H.G. Infra Engineering Limited (HGINFRA) Earnings Call Transcript
November 4, 2026
Earnings Call Speaker Segments
Ladies and gentlemen, good day, and welcome to H.G. Infrastructure Engineering Limited Q2 FY '27 Earnings Conference Call hosted by Go India Advisors. [Operator Instructions] Please note that this conference is being recorded. I now hand over the conference to Ms. Saloni from Go India Advisors. Thank you, and over to you, ma'am.
Good afternoon, everybody, and welcome to H.G. Infra Engineering Limited Earnings Call to discuss the quarter 2 and first half of FY '27 operational and financial performance hosted by Go India Advisors. We have on call Mr. Harendra Singh, Chairman and Managing Director; Mr. Vikas Jain, CFO. We must remind you that the discussion on today's call may include certain forward-looking statements and must be therefore moved in conjunction with the risk that the company faces. We now request Mr. Harendra Singh to take us through the company's business outlook and performance, subsequent to which we will open the floor for the Q&A. Thank you, and over to you, sir.
Thank you, Saloni. Good evening to everyone. Let me begin by wishing you and your families a very happy Diwali and a prosperous new year ahead. May the coming [ Samvat ] bring happiness, success, and prosperity to all. India is progressing towards its vision of becoming USD 7 trillion economy by 2030 and USD 30 trillion economy by 2047, and infrastructure development will play a very critical role in achieving these ambitious targets. With sustained government focus on increasing investment by both public and private sectors, the government is witnessing -- the country is witnessing significant opportunities across roads, rails, power, and urban infrastructure. At H.G. Infra, we believe infrastructure development is not just about building physical assets. It is about connecting people, enabling businesses, and creating opportunities for economic growth. With our presence across 14 states and capabilities spanning roads, rails, metro, renewables, and emerging infrastructure segments, we continue to strengthen our position as a diversified infrastructure company. Let me briefly touch upon the key sector developments and opportunities. The roads and highways remain to be our core business segment, supported by government's sustained focus on highway expansion, improved connectivity, and infrastructure development under National Highway Vision 2047. We expect this segment to continue offering meaningful bidding and order inflow opportunities. The government continues to focus on rail modernization, capacity expansion, and metro connectivity, which is creating significant opportunities for us. We are strategically strengthening our presence in this segment through our ongoing rail and metro projects and looking into many opportunities as a pipeline. Regarding renewables and green energy, with India's green energy transition, this is opening new avenues beyond solar generation, particularly in transmission infrastructure and energy storage. We see significant long-term opportunities in transmission and distribution as well as BESS, which are expected to play an important role in strengthening the country's power infrastructure. Overall, we remain confident about the long-term infrastructure growth story and the opportunities emerging across our focus segments. Our strategy is to leverage our execution capabilities, diversify our business portfolio, and pursue quality projects while maintaining financial discipline and operational efficiency. Let me begin with a glimpse of our operational highlights. As of September '26, the company's order book stood at INR 13,685 crores, comprising INR 8,792 crores from roads and highways, INR 2,883 crores from rails and metro, INR 610 crores from renewable projects, including BESS, and INR 1,400 crores from transmission and distribution. The segment-wise road highway contributes like 64% and railways 24% -- 21%, remaining 15% is from renewables and transmission projects. And the update on the EPC project. As of now, the Ganga Expressway and the UER have been completed, and the completion certificate or UER with effect from 20th February '25, being received on 23rd September '26. And very recently, we have received the completion certificate for Ganga Expressway as well. The Jamshedpur elevated road project is progressing well with 70.82% of the progress. The Neelmangala-Tumkur has achieved 73.64% completion and is progressing towards timely completion and likely to be finished by March '27. The DLF project is at an early stage with 6% completion only because of the land-related constraints. The progress is expected to improve in the coming months. The Pune-Shirur project awarded by Welspun at a cost of INR 3,931 crores is currently in the mobilization stage with work expected to pick from quarter 3 FY '27 onwards once we are getting the appointed date, which is likely to be there within the month. Regarding the HAM projects, the Karnal Ring Road project has achieved 99% completion, and the company has already applied for the provision completion certificate, which is expected to be there any time, and the COD is targeted in quarter 4 '27. As informed in the previous quarter, the provision completion certificates for Raipur-Visakhapatnam corridors, OD-5, OD-6, and AP-1, have been received, and also Khammam-Devarapalli Packages 1 and 2 -- already we have received last year, so with the COD of these projects is expected in quarter 3 and quarter 4 of FY '27. The Tirupati-Chennai, the HAM project has achieved 71.8% completion and is progressing well with the target to complete by 31st March '27. Varanasi-Kolkata Package 13 has achieved 47% financial progress, and Package 10 has reached 18.6% completion. The Kosi Parikrama Package 6 Ayodhya has achieved 42.4% completion and is progressing as planned. Narol-Sarkhej project has achieved 54.8% completion and remains on track for timely completion. For the Gobindpur-Tangi-Capital Ring Road project of Odisha that is Package 3, the company has signed the contract agreement on 24th April '26. The land acquisition is at an advanced stage, and the appointed date is expected any time within a month. Turning into the progress of railway projects, the DMRC Metro project has been 100% -- is 100% completed, and the handover process is going on. The Bilaspur Himachal Pradesh railway project has achieved -- has achieved 98.3% completion and is slated for completion in quarter 3 FY '27. The Kanpur Railway Station project has achieved 58.85% completion, though there has been certain delays because of the blocks not available. So the company has applied for an extension of time, which has been approved in principle for up to December '27. The Dhule-Nardana railway project has achieved 57.6% completion, and the company has applied for the extension of time in this project also because there's almost 11 kilometers of land is not available as of now. The Gaya-Son Nagar and Karajgaon projects have achieved 56.2% and 67.2% completion. And this is non-availability of work fronts also in these projects, the company has requested an extension on both of these projects. The New Delhi railway station project initially faced delay due to land clearances. Now it gradually picked has up with completion is reaching at 18.36%. For the Thane Metro project, the appointed date, which has been declared as 11th January '26. However, this project is facing challenges related to land availability and local social issues also -- socioeconomic issues. So the authorities working aggressively to resolve these issues. Anuppur and Mirzapur -- Anuppur and Mirzapur thermal projects are currently in the mobilization phase with 2.43% and 1% completion, respectively. Update on solar project has been as of 30th September '26, the company's solar project reached approximately 96% completion, while heavy monsoon, transmission line, land acquisition, and local disruption have caused execution delays, but these hurdles are now being actively resolved, and the company is deploying necessary resources to meet revised contractual time lines, over the next -- to be completed in the next few months only. Financially, 89% of the required project debt is sanctioned, and the remaining INR 215-plus crores of balance is slated for release in quarter 3 and quarter 4 FY '27, following the plant commissioning. Operationally, the company invoiced [indiscernible] around INR 80 crores in this financial year from 141 active plants and is targeting INR 250 crores plus turnover -- annual turnover once all the plants are commissioned. Regarding the BESS project, the company has already executed a binding agreement with [ GUVNL and NUEL ] for 3 BESS projects. This is around 1,470 megawatt hours. Procurement of all long-lead items is in place, including BESS and PCS progress, with the delivery expected by January '27. Civil works at Banaskantha and Dholera are approximately at 80% and 60% completed, respectively, with the major material already received. For Choraniya, land-related formalities and design activities are progressing, in-principle [ bank ] sanction has been received. So these 3 projects are expected to generate annual revenue of approximately INR 225 crores upon commissioning. So we are expecting that these 2 projects would be commissioned by March and followed by Choraniya somewhere in June '27. Regarding the power transmission project, the company is advancing its power transmission portfolio across Odisha, Uttar Pradesh, and Jharkhand, where the progress across regulatory approval, engineering procurement, and on-ground execution has started. PSA has been executed for all 3 projects. At Angul, Odisha, [indiscernible] already has been received, and the foundation work is progressing, and the tower erection is going on very smoothly. At Jamshedpur, Jharkhand, route alignment has been completed, and with the land acquisition underway also. In Mirzapur, Uttar Pradesh, land has been identified; the lease agreement with the concerned authority is under execution. The engineering and procurement activities are progressing across all these projects, and for Angul, we have received the financial closure, and for other projects, financial closure is targeted to be achieved in the coming quarter. This is the update regarding 5 new HAM assets, which have been monetized. So during quarter 2, the company has successfully transferred 51% of its shareholding in OD-5, receiving partial consideration of INR 103 crores. The remaining holdback amounts are expected to be received during quarter 3 and quarter 4 of FY '27, subject to achievement of respective commercial CODs and completion of certain purchase items. In quarter 2 FY '27, the company has also received an amount of INR 92.3 crores against partial release of holdback in all 4 earlier assets. Cumulatively, the company has received a total amount of INR 857.46 crores till September '26. Out of the total consideration, the balance consideration is expected to be received in quarter 3 and quarter 4, subject to final COD and completion of relevant conditions. With respect to the fifth HAM asset, Raipur-Visakhapatnam AP-1, the company has already received NOC from NHAI and lenders and expect to complete the equity transfer of AP-1 project in quarter [indiscernible] FY '27. Regarding equity requirements of all projects, the total equity required for all HAM, transmission, BESS and solar is around INR 3,050 crores. And as of September '26, INR [indiscernible]1,846 crores has been infused in these projects. The remaining equity will be infused in the later half of this year and FY '28 and FY '27. Moving on to the financial highlights of quarter 2 and first half of this year. At standalone, revenue has reached INR 883 crores with an EBITDA of INR 105 crores and an EBITDA margin of 11.9%, with PAT at quarter 2 at INR 32 crores at a margin of 3.6%, compared to INR 67 crores at a margin of 5.8% in quarter 2 FY '26. Revenue for the first half FY '27 reached INR 1,790 crores with an EBITDA of INR 182 crores and an EBITDA margin of 10.2%, and PAT for the first half FY '27 stood at INR 60 crores with a PAT margin of 3.4%, compared to INR 193 crores and a margin of 6.7% in first half FY '26. On a standalone basis, our gross debt stands at INR 1,595 crores. This comprises INR 714 crores of working capital debt, INR 400 crores of NCD, and INR 482 crores of term loans and current maturities, along with trade limits and other means of debt. With an expected collection from receivable monetization proceeds, we are targeting to close our standalone debt at INR 900 crores by the end of this year. Now regarding the consolidated financial revenue of quarter 2 FY '27, which reached INR 974 crores with an EBITDA of INR 250 crores and EBITDA margin of 25.6%. PAT for quarter 2 FY '27 stood at INR 80 crores with a PAT margin of 8.2%, compared to INR 52 crores with a margin of 5.7% in quarter 2 FY '26. Revenue for first half FY '27 reached INR 2,074 crores with an EBITDA of INR 553 crores at an EBITDA margin of 26.7%. PAT for first half FY '27 stood at INR 35 crores with a PAT margin of 1.7%, as compared to INR 151 crores at a margin of 6.3% in first half FY '26. We are targeting an order inflow of INR 10,000 crores to INR 11,000 crores in FY '27, with approximately INR 5,500 crores secured up to quarter 2 FY '27. Our growth prospects remain strong across roads, rails, metros, and power transmission, supported by upcoming infrastructure investment and government initiatives. We will continue to focus on high-quality projects, disciplined bidding, and timely execution while expanding our presence in emerging infrastructure segments. With a diversified project pipeline and prudent financial management, we are well positioned to drive sustainable growth and deliver long-term value to our stakeholders. I will now hand over our call to our IR advisor and request them to open the floor for the Q&A session.
[Operator Instructions] The first question from the line of Vaibhav Shah from JM Financial.
On asset monetization, so we have already monetized 100% stake in 4 assets. So initially, we had mentioned that INR 1,384 crores is the equity value. So roughly the gain would be something around INR 530 crores because the investment is around INR 850-odd crores. So what would be the tax impact on it? And when will we receive that amount in the P&L, because we are not seeing any major accruals on the P&L side in standalone accounts till now?
Basically, as we have accounted in the last 2 quarters, we have seen that these are the 4 projects which we already have monetized. So there is not a gain into equity because the net worth of all those 4 assets. So at least in OD-5 and OD-6, we have incurred significant loss in that net worth. So the collection is almost -- INR 550 crores of collection is yet to happen out of the 4 projects and 1 project which is yet to be monetized, like AP-1. So INR 550 crores of collection is yet to be there, which is we are expecting in quarter 3 and quarter 4.
And once that collection happens, then what would be the gain which we will be booking in the standalone accounts?
Standalone would be around INR 70-odd crores, which is likely to be there in quarter 3 or rather in quarter 4.
INR 70 crores of gain?
Correct. So because the consolidation -- the gain in consolidation, which as per the net worth number. So if you see the net worth is actually was having that different number and the collection or the amount of consideration, so I can refer you to in detail with our finance team, so they will tell you the entire details.
Secondly, in terms of the revenue guidance, so what would be the revenue guidance and margin guidance for FY '27? And can you throw some light on how the execution is going on in Pune-Shirur and what are our revenue targets for the same in this and next year?
So as of now, these are the 2 big sized projects, one is Pune-Shirur and Odisha, the CRR project, one of the transmission as well as Mirzapur projects. So these are all INR 6,000 crores of projects where the appointed date is likely to be there within the month, max by mid of December. So we are expecting in quarter 4, all the projects would be there with that revenue and the mobilization already has been done in all these projects. So we are expecting to be roughly around INR 6,000-odd crores by end of this year, if you see. And as well as the margin front, there is a significant -- now there is a considerable significance where we are around 11% because of the few projects incurred huge losses. And now we would be in the range of 13% to 14% of EBITDA for quarter 3 and quarter 4 and subsequent to this.
Because first half has been only INR 1,800 crores of revenue. So in second half, we record INR 4,200 crores, which is 50% higher than the last year second half. So we are very confident on that front.
So basically, all these projects where the appointed date immediately expected [indiscernible] -- being expected. So we -- in any of the scenario would be doing some INR 3000 -- INR [indiscernible] 4,500 crores to INR 3,000 crores in quarter 4. So this is giving that -- this is -- there is immense confident -- we are confidently enough that we would be able to do that part because the mobilization has been done in all such projects.
[Operator Instructions] The next question is from the line of Shravan Shah from Dolat Capital.
A couple of questions. Before I just have one clarification. This order book of INR 13,700-odd crores, INR 65-odd crores. So does the unbilled revenue have we removed from this? So I just wanted to say when this will be executed, we will be booking this entire as a revenue or this minus unbilled revenue?
I think the contract asset is the execution was a part of execution. The contract asset or unbilled revenue is already being executed so -- as far as physical progress is concerned. The financial is, okay, there's only collection which is going to be there. So it would be, again, once we bill them, once we invoice them, then the collection would be there. It's already been executed. So this is a net of INR 13,800-odd crores, net of total projects, which are yet to be executed as the balance part.
Okay. So this does not include the unbilled revenue. So to be -- to put it in a simple word, whenever we will be executing, let's assume we will be executing this entirely in next 2 years. So this number will translate into the revenue, the exact number.
Correct.
Okay. Okay. Got it. Sir, now coming back to what Vaibhav has asked, so further to dwell down on that. So if you can specify the segment-wise because the number that we are looking at INR 4,200 crores kind of a revenue. And correct me if I heard wrong, we are looking at INR 3,000 crores to INR 3,500 crores revenue in the fourth quarter. And if that's the case, then in the third quarter, we are looking at kind of a similar INR 800 crores, INR 900 crores kind of a revenue. So just to dwell further how each segment-wise, if you can specify in the second half, how much revenue we are looking at in the HAM road EPC and there, obviously, the Pune-Shirur is the major one, then railway, solar, BESS transmission, each segment-wise, if you can specify, would give a much more confidence that we can achieve this kind of revenue?
Of course, I think as far as the battery is concerned, these [indiscernible] 2 projects likely to be commissioned. So with that, we are assuming that INR 350 crores of this would be there in the second half of this year, INR 350 crores and around INR 300 crores of transmission revenue, which is likely to be there. So there is around INR 340 crores plus INR 300 crores of transmission. And as far as rail metro is concerned, we are expecting that we would be touching roughly around INR 1,400-odd crores of top line in this half of this year, if that includes New Delhi, RVNL balance portion, which is yet to be billed as well as Gaya project, Aurangabad, Dhule, Thane Metro, even just started where a small portion has been just picked up. So these -- and even Kanpur Railway station. So these are almost INR 1,400 crores. So put together is around INR 2,000 crores balance is going to be from all 6 HAM. So the 5 HAM are aggressively pushing at a very advanced stage like Jharkhand Package 10 and 13, major contribution would be coming from these 2 projects. So this is roughly around INR 700-odd crores to be executed in these 2 projects, Jharkhand Package 10 and 13. There is [indiscernible] which would be executed in that. And even other projects like Narol, Ayodhya, Tirupati. These are the 3 projects for HAM, which again would be contributing around INR 600-odd crores in this particular phase of 2 quarters. Pune, we are expecting to be there around INR 600-odd crores, which is likely to be there, which we are going to see that already mobilization being done, utility shifting is at advanced stage. So this project is going to contribute at least INR 600 crores for this next half of this year. So put together, along with certain projects like Tumakuru is there and Jamshedpur EPC project, some small portion is balance of HAM projects, which are being monetized even in Karnal, small portion is balance. So around INR 200 crores. So it is likely that we would be around -- doing around INR 4,200 crores of project, likewise.
Got it. So -- and then as you said that in the second half, we will be looking at 13%, 14% kind of a margin and going forward also '28, we will be seeing the similar 13%, 14% kind of margin? And in terms of the order inflow, particularly, so how much we have bidded? And there also, just wanted a clarity in terms of particularly on the road side, obviously, we would be looking at that. So recently, the UP -- many, many projects got canceled the tenders which were there as part of tenders. So just wanted to understand how much -- how many projects across the different segments that we have bidded of that bid is yet to open and how much more we are likely to bid so that we can get an idea that whatever we are looking at INR 5,000 crores, INR 6,000 crores more inflow in this second half?
So there are other projects also, if you are saying that apart from NHAI HAM or [indiscernible] the projects. There are not many projects. It's around INR 7,000-odd crores of projects which we already have bidded and the results are yet awaited. Railway around INR 5,000 crores of projects. So if we are seeing that how we are confident that we would be at least looking at INR 5,000 crores to INR 6,000 crores of new orders to be being awarded for the 5 months. So looking into state like [ MSRDC ] has already again invited those projects which were canceled. So the invitation is there. [indiscernible] already has been floated. Again, the state government, Rajasthan government is again to -- RSRDC going to bid for their 2 expressway in the next 4, 5 months. NHAI is having the pipeline, which is giving us the confidence that even the rail metro, like in metro, we have already bidded projects, big size INR 1,300 crores in Jaipur Metro and one in Delhi Metro. Ahmedabad Metro is having a few big-sized projects like INR 7,000 crores of project or 4, 5 projects are there. So this looks a mix of opportunity where we are hopefully and transmission also, but we are quite hopeful that we would be able to just add this number.
Okay. So similar kind of INR 8,000 crores, INR 10,000 crores plus kind of an inflow even, let's say, if we -- maybe 1 or 2 months delay, if it would be there by March, maybe April, May. So similar broadly inflow in the FY '28 also one can look at so that what previously we are looking at in terms of the INR 7,000 crores kind of revenue in FY '28 can be -- can be achieved?
It's quite possible.
[Operator Instructions] The next question is from the line of Harshul Sharma from AS Advisors.
Sir, can you throw some light on what would be the guidance for the fiscal and FY '28?
As we are discussing that we are targeting that at least with this last 1 year and this year, we are not having that much of revenue because of slow awarding a [indiscernible] delay, but quite hopeful that we would be doing around INR 7,000 crores in '28.
Sir, by when can we see an uptick in the order inflow?
So the orders are already there. So only a matter of time which has been there, the land acquisition and the DPR, these are all at NHAI and ministry level. So we are seeing that -- the traction is there, but we are quite hopeful in this year around 1,200-odd kilometers is likely they suggest -- they are targeting to be awarded. And other projects like MSRDC, UPEIDA and even in Rajasthan state. So these are the state expressways for roads. For rails, I think some big size projects already -- the tenders are there. So these are the INR 1,000 crores to INR 5,000 crores projects with rails and new lines like metro also. So the pipeline is a mix of -- in all these sectors, it's a mixed pipeline, so which we are quite hopeful that we would be able to get.
[Operator Instructions] The next question is from the line of Deepak from Svan Investment.
I just wanted to check it out on this sharp increase in the commodity prices. If you can throw some light on our energy vertical, one on the BESS. And secondly, the project which we have got from the month of April onwards, especially large [indiscernible] how should we see the margin profile in these projects. And in the battery are these change in product prices or lithium prices, is this completely pass -- does it have a complete pass-through mechanism? Or how should we look into all these assets?
So as far as highway is concerned, definitely, we have seen the commodity but being protected by the realtime price escalation for bitumen and crude POL. For rail projects, there has been a hit and we have taken that hit is going to be there, which we have seen that -- not a big number is going to be there because we are not having many rail projects which are having OHE and S&T kind of [indiscernible] in civil work, it is not that impacted. Steel and cement and aggregate is not that big impact is there. For bitumen, it is there. For transmission, BESS has been impacted. But then again, we have [ taken ] that earlier margins in BESS was quite high. Now it has been around 12%, which has been now -- earlier it was supposed to be 20-plus because of this dollar and currency as well as battery prices. But that has been covered and taken into consideration as of now. The transmission, where aluminum and copper is playing where the commodity prices have gone a bit 30% to 40% plus at the number which we have bidded. But then we have taken into our bid consideration, the price escalation, which have already been covered in our budget. So we are not likely to be hit severely into the commodity increase.
[Operator Instructions] The next question is from the line of Rahul [ Bhutra ] from Anand Rathi.
I just wanted to understand, I am seeing interest income is coming up on account of contract modification. So can you just give me the color like what was it about?
Interest income is basically there are a few projects of Maharashtra where we received INR 18-odd crores that has been booked into other income.
So sir, is there any revenue apart from the interest income, which flows into our top line?
No, no.
Due to this contract modification?
No, no, not there.
Okay. And second, sir, I see in this first half, we have invested around INR 350 crores in contract assets. So -- and it has been seen over the period of time, our contract asset is bulking up. So what is the reason for that, sir? Is there any slowness in terms of billing of our -- getting the approval for our billings and which segment is causing for the contract assets to bulking up?
So basically, we have seen that wherever the debtors were there. So we have seen a significant reduction, but debtors at March and now number where the collection is quite now at a significant pace. But the contract assets, significant amount is being stuck in the railways because the milestones and the commissioning because in that particular -- those particular projects, there are certain conditions that around 10% of the total amount would be only paid once we commission the entire project and hand over those projects. So now this is a significant amount is around INR 580-plus crores into railways. And others do have a mix of it, but the HAM project is again having a significant number, where these projects which we already have monetized and Karnal ring road -- including Karnal ring road even. So they are the projects where the certain COS variation items and even in Adani project Ganga Expressway, there's a variation item, which is around INR 180-odd crores from UPEIDA already has [indiscernible] sanctioned has been there. But then there is a certain amount of variation, which is yet to be approved from Adani. So there are a mix of these 6 HAM projects, there's around INR 700-odd crores, which we are likely to be collected in quarter 3 and quarter 4. So this contract asset, which has now been increased [Foreign Language] significantly it has gone to INR 2,100 crores would be roughly in the range of about, say, INR 1,500 crores or rather INR 1,200 crores to INR 1,500 crores by March end. So INR 800-odd crores of collection is likely to happen.
[Operator Instructions] The next question is from the line of Shravan Shah from Dolat Capital.
Sir, first a couple of balance sheet data points. So this unbilled revenue will be the entire contract asset of INR 2,165 crores would be the unbilled revenue as on September?
Yes, yes.
Okay. Mobilization retention money and HAM, solar, Ganga Railway, BESS debtors, if you can specify...
So the mobilization is around INR 502 crores -- INR 515 crores and if you are talking about debtors including retention, so INR 840 crores is the debtor amount and INR 203 crores is retention for all this asset part. Stock is around INR 495 crores. And I think the advances to supplier has gone very high because we have booked all the material as well as the GST balance with authority is INR 288 crores. Cash bank balance is around INR 163 crores. Borrowings already we have [indiscernible] and the trade payables has significantly dropped from INR 1,633 crores, now it is INR 1,188 crores.
Yes. Sir, what would be the HAM debtor, solar debtor, railway debtor, BESS debtor?
Roughly as I explained about the HAM -- contract asset portfolio. Now in HAM, again, SPV solar is around INR 236 crores, transmission is around INR 70 crores, BESS and transmission. HAM is, again, is a significant INR 500 crores around in HAM. Rail is a very small portion, and certain amount is received from Adani even INR 113 crores.
Got it. And this quarter, the other income you highlighted that it is for Maharashtra that we have got INR 18 crores. So from Q3 onwards, the other income will come back to the normal run rate of INR 3 crores, INR 4-odd crores?
No, we are having certain conciliation claims where we likely we might get these, but not a very significant amount would be there.
Okay. And in terms of the CapEx, INR 66 crores we have done in 1H. So in second half, how much more and for next year, how one can look at the CapEx?
CapEx -- major CapEx is all Pune projects where we are doing the launches and other -- not very big into investment into equipment, but these are the shutters, et cetera, which roughly would be INR 50-odd crores, which by the balance part of the year.
And next year would be a similar INR 100 crores, INR 120 crores kind of CapEx?
Yes, yes.
Okay. Okay. And sir, this Karnal Ring Road also in terms of monetization, this would also will be done by this March? And how much broadly one can look at in terms of the value, the similar kind of 1.5x price to book that way one can look at?
No, no it's not likely to be by March because once we receive the PCC, then 6 months the cooling period, and we'll be applying for this monetization permission from NHAI and bank is going to be at least 8 to 10 months from now. And though we have received the [indiscernible] , this offer from investor, but the number likely would be not that big this project because of the price indexing. But again, it's quite that within the 2 months we are going to close, we would be able to close this.
So deal would be done in the next 2 months. But in terms of the cash receipt, you said it would take 8 to 10 months...
Probably in quarter 2 next year.
Okay. And the 5 total that we have monetized, so out of INR 1,384 crores, we have received -- yet to be received is INR 550-odd crores that we will be receiving third and fourth quarter and plus the AP-1. So that amount will also be included in the pipeline -- including everyone, INR 550 crores, okay. Including the AP-1. Okay. Got it. And sir, just the dates that from INR 1,600-odd crores, we are looking at INR 900 crores by this March. So in terms of the finance cost, so now INR 50 crores, INR 51 crores this quarter. So how one can look at the finance cost third, fourth quarter onwards?
No doubt, I think the finance cost is because of it's very surge in the debt. So by dropping it to that number, in quarter 3 and quarter 4, roughly, we are expecting that INR 80-odd crores of finance cost would be there. Next year, the financials likely will be stabilized at INR 110 to [indiscernible].
[Operator Instructions] The next question is from the line of Rahul from Anand Rathi.
Sir, this contract liability, which we see is increased by INR 273 crores. So can we say that this is a mobilization advance that we received for the Pune-Shirur project? Is it the right to understand that?
Yes, it is INR 170-plus crores from Pune-Shirur, one of the projects where we have received some amount.
Okay. Got it. Second, sir, again, coming to the contract assets. So can we see this is the peak level and from here on, it will reduce as we execute further projects? Because what we see -- what we are seeing is even after getting all the monetization process, maybe even partially, our debt levels are not coming out. It is getting blocked in the working capital. So how should we see? This is like a peak working capital that we're looking at and now from here on, it should start coming down?
So almost the plateau has been reached in the last quarter only. Now significant drop is likely to be there, be it say, if you see the debt part, if you see the contract asset part, where the balance sheet is showing this number. And then the realization by end of this year is going to be significantly reducing the debt because contract asset is likely to be reduced by almost INR 700 crores to INR 800 crores by year-end. Debtor would be in the similar range as we are now and creditors would be in the similar range as of now.
And sir, just last question on the technical part. So I believe we participated in all the packages of the Link Expressway of UPEIDA. But somehow technically, we got disqualified. So what was that reason for the technical disqualification?
There were almost 5 to 7-odd contractors who were disqualified or I think for a small technical reason, which is probably all missed.
Okay. Got it. So sir, so are there any such technical challenges would be there in the MSRDC projects or now that they are being protected?
MSRDC projects which are invited now, use the same qualification criteria some 3 years back when we have qualified for that. That is the same. So the bid is only RFP, not RFQ.
The next question is from the line of Vaibhav Shah from JM Financial.
Sir, when do we expect to receive appointed date for the Capital Region Ring Road, Package 3?
November end of first week of December. So both for Pune, Shirur, and this project.
Okay. So the revenue which we are seeing in Pune roughly around INR 130-odd crores in the first half, it is mainly because of utility shifting and...
[indiscernible] certain preoperative expenses, globalized expenses, which were also there while -- it is a project basically. So we have splitted that to enable getting the cash flows and billing. So that was a small amount which was also there.
And you are targeting roughly INR 700 crores revenue for FY '27 from Pune-Shirur?
Quite right.
[Operator Instructions] The next question is from the line of [ Arpan Gandhi ] from [ A.J. Capital ].
I wanted to ask when can we see improvement in margins? And when can we see the margins level go to around 15% and above like it was in previous fiscal?
Probably at the current scenario, it not looks like because of the geopolitical commodity prices as well as the competition all across entire infrastructure, we are not very much confident in the coming 1 to 2 years is going to be there...
[Operator Instructions] Ladies and gentlemen, that was the last question from the participants. I would now like to hand over the conference to management for their closing comments. Thank you, and over to you, sir.
Thank you for joining us today. We remain confident in our continued success and are here to address any further questions. Please feel free to reach to us and our IR adviser.
Thank you. On behalf of Go India Advisors, that concludes this conference. Thank you for joining us, and you may now disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete H.G. Infra Engineering Limited transcript - plus 261,000+ transcripts from 13,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.
Get an API key View API docs →For developers and AI pipelines
Programmatic access to H.G. Infra Engineering Limited earnings transcripts and 261,000+ others is available through the
EarningsAPI REST API and the hosted MCP server.
Quarterly plans from $145 - full transcripts, speaker segments, full-text search,
and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.