into what I would call the production phase.

Manoj Jain executive
#21

We expect that order to come by December 2029 — that would be our first production order. As things stand today, what we've received is a prototype development order. So we'd be moving from that prototype development order to the actual large production order, which will hopefully be worth more than the QRSAM order we're anticipating, and we expect that by the December 2029 timeframe.

Amit Dixit analyst
#22

That's quite useful, sir. Now, regarding the second question — it concerns the recent AON issued, worth roughly INR 79,000 crore. Various platforms were involved there, along with some electronic systems. I just wanted to get a sense of what BEL's approximate share might be in that INR 79,000 crore?

Manoj Jain executive
#23

Since it's only at the AON stage, it hasn't turned into RFPs yet. RFPs are also moving along—some we'll get straight ourselves, like the GBMES project RFP, which we're receiving directly and will continue to receive. Other RFPs will go to a different system integrator, and we'll pick up our electronic share from that. So we can't give you a quantified figure, but within this AON, three to four main leads or main products of BEL will be included. We can expect on the order of INR 10,000 crore worth of items, and we may get orders, though the order might not come directly from the user. It could also come from a system integrator. At that scale, I expect only one or two will be direct orders for us, while the rest will reach us as indirect orders.

Amit Dixit analyst
#24

Alright, sir. That's really useful. Thanks a lot, and best of luck.

Operator operator
#25

Thanks.

Manoj Jain executive
#26

Thanks.

Operator operator
#27

Since so many of you are still waiting in the queue, I'd ask that each participant limit themselves to just two questions. We'll now take a question from Umesh Raut of Nomura, who is on the line. Please go ahead.

Umesh Raut analyst
#28

Good evening, sir, and congratulations on a very strong set of numbers. My first question concerns the order inflow guidance of INR 27,000 crore for FY 2026, excluding QRSAM. Within that guidance, are we assuming any orders from Next Generation Corvette or from the avionics packages tied to the recent ordering for Light Combat Aircraft?

Manoj Jain executive
#29

Sure, absolutely. As I mentioned, with these NGC partial orders — since NGC overall has such a large number of BEL components — for certain of those component orders, we're expecting roughly INR 4,500 crore in value of orders during this financial year from the NGC program as a whole. The rest of the orders, possibly valued at around INR 8,000 to INR 10,000 crore, we might receive only next year, since configuration and other finalizations for those are still underway. The finer details for those subsystems are still being worked out. On LCA, we're expecting that within another 1 to 1.5 months, hopefully we'll receive this order from HAL for the avionics package covering all the items for this 97 aircraft order. That could be approximately INR 2,500 crore, plus or minus something.

Umesh Raut analyst
#30

Got it, sir. Sir, my next question concerns the AMCA program. Now that you're working with L&T on taking part in the RFI, I'd just like to get a sense of how your scope would differ from a program such as LCA, or, let's say, the helicopter programs — what sort of supply you currently provide to HAL. In the case of AMCA, how would the scope be different, kind of? If you win the AMCA contract, can we assume a relatively far higher share when it comes to addressable market, in terms of, say, the development program?

Manoj Jain executive
#31

Yes, absolutely — that's the deliberate strategic step we've chosen to take, moving beyond merely providing electronics for helicopters under the LCA kind of program. Could we reach a higher degree of integration, or add greater value at the airborne platform level? We identified AMCA as the first major opportunity, which is why we partnered with L&T. Together as a consortium, we've already submitted our RFI response for it, and we're hopeful about qualifying and perhaps securing orders down the line too. That is definitely what we're aiming for. In that role, we won't just be supplying the avionics or electronics piece — it will also involve system integration, aircraft integration, testing, validation, and work of that kind, essentially treating the aircraft as a platform. That's the kind of role we wanted to expand into within programs of that sort. For AMCA or UAV-type programs, our goal is to grow our value addition from the traditional electronic modules toward contributions at the systems level.

Umesh Raut analyst
#32

Got it. Let's say a different consortium ends up winning that contract — in that situation, do you believe you'd be able to provide avionics packages, or other packages, to those consortia within the AMCA program?

Manoj Jain executive
#33

Yes, absolutely — this program is DRDO-driven, and ADA serves as the lead agency for it. Across more than 20 or 30 years of working with them at the R&D level, we've been building numerous modules and subsystems tied to electronics for ADA. All the consortia will take these subsystems. Whoever ends up winning this program, the orders for these modules have to route through BEL alone, since our capability there is proven, and we've already developed — or are in the process of developing — these prototypes jointly with ADA and ADE. In any case, that share of the modules will stay with us. As I said, we wanted to move up the value chain by also offering system-level solutions and system integration expertise, and we wanted to build that in this critical segment. That is the reason we've taken this consortium-based approach to bidding as well.

Umesh Raut analyst
#34

Got it, sir. Thanks very much, and all the best to you. I'll get back in the queue.

Operator operator
#35

Thanks. Our next question comes from Mohit Pandey at Citigroup. Your line is open.

Mohit Pandey analyst
#36

Good evening, sir, and thanks for giving me the chance. Sir, my first question is about QRSAM. After the order comes in, what kind of execution timeline would we be looking at, sir? Would 3 to 4 years be a fair assumption?

Manoj Jain executive
#37

No, it’s somewhat longer than that, mainly because this program is extremely complex—that’s the first point. The second point is that we chose to carry out an additional round of thorough assessment. We refer to this as the initial production-module trials, or oblique evaluation. We also wanted to conduct it jointly with our user’s FOPM trials. Through that trial, we aim to demonstrate several more advanced extra features and determine whether they are genuinely mature enough for the production phase, since the prior phase was a prototype phase. When we move from prototype phase to production phase on larger programs, we typically insert an FOPM stage. This program likewise includes an FOPM stage. As a result, the total program timeline will be roughly 5 to 6 years of overall execution time for this program.

Mohit Pandey analyst
#38

Got it, sir. All right. The second question concerned the DAC approval. Besides the INR 79,000 crore, two other approvals came through this year as well. Two other sets of approvals. Could you share what size BEL might be in play for from those other two as well? That came to roughly, I believe, INR 1.4 lakh crore. INR 140,000 crore?

Manoj Jain executive
#39

Absolutely — in that case, QRSAM was, of course, the largest program. Beyond QRSAM, there were Shatrughat, Samaghat, and numerous other projects that fell under that, along with plenty of other naval ship programs in which the shipbuilders will pass orders back to us. Taking all three together, and counting QRSAM as well, we are certainly looking at more than INR 50,000 crore in orders for BEL.

Mohit Pandey analyst
#40

Got it, sir. Sir, the final question concerns CapEx. Reports in the media said that BEL might carry out CapEx in Andhra Pradesh of roughly INR 1,400 crore, with a further CapEx phase in that state after that. Do you have any comments on this, sir? What might that CapEx relate to?

Manoj Jain executive
#41

Alright. This has also gotten coverage in the media, because we held a detailed discussion with the Andhra Pradesh government, and we've made our commitment to them. On that basis, the Andhra Pradesh government has actually made a commitment jointly — on our behalf and on the AP government's behalf — to our Raksha Mantri sir as well. That is the biggest investment we are undertaking, and we refer to it as DSIC. This stands for Defense System Integration Complex, where the main thing we're producing is the QRSAM program, which will come out of that facility. Beyond that, there will be numerous other activities and other strategic business units too that we are going to relocate or going to run from there, including the unmanned systems, missile systems, and military radars. Those kinds of subsystems will also be built there. Beyond that, the biggest item will be the QRSAM program — system integration, testing, validation, qualification — all of that related infrastructure we are going to have at that site. It's roughly 920 acres of land, and with an investment of a minimum of INR 1,400 crore, which we have already committed. Should it be needed, we are not hesitant to put in more money in case other programs — other complex, bigger programs such as Kusha and others — come up in time; we have good space there to make further investment if required.

Damodar Bhattad executive
#42

I'd just like to build on what the Chairman said — this investment is going to be made across 3 to 4 years.

Mohit Pandey analyst
#43

Okay, okay, okay. Got it, sir. Thanks a lot, and all the best to you, yeah. Thanks.

Operator operator
#44

Thanks. Our next question comes from Jyoti Gupta of Nirmal Bang, on the line. Go ahead, please.

Jyoti Gupta analyst
#45

Thank you, sir, for giving me the chance. Those are excellent figures. I have two questions. First, I believe that in FY 2026 our EBITDA margins should end at close to 28%+, since that is the assumption I made given the order book you have. Second, this is really a question with two parts. The first part: the LCA Mark 1 recently handed over to the Indian Air Force was essentially turned down, with the claim that there were some spoilers in the avionics and that the radar from Israel is possibly inadequate. Does that mean that, since we know the first batch of our 41 LCA was meant to have Israeli-built EI ISR radars, we now stand to benefit, in that we would now be integrating our own ISR radars, which of course you are actually producing? The second part: what concerns exist on the avionics side for the LCA Mark 1 that led to this sort of discomfort within the Indian Air Force regarding the LCA Mark 1?

Manoj Jain executive
#46

Okay. Can you hear me?

Jyoti Gupta analyst
#47

Yes, sir.

Manoj Jain executive
#48

Right, that's clear. So EBITDA, as we said at the start, will definitely come in at around or above 27%, and we keep working toward that. Through various kinds of cost optimization and indigenization — as we mentioned last time as well — we have these activities going on continuously for cost reduction, indigenization, and improving our operational efficiency. With that, we're confident we will definitely be above 27%. Now, turning to LCA Mark 1A. LCA Mark 1A, as you know, is a program steered by HAL, not by BEL. BEL is a very good strategic partner for HAL. In this, all the major avionics, all the basic avionics-related electronics, which are typically designed by ADA, ADE, and other DRDO labs — of course, BEL was also part of the design, and now BEL is the production agency for that. These items we are supplying for LCA, and we have no concern on these avionics parts. Because for these avionics parts, full design information is available with BEL. Of course, the software is jointly held by BEL and DRDO. Hardware and hardware obsolescence and everything is, again, spearheaded by BEL, with BEL supported by DRDO. There is no concern about avionics.

Manoj Jain executive
#49

As we've suggested both indirectly and directly, the sensors—radar and EW sensors—were foreign-origin when the program began. Back then, indigenous sensors of this type at space-grade and airborne-grade simply weren't obtainable. That was a joint decision by DRDO and HAL. BEL's role was mainly on the review side, if anything at all. BEL wasn't in the driver's seat when it came to choosing these. BEL only ever provides developmental-level support; it isn't the decision maker. The decision maker is normally the designer—the original designer being DRDO, ADA—along with a production agency, which is HAL. Those two alone made that call. The question really belongs to them, whatever it is. As you said, and as we electronics professionals also understand generally, yes, there were some issues, and our indigenous radar and sensors are still undergoing the final stage of trials and evaluations. At the right moment, HAL management will make the call to swap out this foreign sensor source for the indigenous one. That's going to happen very soon. The final decision and the final evaluation status for this indigenous sensor will come from HAL, not from BEL.

Jyoti Gupta analyst
#50

Right, that's the reason—since the radar we build domestically outperforms the L&T system based in Israel that we've been procuring, sir. So my view is that a real opportunity exists here, a very big one for BEL, when it comes to radars.

Manoj Jain executive
#51

Definitely not. It’s a BEL opportunity, but the choice between indigenous and foreign will be made jointly by DRDO and HAL. Whenever they make that call, drawing on all the inputs, every evaluation report, and everything else, BEL will certainly benefit. I know that.

Jyoti Gupta analyst
#52

Yes. Absolutely. Perfect. That is a great response. Just one more item, sir — a final question, if I may. Is there any opportunity we see as India-China flights resume, particularly regarding superalloys and any special metals we source from China? Does that improve our circumstances in any way and assist any sort of strategic alliance when it comes to moving these rare earth metals?

Manoj Jain executive
#53

To clarify once more, Bharat Electronics — BEL — isn't at present engaged in any direct way with rare earth metals, alloys, or similar materials. Naturally, for a program such as AMCA, migration is something we will ultimately have to undertake. As things stand right now, our focus is chiefly on defense electronic systems, subsystems, and components. That particular area, as of today, falls more squarely under HAL and MIDHANI. Certainly, as time goes on and we get nearer to adding overall value across the various subsystems for AMCA or other programs, this will become a concern for us too. When that day arrives, I'll be in a position to give you a proper answer. For today, though, I'd ask that this question be directed to MIDHANI or HAL.

Jyoti Gupta analyst
#54

Alright, thank you very much, sir. That was really useful. Thanks, and best of luck.

Operator operator
#55

Thanks. I'd ask that everyone stick to two questions each. We'll take the next one from Atul Tiwari at JPMorgan. Go ahead, please.

Atul Tiwari analyst
#56

Yes, sir, thank you very much. My first question concerns the possibility of significant order inflows coming in beyond QRSAM. Once QRSAM is secured by the end of this year, the next one we are aware of is Project Kusha, perhaps by December 2029. In the interval between those two sizable orders, might there be other large orders of comparable size that could potentially materialize?

Manoj Jain executive
#57

It's definitely not going to be a single order of INR 30,000 crore or INR 40,000 crore. Like we mentioned previously, an order of that size — the INR 30,000 crore or INR 40,000 crore kind — only shows up once in 4 or 5 years, since building those kinds of large systems takes that much effort. Naturally, INR 2,000 crore to INR 5,000 crore of assorted products or assorted orders are in the pipeline for us over the next 2 to 3 years. Those will continue to come in. A big large program such as Kusha or QRSAM — that type of program — as of now, isn't there in our roadmap. Even without that big program, definitely, each year we are going to have INR 25,000 crore, INR 30,000 crore, INR 35,000 crore worth of products or new orders, where an individual order may be of the order of — you can assume — roughly INR 5,000 crore per individual order.

Atul Tiwari analyst
#58

All right, great. My second question concerns your interest in AMCA. Could you possibly give us some color on what's expected of the winner here? Specifically regarding the CapEx you'd need to undertake to create these facilities, and the technology risk you'd be taking on — any color there? I mean, how much would you have to spend to build these facilities? Obviously, as things stand now, you don't have anything at all when it comes to system integration for fighter aircraft.

Manoj Jain executive
#59

At this point, anyway, we also debated and discussed when we took this strategic call—when we have to invest, and how much we have to invest. Definitely, that is a question investors also will be worried about. Let me tell you, the AMCA program for the next few years, 6 to 8 years, is mainly still realizing five prototypes with the total support and handholding and driving by DRDO. It is DRDO and this consortium partner jointly will do, and they will use all the infrastructure which is created by DRDO for this purpose. As such, for the next few years, 5 to 8 years, we are not expecting big CapEx investment. Of course, for some module testing or some jigs-related infrastructure, which is definitely much less than the final CapEx infrastructure, maybe maximum INR 100 crore-INR 200 crore, is what we may have to do investments for jigs, etc., in the next 5 to 8 years. No big CapEx is planned as per the project plan, which is shared by ADA as part of the RFI. Although more clarity will come when they will evaluate all of us and then issue RFP. RFP will further quantify this aspect. As per RFI, which we have received and we have analyzed all of us, the CapEx is not expected.

Manoj Jain executive
#60

We don't anticipate significant capital expenditure being needed to finish this initial phase, which is the prototype phase covering realization of those 5 aircraft.

Atul Tiwari analyst
#61

What's the timeline for announcing the final winner, and when do you expect the first prototype to be rolled out?

Manoj Jain executive
#62

No, prototypes in various forms and shapes have already been produced by ADA. One is for RTS testing, another serves some other purposes, and so on — those they have made. The first actual prototype, incorporating all the electronics and other subsystems under this program, is, I think, something ADA plans on another 1, 1.5 years timeline — the first prototype. Then improvements to that, then a second, then a third, then a fourth, then a fifth. Five prototypes in total will come out. The final timelines are really decided by ADA. At the macro level, we know that. That is why this evaluation, right now, this RFI evaluation, I believe. Committees have been constituted, and they are evaluating the proposals submitted by all of us. They have to decide when they will finish this activity. We are only hoping that another 3 months-4 months, by February, March, we may expect this qualification of the RFI phase will be over. These are all our expectations. Exact figures, either ADA can tell or that committee can tell. We are not party to that committee or to ADA.

Atul Tiwari analyst
#63

That's great. I really appreciate your response. Thank you.

Manoj Jain executive
#64

Alright.

Operator operator
#65

Thanks. Our following question comes from Sumit Kishore at Axis Capital, whose line is now open — please proceed.

Sumit Kishore analyst
#66

Good evening. I'd like to talk about how well Bharat Electronics has done. My first question concerns the execution cycle for the order backlog, which appears to have shortened. Broadly speaking, your backlog hasn't increased across the last 18 months. Revenue growth has kept going at mid-teen levels. This quarter was even stronger. In what ways has the character of that contracting backlog actually shifted? Is it just that you're executing better? What has caused this kind of compression in execution? That's my first question.

Manoj Jain executive
#67

Here's the situation: we've gone through every one of the contracts we currently hold. Right at the start of the year, we get together and lay out our plans, working out how we can deliver within the PDC for each one. The reason is that deliveries on these orders are staggered. No single order covers just 1 year. Certain orders run 3 years, others 4 years. So within that, what's our commitment for this year under the contract? We've completed the full planning — whatever had to be supplied by this March 2026, we've already built into our roadmap. Execution plans are in place. We review them periodically. We're confident we'll achieve it — maybe not 100, but we're targeting 100%, though we'll land somewhere between 90%-100%. On-time delivery is what we're expecting right now. Over a period of time, we ultimately want to make it truly 100%. As you know, in the electronics market there are associated challenges around obsolescence, around some other issues, and around component availability especially. Because of that, some minor variation or minor surprises keep occurring for us. That shouldn't impact more than 5%-10% of our deliveries. So 5%-10% of deliveries may overspill by a few months. As things stand, we've planned right now that all 100% of our committed timelines within this execution order are going to be achieved.

Sumit Kishore analyst
#68

Alright. In an earlier reply, you said the product mix in H2 will be as favorable as it was in H1. So, apart from QRSAM entering your books, does the product mix actually shift in the next financial year? And how should we think about the revenue and margin booking profile for QRSAM as it gets executed over the next five, six years?

Manoj Jain executive
#69

To start with, regarding next year, I really don’t see any shift in product mix as such. With QRSAM next year, we’ll only be building the prototype. And this prototype is, again, a sellable prototype, I should say. That’s why it’s called the first of production model. I shouldn’t call it a prototype. It’s a first of production model, and that first of production model will need a minimum of 12 months-18 months to realize, since it is a very, very complex system. Next year, we aren’t expecting any turnover or business from the QRSAM program. Only the year after next may we be able to sell it, if we successfully complete all the FOPM trials, etc. Over a period of time, QRSAM as such is also similar to our existing product mix only. We don’t have a big difference between QRSAM and other programs. Our overall product mix may not change that much. Right now, although we are supplying so many types of radars, so many types of missile systems like Akash, Akash Prime, Akash Export, QRSAM will be one more feather in our cap only. As such, product mix may not change that much, and it may not affect our other margins, EBITDA margins, etc., that much, which is what we feel over a period of time.

Manoj Jain executive
#70

As time goes on, the mix of products overall, the diversification overall, the other subsystems overall, and so on are going to make that mix broad enough to handle various kinds of shifts within a single subsegment or segment.

Sumit Kishore analyst
#71

Understood completely. During the 12 to 18 months following receipt of the QRSAM contract, it's possible you won't record particularly meaningful revenue from it.

Manoj Jain executive
#72

Right, right. Since that represents the FOPM realization time in our case.

Sumit Kishore analyst
#73

Got it — thanks. One last point to clear up. Through the first half of the fiscal year, where do working capital and receivables stand?

Operator operator
#74

I'd like to get back in line for a follow-up question, since quite a few participants are still waiting in the queue.

Sumit Kishore analyst
#75

Sure. Thanks.

Operator operator
#76

Thanks. Our next question comes from Amit Anwani at PL Capital. Your line is open.

Amit Anwani analyst
#77

Thanks a lot, sir, and I appreciate the chance to ask. My first question concerns the eighth pay commission, whose terms of reference, as I understand it, have now been approved by the government. What I'd like to get a sense of is how you assess the size of the increase you expect once this eventually takes effect. Would it come in above or below what the previous pay commission delivered? Do you have any view on the eighth pay commission at all, and in which financial year would its impact first begin to show up or be felt?

Manoj Jain executive
#78

I want to clarify this once more. I believe someone else raised this question previously as well. The Eighth Pay Commission does not apply to public sector undertakings. It isn't meant for us. It covers central government employees. In our case, there will be a fourth PRC, since the third PRC existed previously. That committee's recommendations will take effect from 01/01/2027. As for that PRC, the government has not yet set up the committee. For the PRC — the fourth PRC — the government will form a separate committee. It will issue the broad guidelines for public sector employees. Once they complete their study, individual PSUs will have considerable flexibility to adapt. We are a business entity, and we will act on the basis of our business situation, our track record, our profitability, and our anticipated growth. They are granting us substantial latitude to make decisions inside the general framework. Our framework is going to differ considerably from the Eighth Pay Commission's framework. As we've said, regarding the Eighth Pay Commission and the expectations surrounding it, my sense is that a central government employee is in a better position to guess those than those of us in public sector undertakings.

Amit Anwani analyst
#79

Okay, so, sir, based on your framework, if we’re talking about any quantum, how much of an increase could actually happen?

Manoj Jain executive
#80

That's purely a guess. As PSU employees, I don't think we ought to respond to that. Normally, we don't even analyze it. For us, the quantum — our reference point is 01/01/2027, and that's TRC. We only have to look at what more we might get, based on moving from the third PRC to the fourth PRC. On that, I can say my wish is definitely tied to the salaries we're drawing on 01/01/2027. At minimum, we're expecting salaries 10%-15% higher from that.

Damodar Bhattad executive
#81

Regarding your question about financial flows, the impact for 2026 to 2027 will last only 3 months—from January through March, since it starts in January. Then for 2027 to 2028, yes, the pay revision effect will be present. Growth in volume along with the increase in turnover quantum will absorb all of these expected increases.

Amit Anwani analyst
#82

Yes, sir, regarding QRSAM — you mentioned it would take 18 months. As I understand it, there are three regiments, and each one has roughly 72 missiles and launchers. Once we get past 18 to 24 months, how will the production stage look? Would it be something like one regiment every 1.5 to 2 years? I'd like some clarity on that. And what exactly is the direct scope of work, since there are missiles as well as launch vehicles, and I believe we act as integrators? Within this INR 30,000 crore, what percentages represent the direct scope of work?

Manoj Jain executive
#83

Right. So first off, as you mentioned, the delivery schedules are already going to be spelled out in the RFP that's reached us. Typically, that's kept confidential for strategic reasons. Naturally, there are two phases, as I said. The first is the FOPM phase, which takes 12 to 18 months to realize, followed by some evaluation time — that could run three months or longer than three months. I can't put an exact number on it. Only after that do we begin production. Depending on risk — both business risk — and strategic necessity, we usually kick off production-related activities for that phase somewhat earlier as well. The overall timelines come to roughly 5 to 6 years, as I already mentioned. There will be parallel production for the Army and the Air Force. As you're aware, the order splits more or less 50/50, you could say, between Army and Air Force in this program. Production will run in parallel for both, so we can begin equipping the Army and the Air Force simultaneously. That's our plan. As you noted, yes, we serve as the main system integrator here, and BDL is our principal strategic partner for missiles. Beyond BDL, we have three, four major stakeholders, who supply us with certain other subsystems — launchers, TR modules, and other subsystems — for integration.

Manoj Jain executive
#84

Radars make up the main subsystems—there are two kinds of radar plus control centers. That integration is certainly something we will handle ourselves. As for launchers and similar items, our main focus is on basic integration only; beyond that, they come along. During the prototype stage already, we have addressed this, and the roles and responsibilities of BEL, BDL, and the other stakeholders have already been quantified. Every one of them knows about it. We have already held multiple rounds of sensitization meetings with all our key stakeholders. That is why we are fully prepared to realize FOPM. In FOPM as well, every stakeholder has to work together, and for the production phase too. Sensitization for all the stakeholders has already taken place. Delivery schedules, what is expected from them, and so on, have been chalked out. We are confident that once we get the order in a time-bound manner, as indicated in the order, we, together with our stakeholders, will definitely supply on time.

Amit Anwani analyst
#85

Thank you, sir. Congrats on those strong results. Appreciate it.

Manoj Jain executive
#86

Thanks.

Operator operator
#87

Thanks. Our following question comes from Shirom Kapur at Jefferies. Please proceed.

Shirom Kapur analyst
#88

Hello, sir. Thanks for the chance to speak, and congratulations on such strong results. My question concerns your exports. We understand that exports are also part of BEL's strategy. I wanted to check specifically on our exposure to Myanmar and whether it will likely stay well below 5% of total revenues and is not necessarily going to become material for the company going forward.

Manoj Jain executive
#89

Yes. As we mentioned before, exports are a somewhat different challenge since they call for a different skill set. Realizing the full order involves a range of other hurdles, such as LC opening and similar matters. At present, we are aiming for 3%-4% of our turnover to come through exports. We are confident that over time, within the next 2 to 3 years, we will definitely reach 5%. Our long-term vision is to raise the share of turnover derived from exports to 10%. A number of activities are planned to grow the export portion of our overall turnover. We are confident about those activities and initiatives we have already undertaken and those we are going to undertake. We are confident that we will stay on the right path to raise the percentage of our export turnover year-on-year and ultimately reach 10%. Today we also have a very good, healthy order book, at around $326 million. We have a U.S. million order book with us. We also have very good leads. We are confident that whatever path we have laid down for our continuous year-on-year export growth, we are on the right trajectory. We will keep delivering better and better results on the export fronts as well.

Shirom Kapur analyst
#90

Understood, sir. Purely from a strategic standpoint, once we reach that point and are targeting the 10% figure, might a substantial share of that total revenue — 5% — carry similar exposure to Myanmar as well? I just wanted to get a sense of that.

Manoj Jain executive
#91

I mean, the way we see it, any nation that matters strategically to us and that’s interested in buying our products, depending on how mature those products are, gets the same level of priority as every other such opportunity. Myanmar was one of those opportunities too — we had supplied some equipment there before. Some talks and other activities are still underway there as well. To us, every single country counts. For us, it isn’t about one country or a second country in particular. We treat each export opportunity with a great deal of seriousness. We travel there, make our presentation, hold discussions, work out the numbers, and then make sure our product goes in and backs their initiatives.

Shirom Kapur analyst
#92

Understood, sir. Could you walk us through the execution for 2Q and 1H that produced your 26% growth in 2Q and 16% growth overall in 1H — which major programs drove that execution? For this coming total.

Manoj Jain executive
#93

Yeah. So what we've executed so far — okay, okay, okay — cumulatively through Q2, six to seven major programs have contributed. The one that's always at the top over the last few years is the Navy's LRSAM program. Himshakti came second. Our battle surveillance system for the Army was third. Akash Army was fourth. Fifth was LCA Mark 1 LRUs, the avionics-related modules. Sixth was the LINK U2 fire control system. Seventh was the Shakti EW system. Those seven systems made up the major orders we've executed, worth roughly INR 4,000 crore. Got it, sir. Thank you so much and all the best.

Operator operator
#94

Thanks. Our next question comes from Harshit Patel of Equirus Securities, on the line. Please go ahead.

Harshit Patel analyst
#95

Thanks a lot for the chance, sir. First off, can you bring us up to speed on the Archer UAV program and where our roadmap stands?

Operator operator
#96

Mr. Patel, could you speak up just a bit? We're having trouble hearing you clearly.

Harshit Patel analyst
#97

Hi there, can you hear me okay?

Operator operator
#98

Hi there.

Manoj Jain executive
#99

Hello. Yeah, go ahead. Honestly, the voice comes through to us somewhat better than the coordinator does, but keep going. We can hear you well enough.

Operator operator
#100

Go ahead, sir.

Harshit Patel analyst
#101

Can you update us on the Archer UAV program and what our part in it is? Where does the program stand — the different vendors, the finance system integrator, how big the project is, the timelines, and so on? The reason I ask is that L&T recently teamed up with General Atomics to take part in the 87 MALE UAV program, which is valued at nearly INR 30,000 crore. Will those be two programs competing with each other, or how is that going to play out?

Manoj Jain executive
#102

As you probably know, the Archer program is driven by ADE. We are their nominated development company production partner. With that status and that support, we have realized prototypes of Archer. I think the first successful trial of the Archer UAV took place just a few days ago, where it met all the parameters. Now we are in the process of refining it and seeing the market for it. Firstly, the prototype development has to be done, and then only can you market. Now the prototype development phase is more or less over. Formally, it will be declared by ADE because we are only the DCPP partner for them. Because we are the DCPP partner, we know this much development is done. A very good progress has already been made on the Archer UAV program. As you may know, Archer is not this MALE variety. The MALE variety, what you have hinted about, the L&T and GA association, that is a slightly different type of program. Archer is a much smaller and lower capacity UAV. Archer will not compete with this program. There is one more program, mostly announced by ADE, which is Archer NG. Archer NG is a program.

Manoj Jain executive
#103

Absolutely, we'd want a solid share in that program. It's possible we could even lead it. At this point, we don't know. From what's publicly available to us via ADE, that program is more or less in competition with this MALE UAV program. Again, that's a question you'd need to direct to DRDO or ADE — what exactly is Archer, and what is the Archer NG program? We're just passing along this input based on our own association. That program will definitely be competing with the L&T GA association. There are plenty of rival products in the MALE UAV space, and I believe an RFP has now been issued, or is about to be — actually, they've indicated the RFP will most likely come out next week. We intend to bid in that RFP as well. That's all I'm able to say right now. To do that, we'll need a great deal of strategic alignment — looking at and analyzing where our strengths lie, where our other consortium partners' strengths lie, and whether or not we should pursue a consortium. You'll likely learn all of that within roughly another 3 months. I can assure you that once we've made the decision to enter this AMCA or MALE UAV program in a big way, we will definitely devote all our efforts to making sure we deliver the right solution for this program too.

Harshit Patel analyst
#104

Got it, sir. Second, could you give us a rough split of your present order book—roughly INR 74,000 crore—across land-based, naval, and airborne systems? And if possible, a sense of the competitive picture in each of those 3 areas: where is competition heating up, where might we capture additional market share, and which areas are trailing the others on indigenization? That kind of detail would be very useful, sir.

Manoj Jain executive
#105

Let me put it this way: across Army, Navy, and Air Force we're more or less evenly balanced, both in terms of our product segments and our order book. All three segments are equally spread for us. We look at all three more or less the same way, because the core expertise in defense electronics components, systems, and subsystems is broadly similar. The evaluation or certification criteria do differ across the three, of course — in that respect, indigenization scoring is fastest on land systems, naval systems come second, and then airborne systems, which take somewhat longer to indigenize. Each segment brings its own small challenges, and so on. On the whole, for us, we're equally geared up across all three segments. We have separate SBUs focused on these segments. For instance, on the naval side there are five or six SBUs specialized in handling naval customers. The same holds for our Army customers — some SBUs are dedicated to that. For airborne too, we have two or three specific SBUs with a stronger focus on the Air Force as a customer. So we give nearly equal priority to all three, which are very important customers for us. That's also a unique thing about Bharat Electronics Limited: since we know Army, Navy, and Air Force, when it comes to interoperability across them, or theater command type of programs where integration or jointness across all three is needed, or large C4I programs where expertise from all three domains is very much essential, we are definitely a natural leader in that segment.

Manoj Jain executive
#106

So in that way only, roughly 20 years or 30 years ago, we had decided that all three segments should get equal opportunity, equal strength, and equal resources, since every segment is unique, but from where we sit, each one also shares a lot of commonalities.

Harshit Patel analyst
#107

Got it, sir. That’s really helpful, sir. Thanks so much, and best wishes going forward.

Operator operator
#108

Thanks. We'll take the next question from Hardik Rawat at IIFL Capital. Your line is open — go ahead.

Hardik Rawat analyst
#109

Thanks for the chance to speak. Nice work on those solid results. To build on what earlier participants asked, which projects do we anticipate carrying out during the back half of this fiscal year? I understand you covered the projects we've already executed, but which major projects do we expect to execute in that second half? Hello? Hello?

Operator operator
#110

Hello, sir. Are you there?

Hardik Rawat analyst
#111

Can you hear me okay?

Manoj Jain executive
#112

I was on mute there. I did catch your question. Over the next half, seven main programs stand in front of us. LRSAM sits at the top of that list, and Himshakti comes next, then Akash Army, after that Arudhra MPR Radar, followed by the D-29 EW system, then LRUs, avionics, LRUs for LCA Mark 1A, and electronic fuses. Those are the seven biggest projects we will be executing in H2.

Hardik Rawat analyst
#113

Understood. Sir, looking back at naval platforms that have been ordered, our typical share of the electronic subsystems involved has generally come in at roughly 20%-25% of the total cost. Should we expect a comparable order inflow from the landing platform docks announced recently, or from the amphibious assault vehicles for which the AON was granted not long ago?

Manoj Jain executive
#114

No. I'll be straightforward with you: with naval corvettes, other kinds of strike vessels and similar, plus these docking platforms, the configuration differs a bit. There will be far fewer large, complex, strategic electronic modules or systems in that. So we have plenty of other programs in the pipeline where our share will be larger. On this program, our portion of electronic modules will be smaller.

Hardik Rawat analyst
#115

Understood — that clears things up. One final point of confirmation regarding your earlier remarks. Please verify this: I believe you stated that among the AONs announced — the most recent three — which came to roughly INR 1.7 trillion for the earlier pair, plus the one announced quite recently at INR 79,000 crore, the addressable portion, or the potential order inflows that might reach us, would be approximately INR 50,000 crore — INR 40,000 crore from the two earlier ones and INR 10,000 crore from the recent one. Is that right?

Manoj Jain executive
#116

Yes, yes, absolutely. You've got that right.

Hardik Rawat analyst
#117

What does QR stand for?

Manoj Jain executive
#118

And that includes QR7.

Hardik Rawat analyst
#119

Including QR7.

Manoj Jain executive
#120

Yeah, yeah.

Hardik Rawat analyst
#121

Finally, regarding the GBMES project that was announced fairly recently, what fee value do you anticipate for it in terms of size?

Manoj Jain executive
#122

If I've got that right, it's roughly INR 1,500 to INR 2,000 crore.

Hardik Rawat analyst
#123

Understood — that’s genuinely useful. Thanks a lot.

Manoj Jain executive
#124

Yeah. All right.

Operator operator
#125

Thanks. We’ll treat that as the final question for today. At this point, I’m handing the conference back to management for their closing remarks.

Manoj Jain executive
#126

Like we mentioned, and given how things have gone in Q1 and, naturally, in Q2, we feel confident that whatever guidance we provided at the start of the year, we're on the right path to hit it. Once again I'll restate our commitment: on revenue growth, we will achieve 15%+. EBITDA margin, definitely 27%. Order inflow, as promised, excluding QRSAM, INR 27,000 crore. With QRSAM included, it comes to roughly INR 57,000 crore. R&D investment, over INR 1,600 crore. CapEx, above INR 1,000 crore, with a defense to non-defense business ratio of 90 to 10, our usual split. This guidance, definitely, we are going to achieve. That's our final comment for today.

Operator operator
#127

ICICI Securities speaking here — that wraps up today's conference. We appreciate your participation, and at this point you're free to drop off the lines.

Manoj Jain executive
#128

Thanks. Thanks, everyone.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Bharat Electronics Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Bharat Electronics Limited earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.