Bharat Electronics Limited (500049) Earnings Call Transcript
July 27, 2026
Earnings Call Speaker Segments
Good day, everyone, and welcome to Bharat Electronics Limited's Q1 FY ’27 Earnings Conference Call, brought to you by Motilal Oswal Financial Services. <<operator_script>> Kindly be aware that this call is being recorded. This conference might include some forward-looking statements regarding the company, and those are based on the beliefs, opinions, and expectations of the company as of today's date on this call. Such statements offer no guarantee of the company's future performance and could involve risks and uncertainties that are hard to predict. I'll now turn the conference over to Ms. Teena Virmani of Motilal Oswal Financial Services for the opening remarks. Thank you. Over to you, ma'am.
Thank you, Alfred. Good evening, everyone. I'm speaking on behalf of Motilal Oswal Financial Services, and I'd like to welcome all of you to this con call covering Bharat Electronics' quarter one FY '27 results. We appreciate the management for giving us the chance to host today's call. Joining us from the management are Mr. Manoj Jain, Chairman and Managing Director; Mr. Damodar Bhattad, Director Finance and CFO; and Mr. Sreenivas, Company Secretary. So, without spending too much time, I'll hand things over to Mr. Manoj for his opening remarks. Following that, he will open the floor for Q&A. Over to you, sir.
Thank you, madam. Good afternoon, everyone. We have just uploaded the financial results for quarter one. In fact, our board meeting wrapped up at 3:45, so the upload happened only after that, and you may not have had a chance to look at them yet. I will quickly walk you through the key highlights for quarter one of financial year ’26-’27. Revenue from operations rose to INR5,533 crores for Q1, against INR4,417 crores in the same quarter last year, a growth of 25.27%. Profit before tax climbed to INR1,403 crores, compared with INR1,289 crores in the corresponding quarter of the prior year, a growth of 8.81%. Profit after tax went up to INR1,048 crores for Q1, versus INR969 crores in Q1 of last year, a growth of 8.17%. EBITDA margin for Q1 stands at 25.83%. Earnings per share rose to INR1.43 for Q1, against INR1.33 in the same period a year earlier. As of 1 July, 2026, the order book position is INR72,258 crores, and orders secured during this quarter amount to INR3,754 crores. That covers the brief financial highlights of Q1 ’26-’27 from my side. The floor is now open for Q&A.
Thanks. <<operator_script>> Our first question is from Amit Dixit at Goldman Sachs. The line is yours.
Hi there, and good evening, everyone — appreciate the chance to ask. I have a couple of questions on my end. The first concerns the order inflow we saw during this quarter. When I put it next to Q1 FY ’26 and Q1 FY ’25, order inflow looks fairly lean. I just wanted to get a sense of why that is — is there something more structural behind it, or is it simply the timing of orders? I’d like a bit more clarity on that, and also on the QRSAM order, which appears to have slipped. That’s my first question, sir.
Okay, so here's the thing: last year, you might be aware that we expected to receive orders by 31 March, yet a couple of orders came in during the week of April. That's the reason we fell short of our target for the prior year, in fact. Our first-quarter orders, though, were quite strong — although that really represented more of a spillover from the January-to-March quarter. This year things were better organized. Whatever we were set to receive between January and March, we actually ended up with 2,000 to 3,000 more, I can tell you. We had figured roughly 25,000, but in the end we landed at around 30 plus. So there wasn't really any backlog as such. In fact, one or two orders were also booked from this year's first quarter. So this year, whatever we have received — INR3,700 crores — that is exactly what we had planned, nothing else. So there's really no cause for concern. We will certainly achieve the guidance we provided regarding order inflow for this year. As for QRSAM, we said we were quite hopeful of getting it by March, but we were aware of procedural delays. That's why we indicated it could slip to Q1/Q2.
By September, at the latest, we’ll get the maximum—and I’m still holding to that. It’s only CCS that all of us are waiting on. And hopefully, when CCS convenes, I think QRSAM will get cleared. On our side, every input and every activity has been completed by all of us. So we’re simply awaiting the CCS approval, and at that point, we’ll receive the good news regarding QRSAM.
Thanks, sir. Turning to the second question, it concerns Project Kusha. We've noticed testing activity involving the M1 interceptor, and there has also been some progress on the RFP for M2. So I just wanted to hear your thinking on when testing will wrap up, when we might expect the order, and what our share of it could be?
Like I mentioned before as well, DRDO is heading up the Kusha program, and for a range of subsystems we serve as their biggest DCPP partner. So at this point the trial involved the missiles. Following that, they'll carry out testing with various missile configurations, then configurations involving radar, the control center, and integrated setups, and so on. Their testing will follow their own structured approach. So that particular question really needs to be directed to DRDO. Let me reassure you that on our side there's no delay in any subsystem or systems-level support that we're required to provide to DRDO for this extremely prestigious project. As was already stated, we're expecting an order on the order of INR40,000-plus crores. But at the earliest that will be '28-'29, which we also indicated the last time. So following this round of testing, when there will be far more numerous evaluations of different types, only after that will the RFP be issued for commercial activities. So there's still quite a distance to cover. So you'll have to wait and watch along with these various R&D-level developments, which DRDO carries out with strong support from BEL.
Alright, sir, that's great. Many thanks, and best wishes to you.
I appreciate that.
Mohit Pandey from Citi Research has our next question. The line is yours, go ahead.
Yes. Good evening, sir. Can you hear me okay?
Yes, Mohit.
Right, okay. Yes — my first question is also about orders. The explanation for the year-over-year decline is pretty clear, but I just wanted to get a sense of this year for the base orders: should we expect them to come in back-ended, or are they likely to be spread out evenly across the year? That's question number one.
All right, here's the thing — for this, we don't put out targets on a quarter-by-quarter basis. Those are purely our internal assessments. What leads or PNCs concluded — or didn't conclude. On that basis, we do our own internal follow-ups on any slippages, should there be any. But quarter-to-quarter, we aren't publishing anything. For us, it's a yearly target, and we already gave that at the start of the year — the guidance. So that comes to INR55,000-plus crores, QRSAM included. So we're sticking with that, and definitely two, three big programs sit in the real pipeline for CCS or other kinds of approvals. So we don't foresee any problem in securing these order inflows for this year.
Got it, sir. Sir, we don’t publish the balance sheet or cash flow alongside the first quarter, but is there any color you can offer on payments or receivables? Yeah, has there been any improvement compared with the fourth quarter? That would be my first one. And second, on margins, if you could give any color — this quarter saw a Y-o-Y decline. Is there anything in particular you’d want to highlight there? Is it simply product mix, or were there any one-offs, etc., as well? Yeah.
Okay, regarding receivables, the days outstanding as of 30 June is roughly 140 days. On 31 March it stood at 176 days. So as of 30 June we're at 140 days, meaning there's been an improvement versus March. Receivables are therefore in good shape and cash flows are good too. We don't see much to worry about on those fronts. On margins, as we've said before, we've guided to a 28% EBITDA margin for the current year, and we're holding to that. From quarter to quarter there may be fluctuations driven by the product mix composition, and that's why some variation shows up. Apart from that, the current-year EBITDA guidance we've provided stays as is. So there's no real reason for concern about margin on a quarterly basis, and we shouldn't read too much into that. On an overall yearly basis, we're maintaining the 28% EBITDA margin that we've already stated.
Got it, sir. Sir, I just want to make sure we’re clear: the margin mix comes from product mix, not from pressure on input costs. Just to be clear on that. So what you’re saying is this is because of variation in product mix, right?
Yeah, yeah. What we're saying is that this comes from variation in product mix, not from input cost.
Alright, sir. I’ll rejoin the queue. Yes. Many thanks, and all the best to everyone.
Alright.
Our following question is from Kavish Parekh at 360 ONE Capital. The line is yours.
Hi, team. Thanks for the opportunity. Sir, about the order book you're holding today, could you help us understand the broad split across categories—say naval versus air versus, say, land-based systems? Incrementally, in terms of order inflows over the next few years, excluding QRSAM, which of these segments do you expect to be the key growth drivers?
You know, when it comes to the army, navy, and air force, it's pretty much the same split. So out of the total 100% we have, it's 30%, 30%, 30%. Defense accounts for 90 of that. So roughly 30%, 30%, 30% is army, navy, air force. And the order inflow follows pretty much the same pattern. QRSAM is actually a combined order for the Army and the Air Force. But there are Air Force-related big-ticket items as well. The Navy too will have some big-ticket items. So again, during the year, this INR55,000 crores will also be more or less evenly spread across Army, Navy, Air Force. So as such, I'd say there's equal priority, and/or equal confidence, from all three forces in this. As of today, according to the order book, the main components are the electronic fuse for the Army, LRSAM for the Navy, LCA LRUs for the Air Force, the BMP-2 upgrade, again for the Army, the Ashwini radar for the Air Force, and the EW suite Mi-17V5, again for the Air Force. MPR Arudhra, Air Force. So along those lines, these are all major order book items. Again, it's spread across all three services.
Got it. Building on that, would profitability vary in a meaningful way among those segments, or is margin mostly tied to the product itself no matter which segment it sits in? And if I may go on to my second question, which products were the main ones delivered in this quarter, some of which you'd point to as reasons for the margin drop this time?
Right, we can't extrapolate that from the fact that this product margin decline was smaller or larger, as the case may be. Because once again, we're only showing you a glimpse of a few top eight, 10 projects, not the details, since detailed projects are so numerous. So first, this margin spread across Army, Navy, Air Force is uniform. Because overall, across Army, Air Force separately, we have some subsystem, systems and system of systems type of projects. So it's not that in one particular segment, or Army, we have less margin or Navy more margin. It's not like that. It's spread across type of solutions, and our solutions are spread across various varieties. The major orders executed in this quarter were LRSAM, MPR Arudhra, LINK U2, upgradation of periscope, BSS project supplies, AON 51 systems, Akash-T some supplies, Himshakti system some supplies, fuses and receivers. So again, this is only like 10 important projects, but overall projects are many more. So again, correlating that this particular project has less margin or this has more margin, it's not correct to estimate, because of the total spread across number of projects which we execute even in a quarter also.
Got it. And one final question from me. Sir, regarding the counter-drone ecosystem, could you offer a few thoughts on what BEL’s role looks like at present? Which systems or products do we have involvement in right now? And what components or subsystems do we provide? On top of that, the private sector seems to hold a sizable portion of the opportunity across the overall market. Could you give your view on which players are performing well when it comes to innovation and product development? And which areas in the counter-drone market are still relatively untapped today? And where do you see chances for BEL to expand its presence or, let’s say, pick up market share?
First off, I want to say this: the drone and counter-drone market is expanding enormously. You've likely noticed that in recent conflicts, the genuine threats and genuine deterrents mostly revolve around drone and counter-drone solutions. So this market is growing at an exponential pace, and there's room in it for large firms such as BEL, for mid-sized private-sector players like Jain Technology, for plenty of other companies, and for startups. That means all of us have growth prospects. So we don't have to fret, and we don't have to grab somebody else's share of the pie. Each player has its own distinctive solutions. Our sharper focus is on large, high-power DEW solutions built on lasers or microwaves, and on integrated D4 solutions. What I mean is real capability with hard kill. The more hard-kill-based, more intricate systems are where our attention sits. That said, it doesn't mean we aren't also working on a drone that kills drones, or on an EW jammer that itself takes a drone down or brings it to the ground. So we too have certain products we refer to as D2, certain products as D3, and certain products of the true D4 kind. D4 means hard kill is included as well. So that covers hard kill, soft kill, and mere detection followed by neutralizing through some other conventional means.
When it comes to this total complex solution, our focus is sharper. Again, I want to emphasize that we're concentrating more on these large systems built around hard kill. That said, other players exist, and startups in particular are present for the D2 category of systems and various other innovative solutions. Still, every kind of solution is needed for drones and counter-drone operations. So we don't see a challenge ahead. And certainly, we've tasked our own CRL, Central Research Laboratories, and the PDICs with exploring further innovative solutions, whether on their own or by working with startups. So we're also tapping into a solid startup ecosystem now. A few orders, though small at present, have been secured jointly with startups, and we're moving aggressively into this category of small innovative products as well. The same situation may hold for what we call our mid-size competitors. But in this large, complex domain solution, as things stand, we are the de facto leader.
Got it. Thanks very much for walking us through that, sir. Many thanks indeed. Wishing you all the best.
The following question is from Harshit Patel at Equirus Securities. You may proceed.
Hello, sir. Thanks so much for taking the question. Sir, my first question: you mentioned the possibility of sizable orders coming through from major naval platforms, like MPV and P75I. Could you shed some light as well on how large the potential orders might be from the follow-on P75, meaning three submarines, from P18, which will be the next generation destroyers, and from the follow-on to P17A, which will be P17B? What potential order sizes could we see from these big projects? I realize they may not come through in FY ’27 itself, but across FY ’28 and ’29, what might those sizes be, sir?
Honestly, at this point it's too soon to estimate what the business volume will be for that. Take P17 Bravo, P18 or the other projects, NGD. With these programs, what we're doing right now is finalizing configurations, technical interaction, finalizing specifications, subsystem indigenization — that kind of work. We're carrying out that role together with our DRDO or our Navy friends. Once that activity crystallizes for one of the programs, with the timelines they give, when the BOQs start being discussed, only then will we come back to you about the actual timeframe in which we might receive this order and how large it will be. As of today, it may be a little early. Perhaps a year from now, at least for NGD maybe, we may have clearer visibility on those two figures. So these programs are definitely beyond ’28, ’29 — not before that. Finalizing the configuration and working out the exact volume of business for BEL, for them, takes its own time on these programs.
Got it. Sir, second, the media reports indicate that the Adani…
Harshit, apologies for cutting in. Your audio sounds a bit muffled to me. If you aren't already on handset mode, would you mind switching your phone to it?
Is that an improvement?
Yeah, slightly better. Go ahead.
Thank you. Sir, according to recent reports, Adani Defense is set to serve as DRDO's partner for electronic system integration on the Netra 2. Does that leave us with no role in this at all? And what other areas and platforms lie ahead where we'll be going up against this credible competitor?
Allow me to restate that.
Ladies and gentlemen, the connection to the management team has been lost. Kindly remain on the line while I bring them back on. Thank you. Ladies and gentlemen, the management team is back on the line. Please proceed, sir.
Okay, so let me just walk through the Netra 2 project specifically. My understanding is the bidding for this took place around 1.5 years ago, approximately. We took part in that bid as well, but sadly we weren't L1. That's just how competition works. In any given program, one party ends up as the competitor, another becomes L1, and someone else lands at L2. In this specific program, Adani emerged as L1, and they serve as the system integrator here. Naturally, though, our subsystem-level modules and capabilities at BEL will still be leveraged by DRDO and by Adani too. Our strengths in subsystems — radar, EW, data links, and numerous other subsystems — all feature within this Netra program. So DRDO and Adani will draw on that subsystem-level expertise of ours. That said, the SI role in this instance slipped away from us. We weren't L1, and Adani took L1. That's simply part of life. In certain programs we'll be L1 as SI, in others we may not be. Still, our subsystem strengths — our in-house capability to develop these subsystems — will certainly deliver solid business for us going forward.
Got it, sir. Thanks a lot for taking my questions. I’ll get back in the queue.
Thanks. Our next question is from Bhalchandra Shinde at Motilal Oswal Financial Services. You have the floor.
Hello, sir. This is Bhalchandra Shinde. Sir, I’d like to ask about the recent opening of Astra Mark to private players. How do you view that as a trend for missile programs? So many programs are coming up, sir. How do we see private participation opening up in missile programs especially?
Certainly, that's a question you'd be better off putting to one of the private players rather than to a public-sector company like BEL, which isn't yet an established name in missiles. That said, we too have ambitions in this missile area and are moving into it. Right now we're definitely looking at it from the other side—the same way the private players are looking at it. The thing is, in this particular domain, as you're aware again, the conflicts of the last two or three years have shown just how crucial missiles are in any war scenario. So both quantity and quality matter here. So to handle surge requirements, there's certainly room for plenty of players besides BDL to meet that surge requirement. That's where BEL and other private companies are also contributing. On two or three programs we're actually working together with private players, and we've secured some orders as a BCPT partner. So this domain is very, very important, and there's a role again for BDL, BEL and private companies. So all of us have a part to play in meeting the surge requirement. But let me assure you once more: in most of these missile programs, when it comes to the major electronics, we're the leader today, because that electronics is more complex than a radar or other systems, where we have so many subsystems and the expertise for customized solutions.
That should give us enough business down the road.
And sir, how much should one assume for the pipeline over the next five years for the missile program?
That's really hard to forecast. For that, you'd need to check with either the ministry or perhaps the NSA office, since these are strategic matters, and most strategic matters of this kind aren't even discussed openly by them. We're looking at what other countries — European nations or the U.S., etc. — are projecting in terms of the missile production they expect. A similar inflow should apply to Indian missile programs too. So all we can do is extrapolate from that, but exact quantities and so on, we can't give you, because that's a strategic decision the Government of India has to make, not us. We have to prepare ourselves for it. So we are preparing ourselves — that much I can assure you.
Yes, yes. Thanks. Thanks, sir.
Much appreciated. Our following question is from Hardik Rawat of IIFL Capital, who is on the line now. Kindly proceed.
I appreciate the chance to ask. Sir, my first question concerns the P&L. We've seen a quite commendable 25% Y-o-Y growth in revenue, but at the same time, our other expenses have actually declined by roughly 20%. So I just wanted to understand: have there been any sizable provision reversals here, or what accounts for this decline in other expenses?
In the prior year, the liquidated damages provisions during this quarter—April to June of ’25—ran higher, driven by the delivery schedule of those contracts executed in the previous year. Because of that, in the current year, that factor is no longer present. That accounts for the difference behind the decline in other expenses.
That's useful, sir. And my second question concerns the counter-UAV discussion that came up earlier during this call. You said BEL would be focusing more on directed energy weapons, both laser-based and microwave-based. So sir, could you give us some color on when we should expect a prototype in its earliest phases being developed by BEL? And by when do you expect commercial sales from this product to begin?
Let me give you some context: over the last three years we've already received sufficient orders for this 2-kilowatt laser-based DEW solution, and most of those — roughly 80% — have already been delivered by us. Naturally, where microwave DEW-based solutions are concerned, those are still being evaluated at present, even though the prototype is ready. Those prototypes were built by us jointly with DRDO. But at the same time, we've begun some customized configurations, particularly for export purposes. So in exports too, we're seeing very good leads. We've given quite good demos to a few countries, and they've expressed very keen interest in these high-power laser or microwave-based DEW solutions. So we have our own in-house strength to make customized, different, different products for the basic design. But the basic design originally came to us from DRDO. They were our real development gurus. But today we have the capability to customize them or to bring out different versions, upgrades, upgrade on range, upgrade on higher power laser, etc. So there's a series of product versions, as we call it. So they're already pipelined. And one or two we've also given demonstrations on to our end users as well as to some of the external countries, export countries, who have shown some interest.
And once that confirmed order does come in, I'll be sure to give you an update again.
Understood, sir. Thanks very much.
Our next question is from Dipen Vakil at PhillipCapital. Please go ahead.
Hello, and thanks for making time for this. Congratulations on executing so well. My first question, sir, concerns your order book. Right now it stands at INR72,000 crores. Could you walk us through how that book breaks down — say, for the 10 biggest orders? What size would each of those be?
Yes, absolutely, absolutely. So the major orders are few. Hold on, hold on. Just a moment. On the final slide. That's where the detail I was going through is. Going product by product, I'll just run through them. The first is fuse. Naturally, the biggest portion of the order book is fuse, since we still have to keep supplying fuses for 8 more years. After that come LRSAM orders, then LCA Mark 1 and Mark 1A LRUs for the 83 and 97 aircraft, then the BMP-2 upgrade, then Ashwini Radar, then the EW suite for Mi-17V5, then MPR Arudhra. Those are the top seven projects sitting in our order book as of 1 July.
Could you tell us how much the order book comes to?
Those 7 or 8 projects come to roughly INR20,000 crores, and that's within the INR72,000 crores total. So all in all, we've got a lot of really small projects, each with at least 400 or 500 line items. So these are the top 7 items, and together they make up more than about INR20,000 crores of my order book as it stands today.
Understood, sir. Sir, my second question concerns the order pipeline you mentioned at INR55,000 crores: if we leave out QRSAMs, which major orders are presently building momentum in line with expectations?
Like I mentioned previously, for Shatrughat and Samaghat, there's a possibility we'll see those within another three to six months' timeline. The largest one comes after QRSAM. Then, as I said, NGC or P75I — one of those two, we'll definitely go through. Perhaps we can go through both, since the government has to grant approval. Again, they're only awaiting CCS approval. But we're confident that, as I said last time, there's at least a 100% probability of having at least one of them, and more than 50% probability of getting both. So that's why these two programs have other major subsystems in them, for which we may receive a big order. Of course, the HAMMER project is also one we're going to get in this financial year, along with Shakti Phase 4. So these are a few more major programs as well, for which we expect orders in this financial year.
Understood, sir. And sir, beyond those platform orders and base orders, what quantity of base orders do you anticipate for this year?
If you add it all up, I said INR55,000 crores in total. Of that, roughly INR30,000 crores will be QRSAM, then around INR15,000-plus crores is these platform orders, and the rest will be the other base orders of smaller quantities, support, services or AMCs — all of those combined, the remainder.
Understood, sir. Understood. That covers everything from me. Many thanks, and best of luck.
Our following question is from Atul Tiwari at J.P. Morgan. Go right ahead.
Yes, sir. Thank you very much, sir. Sir, my question concerns the probable effect of the pay commission…
Apologies for cutting in, Atul. You sound a bit muffled to me. If you aren't already on handset mode, would you mind switching your phone to it?
Hello, sir. Can you hear me clearly at this point?
That’s much better. Yes, please go ahead.
Right, understood. Sir, my question concerns how the pay commission provisions will probably affect the company's margins across the coming 2 or 3 years. So when do these provisions begin — which quarter? And what is the expected amount, and what effect will it have on margin?
Look, in the current year — January ’27, the current financial year, and from January ’27 onward — the wage revision comes due. So for this year, provisions will be set aside covering a three-month stretch, January through March ’27. That's for the current year. In the next year, naturally, it will hinge on whether matters get settled or not. Again, if a settlement happens, that's fine. If not, then it's a full provision. On the impact side, since turnover is going to rise year-on-year — as we've already said, we're projecting solid growth in the years ahead — we anticipate employee cost to turnover landing in a range of roughly 12% in the coming years as well, which is also 12% right now, same as last year. In the years ahead too, we expect it to sit in that 12% range for employee cost as a percentage of turnover, given that turnover itself will be expanding at a good scale.
All right, sir. So even with the pay commission provisions having been put into effect, you’re not expecting the employee cost to revenue ratio to shift at all over the next 2, 3 years, in the near term?
That's correct. Because turnover is going to rise at that scale, the impact from employee costs — whatever increase came after the base revision — will get absorbed by that turnover growth, and we expect the overall percentage to come in at about 12% itself.
Understood, sir. Thanks, sir. That’s very clear.
Thanks. We move to the next question, which is from the line of Vikash Singh at ICICI Securities. You have the floor.
Good evening, sir, and thanks for the chance to ask. Sir, my first question is this: while we have a lot of confidence about holding the margins in FY ’27, do our supply chain contracts also protect us from any meaningful cost inflation in FY ’28-’29, or would those perhaps be addressed at a later point when it comes to contracting?
No, material cost inflation isn't driving any changes on our end. The point is, as I mentioned before, we're continually pursuing indigenization, and that effort will either directly or indirectly offset these kinds of material cost escalations, along with any other issues that might arise soon. We're actually boosting our indigenization investment on a significantly bigger scale, and that's reflected in the MoU we have with the government as well. So these additional efforts we're making — let me reassure you again — will protect us on margins and so forth, or from escalations that could occur down the road. We're taking these kinds of proactive measures to keep that under control.
Could you tell us where indigenization stands right now versus what you're targeting a couple of years out?
What we're really focused on is achieving zero imports of any module — down to the sub-module level — over the coming 5 years. So aside from components, semiconductor components, every other kind of subsystem that we bring in from abroad — whether it's some of the RF or microwave subsystems, or SBCs, or compute-related items and so on — we currently import those as modules. For all of these modules, we've set ourselves a goal of finishing the full indigenization within the next 5 years, and that covers verification, validification, and certification as a form-fit replacement. So that's the target we've laid out, and we've made sufficient provisions for it. We're also bringing out our own indigenization policy. We'll formally release that policy, and it will cite this very fact that I just mentioned to you. So we're setting aside some dedicated budgets for this indigenization push, and we've received very strong backing from industry on it as well. Our MSMEs and startups, too, are getting in line with us to support this indigenization effort.
All right, so what would our yearly capex be, and what share of that is going toward indigenization?
Let me be clear about capex — we keep that separate from indigenization. As for indigenization, we generally fund it, if at all, out of our R&D budgets, and those are definitely going up. The bulk of our capex goes toward infrastructure for what we call production-related activities, and for boosting capacity there. As we've guided you, we're putting more than INR1,200 crores into capex, which covers our production needs along with other kinds of investment. Indigenization and the like come out of our R&D budget. And we had, in any case, already given guidance that more than INR2,200 crores of R&D budget has been set aside for this year for all types of niche technology development, indigenization and other collaborative R&Ds.
Got it, sir. And sir, one last thing — is there any news on the AMCA program?
Absolutely. On the AMCA program, we and L&T are genuinely collaborating closely. And to a large extent, our internal pricing has been settled, and clarity on all the sub-module aspects has been achieved. We held apex-level meetings — that is, 2 senior-level meetings also took place. And I believe with 1 additional meeting, we will wrap everything up, so that we can submit our RFP response as early as possible.
Alright. Sir, a deadline for the RFP submission got pushed back. So what is the deadline at this point?
Sir, I can't say with certainty whether the extension was for 2 months or 3 months. The thing is, I did know it had been extended — that's the reason we're getting our response ready by mid-August this month. But how many months of extension we've actually received, I'm not exactly certain. Perhaps before this call ends I'll be able to tell you, since my working-level team is handling that. We had been hoping for a 2-month extension. What we actually got, though, I don't know. Still, we will definitely hit that timeline — that much I can assure you. But the exact timeline, I'll learn in a few minutes.
Understood, sir. Understood. Thanks, and best wishes.
Thanks. Our next question is from Jyoti Gupta at Ashika Group. Jyoti, please go ahead.
Good evening, sir, and thank you for the chance to speak. I simply want to get clarity on that Tejas delay — we had expected about 4 Tejas, the fully loaded ones, to be delivered by August. As of today, there's still no visibility on that. So the next 6, which are meant to arrive in addition to those 4 over the coming 6 months — if the 4 don't get delivered, then looking further ahead, don't you think supply requirements for the remaining 6 Tejas would slip as well? So wouldn't that hurt your revenue or your margins on that front? Because you brought up LRUs.
Yes, yes. Let me make this clear once more. These LRUs are being sold solely to HAL. There are roughly 11 types of main LRUs tied to the LCA, plus some additional EW-related LRUs that they request from time to time. These units are electronic modules, each tested separately under the approved procedure, and after that we deliver them to HAL. Let me assure you, we have provided them with far more than they actually require. So they already hold a sufficient number of electronic LRUs in line with the contract delivery schedule we handed over, and those are with them. So let me reassure you once again: no Tejas will be delayed owing to late supply of LRUs from BEL. That much will not happen, I can assure you. We have given them enough quantity to build. As things stand, according to public and media reports, the primary bottleneck remains the engines, and HAL can tell you better about when they receive engines and when they deliver the Tejas aircraft. But from the LRU standpoint, we have supplied them with sufficient numbers.
No, but I was hoping to get clarity on this: even though you've already provided more than what's needed, won't that have an impact on the pipeline for the ones still to come? Because if things stay as they are right now, then it's possible that <<foreign_lang>> LRU could essentially grind to a halt down the road. That's the point I was trying to make.
All right, I take your point. Often, broadly speaking, those electronic modules get tested individually and can also be held as inventory. If HAL, however, asks us to slow down, then we don't need to build those modules at that point. The material will remain with us, and we can build and test a module according to their supply timelines. As of today, no slowdown has been communicated to us, so we are proceeding with our plant capacity and plant planning for this program. So on that front, there's no problem. If they do say so, though, it might at most impact us by a few hundred crores here and there. Perhaps INR200 crores or INR300 crores of turnover could slip by a few months for me. Certainly, when we are planning for INR30,000 crores, INR300 crores works out to under 1%. And these kinds of business-level so-called changes, or schedules, plans and so forth, are simply part of life, and we can certainly absorb this sort of under-1%-significance delivery-schedule-related negative challenge, I should say, for us. So that we can manage. Okay. And now let me speak about this AMCA program. Now, I believe the date has moved by two months.
The RFP submission date is 27/8/’26. So it actually moved by two months. So 27/8 — that's the current RFP submission date.
All right, thanks very much, sir.
Thanks. Our next question is from Aritra Banerjee at Nomura Holdings. Go ahead, please.
Yes. Hello, sir. I trust you can hear me. Thank you for this chance. I actually have a couple of questions. First, we were awarded the LRSAM contract valued at roughly INR92 billion back in FY ’19, yet a fairly large chunk of it remains unexecuted within our order backlog. So is there any explanation for why that work hasn’t been carried out as yet?
So you mean LRSAM, is that right?
Yes.
The LRSAM delivery schedule was itself spread out across last year with a very small quantity, and this year the major portion of the quantity is for this particular one, so that will be there. So we are going only as per schedule. Nothing to worry about, no delays exist in this program for us. The leftover activity comes to around INR3,000-plus crores in total that we have to supply. And out of that, the majority we will supply this year. Maybe a few hundred crores will move to the next financial year. But it is only as per the delivery schedule. So nothing worrying in the LRSAM program is what we are seeing as of now.
Understood. Understood. Sir, would you mind repeating the quantity we will be delivering this year — the amount invested?
I won't give you the precise figure, but of the INR3,000 crores that remains at present for the LRSAM program, roughly INR2,200 crores to INR2,300 crores, an amount of INR2,100 crores is scheduled during this year.
Alright, alright. And one more follow-up on QRSAM — will that too end up with a comparable execution timeline of 7 to 8 years down the road?
No, no. That first order stretches across 7 to 8 years, since it involves FOPM, then the FOPM evaluations, and only after that does bulk production get underway. So whenever we receive the next order, if it's for comparable quantities, we can definitely deliver within 3 to 4 years.
All right, all right, got it. And sir, just one final question about the holdups in orders for NGC, QRSAM — all of those programs. So is there any chance revenue growth in FY ’28 comes in below expectations, at least, because these orders are running late?
Not exactly. Let me put it this way: as far as financial year ’28 goes, neither of these two programs counts toward what we deliver. They sit within this year’s target for order acquisition, and a portion will slip into the following year. My execution plan for next year, though, does not include them. What that plan does include is every order I’ve already secured, plus a few smaller ones. As we’ve said, plenty of smaller base orders keep arriving, and those typically carry a delivery schedule of 12 to 18 months. So they’ll carry me through next year as well. This year and next year rest largely on orders of that kind. Once these large platform orders begin contributing, the big turnover comes after two years — not right away.
Understood, sir. Understood. I appreciate your taking the questions, and best wishes for the quarters ahead.
Thanks. Our next question is from Bhavya Gandhi at Bajaj Alternate Investment Management. Please go ahead.
Yeah. Hello, sir. Thanks for the chance. Sir, I just wanted to get a clearer picture, since earlier you gave guidance of a 28% EBITDA margin. So for the quarters ahead, we'd need something nearer to 29% EBITDA margin on average. Is that genuinely achievable, sir, in the coming quarters?
Yes, absolutely. Our EBITDA margins can range from 25% to 31%, depending on product mix from one quarter to the next and so on. Still, when we get to year-end, let me reassure you once more: we will exceed 28%.
Understood. And sir, over the years, you had also mentioned before that you'd like to raise the R&D spend closer to 8%. So looking at a longer-term horizon, over a two to three-year period, this kind of margin can be sustained, since R&D expense sits at 6% right now. If 2% more goes toward R&D expenditure, will that dent EBITDA margins going forward on a longer-term view? This is on a slightly two to three-year basis.
No, there really are only the genuine tricks. The more you put into R&D, the greater the likelihood of more EBITDA, since you're building this technology, you're developing something, you're doing additional indigenization. So right now I don't see 6.5% or 6.8% rising to 8% hurting margins. In fact, I believe it might ultimately make my EBITDA margins more sustainable, even though my product mix could shift here and there. So these come from our prior experience, which we've observed over the last 50 years. We keep raising our R&D expenditure. And through R&D spending, we've found the returns arrive in various, various forms. One is technology self-sufficiency, and naturally, indigenization. Greater indigenization delivers higher EBITDA margins for us.
Thanks, sir. And can you put a number on the indigenization figure as things stand right now?
So on indigenization numbers — I'd say indigenous content across platforms is one number. For the major platforms, that's the kind of figure we provide. But when it comes to a company-level indigenization figure, no final formula exists.
For it, turnover is 80% indigenous.
Broadly speaking, when you look at our revenue, somewhere between 78% and 80% of it is generated by products and technologies that are homegrown.
Understood. Understood. That’s fair. Thank you very much, sir. I really appreciate it. Thank you.
Our following question is from Rahul at Macquarie Group. You have the floor.
Yeah, hi. Good evening, sir. So I have a couple of questions. Which international markets or partnerships, and which product segments, give you the best opportunity to grow your export revenue and lessen your dependence on the Indian defense budget cycle?
Nearly every product and technology we currently supply to our Indian customers is also seeing strong demand internationally. The biggest one, though, is radios. You may recall that last year we booked our largest order, worth roughly INR2,000 crores, covering next generation software-defined radios, SATCOM solutions and D4-type solutions. We've grown our T/R module build-to-print business, particularly for the airborne segment. Given the quality and infrastructure we have, we're expanding our presence in those high professional grade airborne modules. As I said, that will be at both module level and system level, primarily in communications and our WLR-type weapon systems. There's a long list of such items. We're highly confident we'll deliver considerably stronger export figures than the ones we have now.
Certainly. Sir, my second question is this: you have said you plan to raise exports to roughly 10%, and I believe you also mentioned boosting R&D. What I'd like to know is where exactly those additional R&D funds are being directed. That would help us grasp the direction BEL is heading in. And I think you already covered microwave-based and laser-based weapon systems. So are there any further areas you could name where you intend to put more of that incremental R&D spending?
Let me say it once more: since we operate in defense electronics, every single area matters to us, as each one involves some kind of technological upgrade. Take AI as an example. AI isn't confined to just the army, navy, or air force, or solely to radar or laser systems. As a technology, AI is needed across every domain. That's why our R&D spending also spans all domains. Naturally, there's a somewhat larger increase in R&D on certain big-platform projects for us — meaning large equipment such as particular radar, sonar, and EW programs of that kind. We've also taken on a few additional projects in mission mode. Still, on the whole, I can say we're spending evenly across subsystems, systems, and equipment, and on the indigenization push at the subsystem and module level. So in that sense, we're extending our R&D efforts in every direction, including diversification into the civilian domain, such as rail, metro, and the aviation sector. Along those lines, we're also doing space. So we're diversifying into these new areas while consolidating our strength in current areas by bringing in newer and newer technology. That's where the whole of — the majority of the R&D funds will go.
Sir, my final question concerns the employee cost you mentioned. When this incremental agreement comes into effect, how long will it remain valid? And typically, when was the most recent hike taken? Since, say, you have roughly INR3,000 crores of expense on employees, I’m just trying to work out how much this might be in FY ’27 or ’28. Would it be 10%, or how does that work?
The previous increase happened in January 2017, and it covered a 10-year span. So the following increase arrives on January 1, 2027. That's the basis for what I said about this year — for one quarter, the effect will show up. Regarding the increase itself, how large it will be is something we can't say right now, since certain committees are formed at the government level and they give us direction. But broadly, considering some parameters from what we received last time and what we might receive this time, that's how I make my prediction. We had estimated that employee cost as a share of turnover would stay around 12% in the coming year, and in the years ahead as well, including next year, because turnover scale will be rising by then. So even with a three months provision for employee cost sitting in the current year, and even next year — whether it's a provision or a full settlement — the overall effect on the employee cost to turnover percentage may not be significant.
Sure. Thanks a lot, sir, and wishing you all the best.
Thanks. Our following question is from Shirom Kapur at Jefferies Group. Go ahead, please.
Hello, sir, and thank you for the chance to ask a question. I'd like to ask about the 15% revenue growth guidance you've given for this year. Since you already achieved 20% in the first quarter alone, are we on course to probably exceed that 15% revenue growth? Will it end up higher?
Absolutely — as I also mentioned last year, the target is 15%. Last month, we might surprise you by perhaps 0.5%, 1%, or 1.5%. I’m not sure how much more we can achieve, but our balanced plan is 15%, and I’m confident we will get to 15%. From quarter to quarter, there are variations between the previous year and this year. So those are — generally, they apply across all our defense-related projects. So with that, we’re confident about meeting or exceeding the 15% guidance.
Understood, sir. And then second, if you would, you brought up a few of those programs you’re expecting in FY ’27 — Shatrughat, Samaghat, Shakti Phase 4, HAMMER. Could you put some numbers on those programs, meaning how large — what potential order sizes exist for some of them? And if you could go into a little more depth on the HAMMER program that you’ve signed with Safran, what is the overall market potential there?
No — what we're discussing is just the initial order, the immediate first one, which we might secure during this financial year for those three programs, since afterward there will certainly be many additional orders across all three. So for Shatrughat and Samaghat, I believe I mentioned that we could receive roughly INR9,000-plus crores from Shatrughat and Samaghat. And for Shakti, it should come to approximately INR2,000 crores. As for HAMMER, that one is about INR2,500-plus crores. So we expect to land these three orders within this financial year itself. And after that, on repeat orders, there's solid potential for them to generate repeat business. But repeat orders will definitely only arrive after two-plus years, since the execution alone is going to take roughly two years. So beyond that point is when the repeat order comes — only once we've delivered substantial quantities against the current orders, that's when.
Got it, sir. And just one final thing—since previously you had anticipated roughly INR21 billion in deliveries for FY ’27, which other programs do you expect will add to your FY ’27 revenues, and could you put numbers on them?
Absolutely — we've completed our planning, and we recently wrapped up our roll-on plan meeting as well, which reaffirmed the amounts we may secure for each program. So, Akash and Army, we're going to bring in more than INR1,000 crores in revenue — roughly INR1,200 crores. D-29 EW systems, MPR Arudhra, the BMP-2 upgrade, LCA, and LRUs — these are each around INR500 crores to INR1,000 crores, and every one of them will contribute to us. So overall, within this journey of ours beyond INR30,000 crores, these are the six or seven key projects that will deliver this kind of turnover for me.
Got it, sir. Thank you. I appreciate your responses.
Thanks. Our next question is from Vipulkumar Shah at Sumangal Investments. Please go ahead.
Hello, sir, and thank you for the chance to ask. Sir, my question concerns the cost of raw materials, which has climbed very steeply both from the prior quarter and compared with a year earlier. It could, of course, stem from product mix, yet it has risen by roughly 8% to 10% quarter over quarter and year over year. So does that come from inflation in any commodity prices, or is there something one-off in there, or is it product mix? And what corrective steps would you take on that? So your remarks would be welcome, sir.
I want to reassure you once more, as I mentioned earlier, that this is primarily due to product mix alone. The thing is, traditionally as well, our material cost has ranged between 50% and 58%, 59% because of our product mix. Normally it sat around 55%, but depending on the mix, sometimes it falls by 3% or 4%, and sometimes it rises by 3% or 4%. So that is what we consider a healthy sign for our business operations. At this point, we don't anticipate any pressure from this RMC. We have analyzed this particular matter thoroughly, and the final conclusion, based on product mix alone, was that it stemmed from product mix. It did not stem from some pressure due to raw material-related consumption or a sudden increase in input cost, etc. If such a thing does arise, we will definitely be the first to share it with you.
Sir, could you tell us about the export pipeline? And looking two to three years ahead, where do you expect our exports to be?
Like I mentioned regarding exports, we currently have very strong leads. However, converting those leads into actual orders can take a bit longer. So at the moment, I hold an order book of roughly USD465 million. Yet the pipeline we are chasing is at minimum 4 to 5 times larger than that. As for which of those leads we might secure, I can't forecast that directly. Still, for this year we've set an internal target of about $300 million that we should certainly capture from the leads we have. That spans, again, roughly 15 to 20 key products. We feel confident about steadily expanding our footprint in the export market, since as you'll recall and as I said before, our eventual objective is 10% of revenues coming from exports. So we're proceeding methodically to make sure we hit that target within the next five years.
And sir, a small suggestion, if you could provide a presentation with each result, where you can lay out in tabular form the platform-wise execution for every year over at least two years, it would be very helpful for investors and analysts to understand the company. This is just a suggestion — whether that is practically possible or not, please think it over. Thank you very much and all the best, sir.
We appreciate that suggestion. Certainly, our annual report contains far more granular information—it's truly thorough and addresses every aspect. As for whether we could provide that kind of detail each quarter, we'll evaluate it and also review SEBI guidelines and other considerations. That said, at present we are fully compliant with all the guidelines applicable under the Companies Act and SEBI. Still, your suggestion is welcome. We will explore it. Beyond the annual report, could we publish this sort of data in the form of a presentation? We will certainly look into your suggestion.
Thank you. Ladies and gentlemen, we'll treat that as today's final question. At this point, I'd like to pass the conference back to management for closing remarks.
To reiterate my closing comments, which mirror what I said at the start: Q1 performed well and came in line with what we expected internally. Essentially everything we set out to do has been carried out, more or less. The outlook going forward is unchanged. Revenue growth of 15%, an EBITDA margin of 28%, order inflow exceeding INR55,000 crores, QRSAM included, R&D investments above INR2,200 crores, capex above INR1,200 crores, with the usual defense versus non-defense split of 90:10. We are certainly working toward these guidance figures, and I am confident we will deliver on this guidance for the financial year. That concludes my remarks for this quarter.
<<operator_signoff>>
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Bharat Electronics Limited transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to Bharat Electronics Limited earnings transcripts and 132,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $162 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.