Operator operator
#1

We appreciate everyone holding on. Speaking as the conference operator, I'd like to welcome you to the Artemis Gold conference call covering fourth quarter 2025 results. Please note that everyone attending is currently in listen-only mode, and this call is being recorded. Once the presentation concludes, you'll have a chance to pose questions. If you'd like to enter the question queue, simply press star followed by one on your phone's keypad. And if you require help at any point during this conference, pressing star then zero will connect you with an operator. At this time, I'll hand the conference over to Ms. Meg Brown, Vice President of Investor Relations. Please proceed.

Meg Brown executive
#2

Thanks, operator. Morning, everyone, and welcome. Appreciate you joining our Q4 conference call and webcast. Before we get started, I'd like to remind everybody that some statements on today's call might be forward-looking, and we encourage you to refer to our public filings and disclosures, including the cautionary language in yesterday's news release, for a more detailed discussion of potential risks and uncertainties related to these statements. I'll now hand the call over to Artemis Gold's CEO, Dale Andres. Over to you, Dale.

Dale Andres executive
#3

Thanks, Meg, and thank you all for being with us on this morning's call. Joining me today are our President, Jeremy Langford; our CFO, Gerrie van der Westhuizen; our Chief Business Development Officer, Tony Scott; our Chief ESG Officer, Candace Alderson; and our VP, Finance, Eric Marchand. Along with me, Gerrie and Jeremy will walk through the quarter's highlights, after which we'll take your questions. Before turning to the quarter, I want to draw attention to the dividend announcement we made yesterday. Our board approved a progressive dividend policy, featuring an inaugural base quarterly dividend that begins in the second half of this year. As shown on slide four, we intend to begin with a fairly modest base dividend of 5 cents per quarter during the second half of this year, increasing to 8 cents per quarter in 2027. We expect shareholder returns to rise progressively as we near the end of our EP2 construction period, at which point we plan to return 40% of available cash flow to shareholders beginning in 2028 and continuing beyond. That comes through a base dividend as well as a variable return component, which could include additional dividends and possibly share buybacks.

Dale Andres executive
#4

We might look at possible share buybacks on top of the base dividend as soon as 2027. This dividend policy shows our confidence in how strong and sustainable our operating cash flows are, and in how we are developing the Phase 1A and EP2 expansion projects at the Blackwater Mine in a disciplined way. As a key element of our capital allocation framework, this policy puts Artemis among leading peers and balances reinvestment for growth with returns to shareholders, while giving us flexibility in the near term to grow Blackwater into a producer of more than 500,000 ounces a year, and we are on track for that. Moving to slide five, and as I think back on the year, 2025 really was a transformational year for Artemis, and it truly is a testament to our team's ability to deliver. A lot has happened over the last year. It is amazing to think we poured our first bar of gold just about a year ago, on schedule and on budget, and from there we moved very quickly from first gold to commercial production in May, hitting nameplate capacity before the middle of the year. We produced almost 193,000 ounces of gold for the first full year, and that was within our original guidance range.

Dale Andres executive
#5

We've secured the next stages of our growth, starting with the Phase 1A expansion to 8 million tonne per annum processed, which we announced in September, and then in December we announced the EP2 project — a transformational growth project that lifts processing capacity by over 250% to 21 million tonnes per annum. These projects — and Jeremy will talk about our progress on them a bit later — are going to make Blackwater one of the three largest gold mines in Canada. Our finance team has been very busy as well. Refinancing the project loan facility with a revolving credit facility in July gave us more flexibility for funding the expansion project, and the team has now set up the balance sheet with incredibly priced long-term debt that matches this long-term asset well, and Gerrie will give a few more details on that shortly. It's been quite a year, and I'm really proud of the team for delivering on all of these accomplishments. On slide six, this shows the operating highlights for the quarter. We hit a new record for gold production despite shutdowns, including a full ball mill reline and an unplanned mill motor replacement. We produced over 68,000 ounces of gold in the fourth quarter at an all-in sustaining cost of US$925 per ounce of gold sold.

Dale Andres executive
#6

When you look at it on a post-commercial production basis, we ended the year at $869 US an ounce. That matters, and it landed inside the revised guidance range we set. It also matters that we got there with no lost-time incident. Mill throughput came in a bit below Q3 because of the shutdowns I referred to, though higher grades more than made up for that as we went deeper in the pit, and higher recoveries did too as we keep optimizing the processing plant. Our low-cost standing, together with the strong gold price environment we're in right now, adds up to an all-in sustaining cost margin that leads the industry, and for the fourth quarter that figure was roughly $2,300 per ounce. Slide seven illustrates how we keep delivering and how we performed consistently right through 2025 across the whole year, and how we keep optimizing. A few quick remarks. Mining is broadly going quite well. The orebody keeps showing that we're mining more medium- and low-grade material than we had anticipated, and at this point we have a stockpile of close to 14 million tonnes ready to feed the mill. We've kept nudging our gold recoveries upward by adjusting the feed blend going into the plant along with various parameters and reagent consumption, and that has lifted recoveries to above 88% for the quarter.

Dale Andres executive
#7

If you look at slide eight, you'll see several of the capital projects we kept advancing during the last quarter. A key element of our environmental stewardship is water management infrastructure. The tailings dam and freshwater reservoir in the bottom two photos are essential components of that management system. In the fourth quarter we commissioned a metals water treatment plant close to the mill, and a new membrane water treatment plant at the tailings facility is going to be finished in the summer of this year, and we also made solid progress on that during the fourth quarter. A number of rectification and improvement projects around the processing plant remain in progress, and that includes continuing to enlarge the ore stockpile footprint more quickly than anticipated, again because of the higher stockpile tonnages I mentioned, but our progress on these items is very good, and we are well positioned to meet our targets and guidance for this year. At this point I'd like to hand the call over to Gerrie to talk through our financials. Gerrie?

Gerrie van der Westhuizen executive
#8

Thanks, Dale, and good morning, everyone. If we move to slide nine, I should mention right off that the figures I'll be going through are in Canadian dollars, unless I say otherwise. For the fourth quarter, revenue came in at $334 million, adjusted net income was $146 million, and adjusted EBITDA was $237 million. In that quarter, the average realized price we got for gold on ounces sold into the spot market came to more than $5,800 Canadian per ounce. It's worth noting that this quarter saw the first meaningful delivery — 22,000 ounces — into our mandatory hedge book, which is tied to our former project loan facility, at a price of $2,820 Canadian per gold ounce. From one or two of the early analyst notes I've come across, there seemed to be a hint of some surprise regarding those 22,000 ounces we delivered into the mandatory hedge. As a quick reminder, the schedule for our remaining mandatory hedge deliveries is in fact disclosed in note 21 of the annual financial statements and in our MD&A, and it was disclosed in earlier MD&As as well. So if shareholders review that disclosure, you'll see that 68,000 ounces of gold under the mandatory hedges are scheduled for delivery in 2026.

Gerrie van der Westhuizen executive
#9

I want to take this chance to add a little more detail, since 2026 deliveries are weighted toward the front end. Specifically, 25,000 ounces under the mandatory hedge come due in Q1 of 2026, then 16,000 ounces in each of Q2 and Q3 of 2026, with the 12,000-ounce remainder landing in Q4 of 2026. Our voluntary hedge disclosures are available in those same notes as well. There are 21,000 ounces remaining at $3,350 Canadian per ounce, to be delivered between March and the end of Q3 2026. This has likely gone on longer than anyone wanted to hear me discuss hedges, so I will note that, overall, with record production in Q4, we sold 8% more ounces in Q4 than in Q3. We saw a marginally higher production cost, but all-in sustaining costs sit in the lowest decile of the global cost curve, which means industry-leading margins on ounces sold into the spot market, and the higher production simply converts into record cash flows from operations of $198 million Canadian. That covers the various factors affecting EBITDA and adjusted EBITDA. Earnings for the quarter overall also gained from lower borrowing cost on the revolving credit facility after the extinguishment of our former project loan facility at the end of Q3, and this was partly offset by higher non-cash deferred income tax tied to the higher earnings we posted for the quarter.

Gerrie van der Westhuizen executive
#10

Meg, let's move on to slide 10. After the quarter wrapped up, we announced and completed a Canadian corporate bond offering worth $450 million. It was oversubscribed three and a half times over, and beyond that, it marked the first Canadian mining bond issuance in over a decade, as well as the biggest B-category Canadian dollar issuance in roughly 14 years. At 5.625%, the coupon stands as the lowest inaugural coupon in a dozen years. Thanks to the undeniable quality of the Blackwater asset, Artemis also became the youngest company ever to receive a credit rating from S&P. We directed the bond offering proceeds toward substantially paying down the RCF, and at present we have a balance of just about $15 million owed on the RCF, which we're actually in the process of paying down over the coming days. On a pro forma basis, taking into account the $168 million Canadian cash we had available at the end of December plus the $685 million available to us under the RCF immediately following the bond's closing, our available liquidity on a pro forma basis comes to $853 million Canadian. To sum up, we're in a very strong financial position, with a cash position that's increasing as we speak, along with the financial flexibility to fund organic growth and begin returning capital to shareholders.

Gerrie van der Westhuizen executive
#11

Moving to slide 11, let me restate the 2026 guidance we put out not long ago. At Blackwater we anticipate yet another robust year, and our full-year outlook calls for gold output of 265,000 ounces to 290,000 ounces, with an all-in sustaining cost between US$925 per ounce and US$1,025 per ounce. That ranks among the lowest all-in sustaining costs anywhere in the industry, which means very appealing margins at today's gold prices and even at prices considerably below them. Consistent with our growth strategy and the Phase 1 and Phase EP2 plans we announced in the latter part of 2025, we expect to invest roughly $670 million to $745 million Canadian during 2026. A bit later, Jeremy will point out where those funds will be deployed to make sure 2026 is another transformational year for Artemis Gold as we keep delivering on our growth plans. With that, I'll hand things back to Dale.

Dale Andres executive
#12

Thanks, Gerrie, and I hope everyone found the extra detail Gerrie gave on the 2026 hedge deliveries useful. As we look forward, Blackwater is right in the middle of an exciting growth phase: we plan to reach gold production above 500,000 ounces per year by the end of 2028. That comes through continued optimization of the current Phase 1 build, delivery of Phase 1A by the end of this year, and finishing construction of the EP2 project in Q3 of 2028, then ramping up to full capacity by the end of that year. Starting in 2029, we'll be producing at that rate of 500,000-plus ounces. Beyond EP2, we think Blackwater holds tremendous potential for further growth. We're advancing studies on a range of technology initiatives — conveyor systems, electrification of our haul fleet, and autonomous haulage — which could deliver a meaningful improvement in unit costs. We're also actively drilling to support our resource conversion, resource expansion, and regional exploration programs, and that will feed back into our strategic planning process as we assess both life extension and further growth opportunities beyond EP2. I'll now hand the call over to Jeremy, who will give progress updates on both Phase 1A and EP2 over the next couple of slides.

Dale Andres executive
#13

Jeremy, the floor is yours.

Jeremy Langford executive
#14

Thank you so much, Dale. Morning, everybody. Progress on Phase 1A is coming along quite nicely — every major equipment package has been ordered, and the engineering design teams have finished the material take-offs respectfully for the mechanical, piping, and electrical bulk disciplines. Back in December '25, we wrapped up the foundations for the two new leach tanks, which you can see in the photo on slide 13. At the same time, we've begun pouring the Vertimill base foundations. After those wrap up, we'll move on to the foundations for the new purpose-designed mill building. As we move through to mid-2026, we expect to reach a number of key milestones on the 1A expansion — for example, finishing the engineering design and drafting of the 1A scope of work, starting leach tank erection on-site at Blackwater, and starting construction of the Vertimill building. It's worth noting that since this is a brownfields expansion, the team's actively looking to performing some works on an opportunity basis without impacting the current operating asset. Things are working pretty well there. Overall, we're on track to hand over the new facilities as we progress through the year, and we're expecting to realize the increased 8 million tonne throughput per annum late this year in 2026.

Jeremy Langford executive
#15

Moving on to slide 14, regarding EP2: besides the 18-megawatt SAG and ball mill orders we placed in Q3 of last year, we've also placed a number of orders for other long-lead equipment — things like the gyratory, secondary, and pebble crushers, the oxygen plants, sulfur burners, and CIP cells. In our view, these orders, together with secured delivery times, have clearly taken risk out of the construction schedule overall. At Blackwater, our focus has largely been on progressing the new construction camps, which will let us ramp up the construction workforce as needed as we head into full construction activities later this year. We've already built and commissioned more than 100 additional rooms in 2026, on time and on budget, and we're working toward adding another 500-odd rooms before mid-year. The camp building supports, along with some of the foundation work, are being fabricated off-site right now. Some of this has already arrived, and we're currently receiving the additional triple-stack, or three-level, camp buildings on-site as we speak, ready for the next tranche of camp expansion. As I mentioned, we expect this camp to be completed before mid-year. In parallel, we're also shifting our attention to the EP2 plant site earthworks, which we're on target to begin during Q2 of this year.

Jeremy Langford executive
#16

Also worth noting, we intend to send the first of those 18-megawatt ball mill parts from the European fabricator over to Blackwater within the next few weeks, and the remaining main mechanical components for the ball mill will show up progressively through the balance of this year. That's certainly one more way to reduce risk — having it in our laydown yard on site long before we actually need to build it. Before I pass things to Dale, I can say that the growth projects — Stage 1A, the 13 million tonne per year EP2 early works, and the EP2 plant engineering and design works — are all moving along very nicely at present, with the owners and the engineering team together meeting their near-term targets and objective, in what has been a fairly strong performance so far this year. Dale, over to you.

Dale Andres executive
#17

Thanks, Jeremy. I’m eager to see Jeremy give more updates as the year moves forward on both Phase 1A and EP2. If we go to slide 15, the last one, to sum up: we really do have an asset that is robust in both size and scale—and we’ll demonstrate that as we build it out through Phase 1A and EP2—but it also sits in what we consider one of the finest mining regions anywhere in the world, including access to low-cost, renewable hydroelectric power. Our first year—our inaugural year—has gotten off to a very solid operational start, with the team reaching nameplate capacity in a very short span of time, and we’re in excellent shape to hit our guidance for the current year. We’re building a track record of capital discipline and cost control, and delivering one of the industry’s lowest all-in sustaining costs. Our balance sheet is strong, with a growing cash balance expected as the year progresses, which should support our many transformational near-term growth efforts—in particular, as I mentioned, the Phase 1A and EP2 projects. I’m proud of where we’re taking this company and of how we value our people and the communities where we operate, and we remain focused on building long-term value for our shareholders—and now, I’m very pleased to say, that includes capital returns.

Dale Andres executive
#18

With that, we're finished with the presentation. We'll now turn things back to the operator for the question-and-answer session. Thanks.

Operator operator
#19

Thanks. At this point we'll move into the question-and-answer portion. If you'd like to get into the queue to ask a question, just press star followed by one on your phone's keypad. A tone will confirm that your request has been received. Should you be on a speakerphone, please lift the handset first before you press any keys. If you want to take your question back out, press star followed by two. We'll hold briefly while callers are joining the queue. Our first question comes from Harrison Reynolds at RBC. Go ahead, please.

Harrison Reynolds analyst
#20

Hey, Artemis team — congrats on wrapping up Blackwater's first year, and it's great to see the new capital allocation framework. I was just wondering whether you could share any detail on how operations are going so far in 2026. There was some downtime in Q4, and I'm wondering how the mill has been performing and how grades are reconciling.

Dale Andres executive
#21

Thanks, Harrison. So we're clearly around the halfway mark of the quarter, and the year's still young, but like I mentioned, we're in a really strong position. I'd just add a few bits of color on that. When we brought the mill online last year, we were pouring first gold and commissioning that mill in the depths of winter, at the end of January into early February. I'd say we're far better prepared heading into this winter. We took those lessons learned and did the winterization before this winter arrived, and I'll tell you, despite some of the downtime in Q4, we had a very strong close to the year. And I'd say things are going very, very well as we begin this year too.

Harrison Reynolds analyst
#22

Okay, so perhaps we could pull back a bit and, in the context of that capital allocation framework, ask whether you might speak somewhat about how the company thinks about growth starting in 2029 and beyond. Clearly, that isn’t the priority at present, and getting EP2 built is what matters, but I’m curious whether, when you look at M&A over a longer horizon, that forms part of the strategy. This team has considerable expertise in mine construction and operations. I’m wondering whether the company’s approach leans more toward returning capital from 2029 onward or toward pursuing growth through both organic and inorganic routes?

Dale Andres executive
#23

I'd like to offer a couple of thoughts on that. As we laid out in our capital allocation priorities, keeping a solid balance sheet and putting money back into the projects we have now is essential — that's where our attention and priority sit today. Now, importantly, with this policy announced, we're returning capital to shareholders and providing clarity and certainty that 40% of free cash flow will come back as EP2 comes online in 2028. That does leave remaining cash flow. We genuinely believe we'll be generating very strong cash flow if the gold price holds anywhere near the current target through the build to fund the capital cost, but importantly in 2028 and beyond, there should be plenty of cash flow to weigh both additional returns of capital to shareholders and other growth prospects. That could include organic growth opportunities beyond EP2, and we're going to do a lot of work in 2026 around mine plan optimization, resource to reserve conversion, resource expansion, exploration in the district. We're really going to push forward our longer-term organic growth strategy as we move through 2026. From an M&A standpoint, I'd just say our primary focus is on growing internally. We do have a team that is both capable and has the capacity to look for opportunities.

Dale Andres executive
#24

That’s something we’ll keep doing, though at the moment internal growth is where our attention is. Probably best just to leave it there.

Harrison Reynolds analyst
#25

Excellent. That works for me. I appreciate the specifics and for answering my questions, and once more, congratulations.

Dale Andres executive
#26

Appreciate it, Harrison.

Operator operator
#27

Our following question comes from Jeremy Hoy at Canaccord Genuity. Go right ahead.

Jeremy Hoy analyst
#28

Hello, and good morning. Thank you for allowing me to ask a question. In fact, my question mirrors the one Harrison raised regarding 2020, 2028, and the years after, since when I examine it, cash accumulates fairly quickly in my model. I appreciate the detail you provided on that. Turning back to the present emphasis and the construction of EP2, has any additional conservatism or set of safeguards been incorporated into that schedule? I am thinking of the summer fire season, which was something that disrupted Phase 1 construction, and notably your team kept working through it and the project was delivered. So I am curious which lessons have been carried over into EP2 when it comes to mitigating risk?

Dale Andres executive
#29

I'll begin, and then I'll hand things over to Jeremy so he can add whatever he wants as well. I want to emphasize the early works phase and one of the main de-risking elements we've built into our strategy for EP2 — this early works phase — and really pushing forward on the four fronts Jeremy mentioned. First and foremost, advancing detailed engineering, which supports long-lead procurement. As Jeremy pointed out, we're making really good progress on those. Then from an execution standpoint, starting earthworks early, ahead of major works, and importantly getting the construction camps built before major works begin. I'm hoping we can even start a bit of concrete as early as we can. Getting those four elements — engineering, procurement, earthworks, and camp — ahead of starting major works, that really de-risks things. On lessons learned, I'll just comment on what you brought up specifically, Jeremy — the fire season. Last year we did very well. We weren't impacted by that even though fires were close. I think a lot of the area has been burned, and we're protected a little bit on half the perimeter, so to speak, because there's a mountain that's bald on the top.

Dale Andres executive
#30

From that, I'd say we're in a solid position. Jeremy, is there anything you'd like to add regarding risk management and the lessons we've learned?

Jeremy Langford executive
#31

Thanks, Dale, and hello, Jeremy. No, I’d simply like to say that, to give listeners reassurance, the key activities in the EP2 schedule are much more rigorous about when we begin and end those activities. There are also certain periods during the year when we have not yet chosen to run them on double shifts, but we do have allocations in the budget and the schedule to, for instance, operate a night shift over a different period if that became necessary. Jeremy, to answer your question briefly, I believe we have sufficient rigor and protection built into the schedule to meet the milestones and deliverable dates we have communicated.

Jeremy Hoy analyst
#32

Perfect, thank you gentlemen for the context. That's really helpful, and I'll return to the queue.

Operator operator
#33

Our following question is from Don DeMarco at National Bank Financial. Your line is open.

Don DeMarco analyst
#34

Thanks, operator, and good morning to Dale, Jeremy, and everyone else on the team. Dale, it's encouraging to hear that the operational and winterization measures are working well. Turning to recoveries, they've been trending higher. Should we expect that trend to keep building progressively through '26, or might it come more as a step change once the timing lines up with finishing the addition of an extra leach tank or regrind mill, and so on?

Dale Andres executive
#35

Thanks, Don. I'd say it's both. I think we're getting deeper into the deposit. We're getting better at our blending as we're doing more ore characterization and planning in the mill feed that we're feeding. I think we're also getting better at how we're managing that through the process and management of reagents, and just good continuous improvement, optimization efforts. Along with that, as we layer in the Phase 1A components, I think we'll start to see additional benefits, and whether that's the improvements we're making to our reagent addition systems, the additional oxygen supply, the additional tankage, all of those are going to help on recovery. As this is always a throughput versus recovery trade-off. We're trying to find the right balance between those two. I would say, importantly, as we build out the EP2 new plant that will be a whole separate and adjacent plant, that is still designed and planned to achieve our ultimate 93% recovery target. Like I said, we'll always make throughput versus recovery trade-offs, but we're still marching down that path. I would say all the way to 93% is still our target, but that's going to be over that kind of two- to three-year period as we do the full build-out.

Dale Andres executive
#36

My view is that we'll see steady gains from our current position toward that goal across the coming two to three years.

Don DeMarco analyst
#37

Great. So, Gerrie, turning to you now — thanks for laying out the pro forma liquidity picture so clearly, at roughly $853 million, which is a substantial figure. Do you feel comfortable sitting at that level, or do you see room to potentially lower the RCF limit, considering that cash flow from operations is fairly elevated at today's metal prices?

Gerrie van der Westhuizen executive
#38

Thanks for asking that. We feel quite good about things as they stand today regarding whether our liquidity is adequate. When we closed the bond, we did note that over the short to mid term we might look at chances and circumstances in which we could bring it down. As we get near finishing Phase 1A, I believe that will be a suitable moment for us to examine that even more carefully. To address what you asked initially, we are definitely comfortable with where we are. We recognize there is a chance to reduce, but yes, with the cash flows you referenced, this thing printing money, that is a great position for us and lets us fund our growth opportunities from it.

Don DeMarco analyst
#39

Thank you. And then one last question for you, Dale, returning to something you mentioned. I believe we're still expecting a resource update at year-end that could be on the way, I think. It's been noted before that re-optimizing at a higher gold price would bring in meaningful tonnage. I'm just curious whether you could speak to that. Should we anticipate that higher gold price in a pending release — we're seeing it across the street right now at a number of different levels, with some even above $2,000 an ounce. Just wondering when that potentially significant addition might appear, and what effect it could have on grades as well.

Dale Andres executive
#40

Appreciate that, Don. What I'd say is that EP2 has a great deal of room for mine plan optimization, in my view, and that comes from two places: the extra low- and medium-grade ore we're turning up, together with the stockpile we have now, and the chance to separate out the higher-grade sections of that stockpile, which creates optimization opportunities for EP2 once it's running. Then, as you mentioned, there are higher gold prices and resource-to-reserve conversion. We're also running resource extension drilling at the moment. Full optimization of that is something you should expect at the end of the year, since we want to fold in all the elements I just mentioned, including the drilling we'll carry out in the first half of this year, plus that positive reconciliation, into an optimized reserve and resource. In the coming weeks we'll put out what amounts to an update for the end of the year, which mostly reflects what we've mined to date, but the full optimization won't be in it. That takes some time to work through, and you should expect it at the end of 2026.

Don DeMarco analyst
#41

Perfect, that's really useful. I'm finished with my questions. Best of luck for the remainder of the quarter, everyone. Thanks a lot.

Dale Andres executive
#42

Thanks for that, Don. I appreciate it.

Operator operator
#43

Since we've run out of time today, that brings our Q&A portion to an end. I'd now like to hand the conference back to Mr. Dale Andres, who may have some closing remarks. Please go ahead.

Dale Andres executive
#44

Thanks, operator, and once more I appreciate all of you for being on the call. We hope we've managed to address every question you raised, and we're around to follow up on anything else you'd like to ask. We genuinely look forward to updating you on how operations are going, on what we're doing to optimize, and — importantly — on the growth we're seeing with Phase 1A and EP2 as the year moves along. Thanks once more, everybody.

Operator operator
#45

That concludes the conference call for today. You’re welcome to disconnect your lines at this time. Thank you for joining us, and have a pleasant day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Artemis Gold Inc. transcript - plus 132,000+ transcripts from 7,000+ companies, speaker segments and full-text search - through the EarningsAPI REST API or hosted MCP server.

Get an API key View API docs →

For developers and AI pipelines

Programmatic access to Artemis Gold Inc. earnings transcripts and 132,000+ others is available through the EarningsAPI REST API and the hosted MCP server. Quarterly plans from $162 - full transcripts, speaker segments, full-text search, and the /api/v1/transcripts/recent polling endpoint for ETL pipelines.